• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Contributions à la simulation temps réel des grands réseaux électriques modernes

Le-Huy, Philippe 22 June 2021 (has links)
La simulation des phénomènes électromagnétiques transitoires (EMT) est capitale dans plusieurs spécialisations de l'électrotechnique pour analyser, comprendre et prévoir divers comportements de réseaux électriques ou de dispositifs d'électronique de puissance commutée. Ces simulations sont typiquement réalisées sans contraintes temporelles : la simulation d'un événement peut être plus rapide ou plus lente que l'événement lui-même. Toutefois, dans un contexte de validation de systèmes de contrôle réel, les simulations doivent être effectuées en temps réel afin de soumettre l'équipement réel à des signaux réalistes avec le bon contenu spectral sur la plage fréquentielle requise. Une simulation opérant avec un pas de temps Tₛ est dite en temps réel si elle est en mesure de produire une nouvelle solution complète et d'effectuer tous les services nécessaires (entrées/sorties, acquisition, monitorage, etc.) en un laps de temps de Tₛ, et ce de manière maintenue et périodique. Les besoins de simulation temps réel ne cessent de croître pour étudier l'intégration des différents dispositifs d'électronique de puissance avec système de contrôle et protection qui prolifèrent sur les réseaux électriques et pour évaluer leurs interactions potentielles. Les réseaux à simuler sont de plus en plus vastes parce que ces dispositifs sont de plus en plus distribués spatialement. De plus, les modélisations sont de plus en plus complexes afin de représenter le plus fidèlement possible les phénomènes réels sur des plages de fréquence de plus en plus larges. Il existe donc un besoin criant d'augmenter la capacité de simulation temps réel. Pour y arriver, plusieurs groupes de recherche explorent l'utilisation d'unités de traitement alternatives telles les FPGA et GPU pour complémenter ou remplacer les processeurs standards tandis que d'autres explorent des modélisations et techniques pour augmenter la capacité de simulation des processeurs standards tels les équivalents fréquentiels, la simulation multitaux et la simulation hybride. Toutefois, la majorité de ces efforts vise l'augmentation des capacités en temps différé et non en temps réel. Afin de combler ce décalage, le présent ouvrage vise l'augmentation des capacités de simulation en temps réel des processeurs standards pour les grands et très grands réseaux électriques modernes c'est-à-dire où l'électronique de puissance foisonne et impose des pas de temps de plus en plus faibles. Deux avenues sont explorées : le parallélisme massif et l'augmentation de capacité par l'utilisation de simulation à taux multiples, qui mènera à la simulation hybride. En premier lieu, le parallélisme massif de la simulation temps réel est présenté. La puissance de calcul de superordinateurs n'est pas triviale à canaliser pour la simulation EMT temps réel à cause des difficultés de synchronisation. Une fois maîtrisé, le Superdome Flex de HPE a effectué la simulation en temps réel d'un réseau de 16432 nœuds électriques avec 372 cœurs de calcul opérant avec un pas de temps de 17 µs. Ces travaux sur les plateformes matérielles a également permis de découvrir les excellentes performances temps réel d'ordinateurs personnels ordinaires bas de gamme (RTPC) et très accessibles, ouvrant la voie à une démocratisation de la simulation temps réel. En second lieu, le cadre de simulation multitaux temps réel est présenté ainsi que les améliorations nécessaires à son bon fonctionnement. En simulant avec des taux plus lents que le taux de base EMT, il est possible d'augmenter substantiellement la capacité de calcul d'une plateforme donnée. Des simulations avec des pas de temps habituellement réservés aux FPGA (5 et 10 µs) sont effectuées sur de modestes RTPC En exploitant le cadre de simulation multitaux, il est ensuite montré comment la simulation hybride EMT/stabilité transitoire permet d'augmenter drastiquement (d'un facteur 23 à 10 µs et 1 ms) les capacités de simulation en temps réel d'un cœur de calcul. Toutefois, ce gain se fait au prix d'une perte de l'interaction harmonique entre le système EMT et celui de stabilité transitoire. L'implémentation temps réel de cette simulation hybride en temps réel est facilitée par l'utilisation d'une interface basée sur une modélisation hybride des lignes de transport et d'un protocole d'interaction parallèle, ce qui diffère de la méthode classique des images et des protocoles itératifs sophistiqués. Finalement, ces trois approches sont comparées : selon la situation, l'une de ces approches sera à préconiser selon l'ampleur de la simulation, la plage fréquentielle désirée et la quantité de ressources temps réel disponible. / The simulation of transient electromagnetic (EMT) phenomena is essential in several specializations of electrical engineering to analyze, understand and predict various behaviors of power systems and switched power electronic devices. These simulations are typically performed without time constraint: the simulation of an event can be faster or slower than the real event itself. However, in the context of validating real control systems, simulations must be performed in real-time in order to subject real equipment to realistic signals with the right spectral content over the required frequency range. A simulation operating with a time step Tₛ is said to be in real-time if it is able to produce a complete new solution and perform all the necessary services (inputs/outputs, acquisition, monitoring, etc.) in a period of time of Tₛ in a maintained and periodic manner. The need for real-time simulation continues to grow to study the integration of the various power electronic devices with control and protection systems that proliferate in power systems and to assess their potential interactions. The power systems to be simulated are increasingly vast because the spatial distribution of these devices is increasing. Moreover, model complexity is ever increasing in order to represent as faithfully as possible the real phenomena over increasingly wide frequency ranges. There is therefore a crying need to increase the capacity for real-time simulation. Several research groups are exploring the use of alternative processing units such as FPGAs and GPUs to complement or replace standard processors, while others are exploring models and techniques to increase the simulation capacity of standard processors such as frequency equivalents, multi-rate simulation and hybrid simulation. However, the majority of these efforts are aimed at increasing capacity in offline simulations, not for real time. In order to bridge this gap, this work aims to increase the real-time simulation capabilities of standard processors for large and very large modern power systems, i.e. where power electronics abound and impose smaller and smaller time steps. Two research avenues are explored: massive parallelism and increasing capacity through the use of multi-rate simulation, which will lead to hybrid simulation. First, the massive parallelism of real-time simulation is presented. The computing power of supercomputers is not trivial to harness for real-time EMT simulations because of synchronization difficulties. Once mastered, the HPE Superdome Flex performed real-time simulation of a network of 16,432 power nodes with 372 computer cores operating at a time step of 17 µs. This work on hardware platforms has also made it possible to discover the excellent real-time performance of ordinary low-end, but very accessible, personal computers (RTPC), paving the way for a democratization of real-time simulation. Secondly, the real-time multi-rate simulation framework is presented as well as the improvements necessary for its proper functioning. By simulating with rates slower than the base EMT rate, it is possible to substantially increase the computational capacity of a given platform. Simulations with time steps usually reserved for FPGAs (5 and 10 µs) are carried out on modest RTPCs. By exploiting the multi-rate simulation framework, it is then shown how the EMT / transient stability hybrid simulation can drastically increase (by a factor of 23 with 10 µs and 1 ms) the real-time simulation capacities of a computer core. However, this gain comes at the cost of a loss of the harmonic interaction between the EMT and transient stability systems. The real-time implementation of this real-time hybrid simulation is facilitated by the use of an interface based on hybrid transmission line modeling and a simple parallel interaction protocol, which differs from the classic equivalent image method and sophisticated iterative interaction protocols. Finally, these three approaches are compared: depending on the situation, one of these approaches will be more suited depending on the desired size of the simulation, the desired frequency range and the amount of available real-time resources.
2

