1

Anteprojeto de pequena central hidrelétrica para o Rio Toropi

Dal Molin, Anderson January 2007 (has links)
Este estudo intitulado “Estudo do Potencial Hidrenergético do Rio Toropi” desenvolvido no Programa de Pós Graduação em Engenharia Mecânica (PROMEC) da Universidade Federal do Rio Grande do Sul (UFRGS) na área de Energia em parceria com a Universidade Federal de Santa Maria (UFSM) pelo curso de Engenharia Mecânica, teve como objetivo desenvolver o estudo hidrenergético do rio Toropi no trecho compreendido entre a Latitude Sul 29,333º e Longitude Oeste 54,003º e a Latitude Sul 29,479º e Longitude Oeste 54,167º. Buscando alcançar este objetivo esta pesquisa estrutura-se em três momentos: a) Levantamento dos possíveis locais com potencial para geração de energia. b) Escolha do ponto que apresentar as melhores características. c) Realização dos cálculos e desenhos preliminares para a implantação de uma Pequena Central Hidrelétrica. Assim sendo, a primeira parte desta pesquisa se constitui respaldada no estudo das cartas topográficas do Rio. Estas direcionaram a escolha dos pontos para análise, compreendidos no trecho que esta pesquisa elegeu para investigar. De posse das cartas, das fotos aéreas dos pontos selecionados do Rio e das imagens de satélite, optou-se pelo ponto de Latitude Sul 29º 22’ 54” e Longitude Oeste 54º 00’ 48”. Este foi eleito após a análise dos demais pontos selecionados embasada nos parâmetros que a Eletrobrás coloca como fatores a serem considerados fundamentais para a implantação de uma PCH, dentre os quais está o desnível do trecho. Após a conclusão desta etapa, este estudo direciona-se aos cálculos que visam dimensionar as características dos elementos que deverão constituir a PCH para este ponto deste Rio, os quais forneceram que neste ponto pode ser gerado 4MW de potência. São os dados fornecidos pelos cálculos que possibilitaram dar forma aos desenhos preliminares da PCH que poderá ser implantada no Rio Toropi. Dessa forma, além deste estudo ofertar uma planta preliminar de uma PCH para o Rio Toropi, ela ressalta que o modelo de casa de máquina aqui apresentado poderá ser utilizado em outros empreendimentos do mesmo porte. / This work, called “Hydro Energy Potential of Rio Toropi Study”, developed in Postgraduation in Mechanical Engineering Program of Federal University of Rio Grande do Sul (UFRGS) at energy area, in association with Federal University of Santa Maria (UFSM), by Mechanical Engineering course, has had as its objective to develop hydro energy study of Rio Toropi, between South Latitude 29,333º and West Longitude 54,003º and between South Latitude 29,479° and West Longitude 54,167º. Searching to reach this goal, this research has been structured around three moments: a) Taking stock possible sites which have potential to energy generation. b) Choosing the point which has the best feature. c) Making calculation and drawings preliminaries to accomplish a Small Central Hydroelectric Power Station. Thus, first part of this research constitutes itself, based on study of Rio Toropi topographic charts. Those have driven to choose points to be analyzed, covered by this study which elected them to be investigated. Having charts, aerial photographs of the selected points of Rio Toropi and satellite images, opts for South Latitude 29º 22’ 54” and West Longitude 54º 00’ 48” point. This point has been elected after analyzing all of the others points selected, based on parameters that Eletrobrás establishes as factors which must be considered as fundamental to accomplish a SCHPS, as no level points of the river. After the conclusion of this step, this study leads to calculations that aim to get dimension the characteristics of the elements which must constitute a SCHPS for the point in the river, which will provide the 4 MW power that can be generated by this point. The data provided by calculation will get possible to shape preliminary drawings of SCHPS that should be accomplished in Rio Toropi. Thus, this study provides a preliminary plant of SCHPS to Rio Toropi, in addiction it highlights the model of power plant here brought in, which could be utilized in another same size enterprising.
2

