Spelling suggestions: "subject:"reinforced concrete bridge dock"" "subject:"reinforced concrete bridge dec""
1 |
GPR data processing for reinforced concrete bridge decksWei, Xiangmin 12 January 2015 (has links)
In this thesis, several aspects of GPR data processing for RC bridge decks are studied. First, autofocusing techniques are proposed to replace the previous expensive and unreliable human visual inspections during the iterative migration process for the estimation of the velocity/dielectric permittivity distribution from GPR data. Second, F-K filtering with dip relaxation is proposed for interference removal that is important for both imaging and the performance of post-processing techniques including autofocusing techniques and CS-based migration studied in this thesis. The targeted interferes here are direct waves and cross rebar reflections. The introduced dip relaxation is for accommodating surface roughness and medium inhomogeneity. Third, the newly developed CS-based migration is modified and evaluated on GPR data from RC bridge decks. A more accurate model by accounting for impulse waveform distortion that leads to less modeling errors is proposed. The impact of the selection of the regularization parameter on the comparative amplitude reservation and the imaging performance is also investigated, and an approach to preserve the comparative amplitude information while still maintaining a clear image is proposed. Moreover, the potential of initially sampling the time-spatial data with uniform sampling rates lower than that required by traditional migration methods is evaluated.
|
2 |
Přemostění řeky Svitavy a tratě ČD v Blansku / Bridge crossing over Svitava river and railway track in BlanskoSmělíková, Petra January 2015 (has links)
The aim of the Diploma Thesis is elaboration of study of bridge crossing over the Svitava river and ČD railway track in Blansko. It concerns a five-pole steel beam road bridge with through-span which carries road of the third category. The static system of the construction is solved as solid-web beam of 1.3 meters height which is in three middle spans reinforced by truss construction with top chord and system of diagonals without verticals. The height of the main beam where reinforced by trusswork is 4.75 meters. The width of spans in the road axis is 18.5 + 30.525 + 44.4 + 30.525 + 18,5 metres. The bridge deck consists of steel cross beams bonded with reinforced concrete slab of 200 millimeters of thickness. The drive-through width of the roadway is 7.0 meters. The bridge is fitted with right-sided walkway placed on steel cantilevers. The walk-through width of the walkway is 3.0 meters. Material used is S355 Steel, C30/37 Concrete and S460 Steel which is used for marginal spans of the bridge. Load-bearing construction is assessed in compliance with current technical requirements laid down by European Directives, so called “Eurocodes”. The calculation of inner powers is performed using the Scia Engineer 2013.1 software.
|
Page generated in 0.0986 seconds