Control and protection of distribution network with non-utility induction generators using EMTP-RV

Bakhshi, Hamidreza 11 April 2018 (has links)
Dans ce mémoire, des questions associées à la simulation en régime transitoire et à l'intégration au réseau de distribution d'une génératrice asynchrone privée (« NUIG : Non-Utility Induction Génération ») sont étudiées. L'objectif de ce travail est de vérifier l'influence de différents facteurs tels le niveau et l'emplacement de la charge et de la compensation capacitive ainsi que le type de charge sur les phénomènes d'auto-excitation de la génératrice asynchrone et les surtensions indésirables qui résultent d'un défaut et/ou d'une condition d'îlotage. Les résultats de simulation montrent que les phénomènes d'auto-excitation semblent très complexes et multidimensionnels et ils impliquent l'interaction de différents facteurs. Les courbes obtenues dépendent fortement des spécifications du système et il est difficile de dériver des critères précis qui puissent être appliqués de façon générale à tous les cas d'intégration de la génération asynchrone au réseau. Cependant, des principes directeurs pratiques pour limiter l'occurrence de l'auto-excitation ont été dérivés et selon ces principes directeurs, un système de protection et un réglage de rélai recommandés sont présentés pour l'interconnexion de génératrices asynchrones privées (« NUIG ») au réseau de distribution. / In this thesis, some topics related to the dynamic simulation and operations of Non-Utility Induction Generation (NUIG) are investigated. The objective of this thesis is to put focus on the influence of different factors such as load and capacitive compensation levels and positions as well as load type on induction generator self-excitation phenomenon and related overvoltages, resulting from a fault and/or an unwanted islanding condition. The results of simulations showed the self-excitation phenomenon appear to be very complex and multidimensional and implying the interaction of many different factors. The obtained curves and behaviors highly depend on the system specifics, and it is difficult to drive precise criteria applicable in a general manner to ail cases of generation’s integration. However, practical guidelines to limit the occurrence of self-excitation have been derived and, as per these guidelines, recommended protection System and relay settings are presented for interconnection of NUIGs to the distribution networks.

Page generated in 0.0881 seconds