Anteprojeto de pequena central hidrelétrica para o Rio Toropi

Dal Molin, Anderson January 2007 (has links)
Este estudo intitulado “Estudo do Potencial Hidrenergético do Rio Toropi” desenvolvido no Programa de Pós Graduação em Engenharia Mecânica (PROMEC) da Universidade Federal do Rio Grande do Sul (UFRGS) na área de Energia em parceria com a Universidade Federal de Santa Maria (UFSM) pelo curso de Engenharia Mecânica, teve como objetivo desenvolver o estudo hidrenergético do rio Toropi no trecho compreendido entre a Latitude Sul 29,333º e Longitude Oeste 54,003º e a Latitude Sul 29,479º e Longitude Oeste 54,167º. Buscando alcançar este objetivo esta pesquisa estrutura-se em três momentos: a) Levantamento dos possíveis locais com potencial para geração de energia. b) Escolha do ponto que apresentar as melhores características. c) Realização dos cálculos e desenhos preliminares para a implantação de uma Pequena Central Hidrelétrica. Assim sendo, a primeira parte desta pesquisa se constitui respaldada no estudo das cartas topográficas do Rio. Estas direcionaram a escolha dos pontos para análise, compreendidos no trecho que esta pesquisa elegeu para investigar. De posse das cartas, das fotos aéreas dos pontos selecionados do Rio e das imagens de satélite, optou-se pelo ponto de Latitude Sul 29º 22’ 54” e Longitude Oeste 54º 00’ 48”. Este foi eleito após a análise dos demais pontos selecionados embasada nos parâmetros que a Eletrobrás coloca como fatores a serem considerados fundamentais para a implantação de uma PCH, dentre os quais está o desnível do trecho. Após a conclusão desta etapa, este estudo direciona-se aos cálculos que visam dimensionar as características dos elementos que deverão constituir a PCH para este ponto deste Rio, os quais forneceram que neste ponto pode ser gerado 4MW de potência. São os dados fornecidos pelos cálculos que possibilitaram dar forma aos desenhos preliminares da PCH que poderá ser implantada no Rio Toropi. Dessa forma, além deste estudo ofertar uma planta preliminar de uma PCH para o Rio Toropi, ela ressalta que o modelo de casa de máquina aqui apresentado poderá ser utilizado em outros empreendimentos do mesmo porte. / This work, called “Hydro Energy Potential of Rio Toropi Study”, developed in Postgraduation in Mechanical Engineering Program of Federal University of Rio Grande do Sul (UFRGS) at energy area, in association with Federal University of Santa Maria (UFSM), by Mechanical Engineering course, has had as its objective to develop hydro energy study of Rio Toropi, between South Latitude 29,333º and West Longitude 54,003º and between South Latitude 29,479° and West Longitude 54,167º. Searching to reach this goal, this research has been structured around three moments: a) Taking stock possible sites which have potential to energy generation. b) Choosing the point which has the best feature. c) Making calculation and drawings preliminaries to accomplish a Small Central Hydroelectric Power Station. Thus, first part of this research constitutes itself, based on study of Rio Toropi topographic charts. Those have driven to choose points to be analyzed, covered by this study which elected them to be investigated. Having charts, aerial photographs of the selected points of Rio Toropi and satellite images, opts for South Latitude 29º 22’ 54” and West Longitude 54º 00’ 48” point. This point has been elected after analyzing all of the others points selected, based on parameters that Eletrobrás establishes as factors which must be considered as fundamental to accomplish a SCHPS, as no level points of the river. After the conclusion of this step, this study leads to calculations that aim to get dimension the characteristics of the elements which must constitute a SCHPS for the point in the river, which will provide the 4 MW power that can be generated by this point. The data provided by calculation will get possible to shape preliminary drawings of SCHPS that should be accomplished in Rio Toropi. Thus, this study provides a preliminary plant of SCHPS to Rio Toropi, in addiction it highlights the model of power plant here brought in, which could be utilized in another same size enterprising.
3

Anteprojeto de pequena central hidrelétrica para o Rio Toropi

Dal Molin, Anderson January 2007 (has links)
Este estudo intitulado “Estudo do Potencial Hidrenergético do Rio Toropi” desenvolvido no Programa de Pós Graduação em Engenharia Mecânica (PROMEC) da Universidade Federal do Rio Grande do Sul (UFRGS) na área de Energia em parceria com a Universidade Federal de Santa Maria (UFSM) pelo curso de Engenharia Mecânica, teve como objetivo desenvolver o estudo hidrenergético do rio Toropi no trecho compreendido entre a Latitude Sul 29,333º e Longitude Oeste 54,003º e a Latitude Sul 29,479º e Longitude Oeste 54,167º. Buscando alcançar este objetivo esta pesquisa estrutura-se em três momentos: a) Levantamento dos possíveis locais com potencial para geração de energia. b) Escolha do ponto que apresentar as melhores características. c) Realização dos cálculos e desenhos preliminares para a implantação de uma Pequena Central Hidrelétrica. Assim sendo, a primeira parte desta pesquisa se constitui respaldada no estudo das cartas topográficas do Rio. Estas direcionaram a escolha dos pontos para análise, compreendidos no trecho que esta pesquisa elegeu para investigar. De posse das cartas, das fotos aéreas dos pontos selecionados do Rio e das imagens de satélite, optou-se pelo ponto de Latitude Sul 29º 22’ 54” e Longitude Oeste 54º 00’ 48”. Este foi eleito após a análise dos demais pontos selecionados embasada nos parâmetros que a Eletrobrás coloca como fatores a serem considerados fundamentais para a implantação de uma PCH, dentre os quais está o desnível do trecho. Após a conclusão desta etapa, este estudo direciona-se aos cálculos que visam dimensionar as características dos elementos que deverão constituir a PCH para este ponto deste Rio, os quais forneceram que neste ponto pode ser gerado 4MW de potência. São os dados fornecidos pelos cálculos que possibilitaram dar forma aos desenhos preliminares da PCH que poderá ser implantada no Rio Toropi. Dessa forma, além deste estudo ofertar uma planta preliminar de uma PCH para o Rio Toropi, ela ressalta que o modelo de casa de máquina aqui apresentado poderá ser utilizado em outros empreendimentos do mesmo porte. / This work, called “Hydro Energy Potential of Rio Toropi Study”, developed in Postgraduation in Mechanical Engineering Program of Federal University of Rio Grande do Sul (UFRGS) at energy area, in association with Federal University of Santa Maria (UFSM), by Mechanical Engineering course, has had as its objective to develop hydro energy study of Rio Toropi, between South Latitude 29,333º and West Longitude 54,003º and between South Latitude 29,479° and West Longitude 54,167º. Searching to reach this goal, this research has been structured around three moments: a) Taking stock possible sites which have potential to energy generation. b) Choosing the point which has the best feature. c) Making calculation and drawings preliminaries to accomplish a Small Central Hydroelectric Power Station. Thus, first part of this research constitutes itself, based on study of Rio Toropi topographic charts. Those have driven to choose points to be analyzed, covered by this study which elected them to be investigated. Having charts, aerial photographs of the selected points of Rio Toropi and satellite images, opts for South Latitude 29º 22’ 54” and West Longitude 54º 00’ 48” point. This point has been elected after analyzing all of the others points selected, based on parameters that Eletrobrás establishes as factors which must be considered as fundamental to accomplish a SCHPS, as no level points of the river. After the conclusion of this step, this study leads to calculations that aim to get dimension the characteristics of the elements which must constitute a SCHPS for the point in the river, which will provide the 4 MW power that can be generated by this point. The data provided by calculation will get possible to shape preliminary drawings of SCHPS that should be accomplished in Rio Toropi. Thus, this study provides a preliminary plant of SCHPS to Rio Toropi, in addiction it highlights the model of power plant here brought in, which could be utilized in another same size enterprising.

Page generated in 0.0401 seconds