Caracterização de geradores hidrelétricos por ensaio de rejeição de carga. / Characterization of hydro generators through load rejection test.

De Franco, César Bernardini 24 October 2014 (has links)
Atualmente, os procedimentos normalizados para determinar os parâmetros transitórios e subtransitórios dos geradores hidrelétricos impõem dificuldades de execução. Assim, em muitos casos, esses ensaios não são realizados e, consequentemente, os respectivos geradores hidrelétricos ficam carentes de uma comprovação em campo de suas características transitórias e subtransitórias. Para preencher essa lacuna, o presente trabalho apresenta uma metodologia para execução do ensaio por rejeição de carga como forma de viabilizar a caracterização de grandes e médios geradores hidrelétricos dentro de determinadas condições e faixa de aplicação. / Currently, the standards procedures to determine the hydro generators transient and subtransient parameters impose several execution difficulties. Therefore, in several cases those tests cannot be conducted and consequently the respective hydro generators miss a field measurement of its transient and subtransient characteristics. In order to fill this gap, the present work presents a method to execute the load rejection test for determination of medium and large hydro generator parameters.
2

Caracterização de geradores hidrelétricos por ensaio de rejeição de carga. / Characterization of hydro generators through load rejection test.

César Bernardini De Franco 24 October 2014 (has links)
Atualmente, os procedimentos normalizados para determinar os parâmetros transitórios e subtransitórios dos geradores hidrelétricos impõem dificuldades de execução. Assim, em muitos casos, esses ensaios não são realizados e, consequentemente, os respectivos geradores hidrelétricos ficam carentes de uma comprovação em campo de suas características transitórias e subtransitórias. Para preencher essa lacuna, o presente trabalho apresenta uma metodologia para execução do ensaio por rejeição de carga como forma de viabilizar a caracterização de grandes e médios geradores hidrelétricos dentro de determinadas condições e faixa de aplicação. / Currently, the standards procedures to determine the hydro generators transient and subtransient parameters impose several execution difficulties. Therefore, in several cases those tests cannot be conducted and consequently the respective hydro generators miss a field measurement of its transient and subtransient characteristics. In order to fill this gap, the present work presents a method to execute the load rejection test for determination of medium and large hydro generator parameters.
3

Análise de requisitos técnicos para ilhamento intencional de geradores síncronos distribuídos / Analysis of technical requirements for intentional islanding of distributed synchronous generators

Lima, Rogério Lúcio 09 August 2013 (has links)
Havendo qualquer distúrbio em um determinado sistema de distribuição de energia elétrica na presença de geradores distribuídos (GDs), é procedimento habitual exigido pelas concessionárias a desconexão destes na intenção de evitar a formação de um sistema ilhado eletricamente sustentado. Este procedimento tem como objetivo evitar maiores danos tanto ao sistema elétrico como um todo, principalmente ao próprio gerador distribuído, bem como às pessoas envolvidas na manutenção desse sistema. Entretanto, esse fato diminui consideravelmente as contribuições do conceito de geração distribuída à melhoria da qualidade dos serviços de fornecimento de energia elétrica por parte das concessionárias. Neste contexto, este trabalho possui como objetivo analisar os requisitos técnicos necessários para viabilizar a operação ilhada dos geradores distribuídos. Sabendo que a maioria das cargas presentes em um sistema de distribuição é dependente dos níveis de tensão e frequência da energia de suprimento, a análise e o monitoramento dessas grandezas antes e durante o ilhamento deverão ocorrer de forma que não se perca a estabilidade da rede ilhada. Para isto, devem ser avaliadas alterações nos métodos de operação e controle dos geradores distribuídos, de maneira a atender os requisitos técnicos necessários para manter a tensão e a frequência dentro dos parâmetros de qualidade de energia elétrica. Foram propostos quatro índices de desempenho para avaliar a qualidade da energia elétrica no sistema ilhado. Os resultados obtidos demonstram a necessidade de efetuar ações corretivas eficientes para manter o sistema elétrico ilhado operando dentro dos padrões aceitáveis de qualidade de energia elétrica. Foram investigadas soluções potenciais e viáveis para garantir a operação da ilha estável e com qualidade da energia elétrica. Além disso, observou-se que cargas dependentes da tensão podem influenciar significativamente a capacidade do GD em formar de ilhas estáveis. / If disturbances occur in a power distribution systems in the presence of distributed generators (DGs), a common practice required by utilities is to disconnect such generators, aiming at avoiding a self-sustained energized island. This procedure is required on order to prevent damage to the whole distribution system, mainly the DG, and to the utility maintenance personnel, as well. However, this requirement may decrease the possible contributions of the distributed generation concepts to the quality of the power supply. In this context, this work aims at analyzing the technical requirements related to make DGs islanded operation feasible. Since most of the loads are dependent on the supply voltage and frequency, the analysis and monitoring of such quantities before and after an islanding event should occur in such a way that the stability of the energized island is granted. To reach such a goal, changes in the DG control modes must be assessed, so that the technical requirements necessary to keep voltage and frequency within statutory limits are fulfilled. Four performance indices have been proposed to assess the power quality in the islanded system. The results have shown the need to perform efficient corrective actions to ensure reliable islanded operation. Moreover, it was observed that voltage-dependent loads may influence the DG capability to sustain stable islands.
4

Análise de requisitos técnicos para ilhamento intencional de geradores síncronos distribuídos / Analysis of technical requirements for intentional islanding of distributed synchronous generators

Rogério Lúcio Lima 09 August 2013 (has links)
Havendo qualquer distúrbio em um determinado sistema de distribuição de energia elétrica na presença de geradores distribuídos (GDs), é procedimento habitual exigido pelas concessionárias a desconexão destes na intenção de evitar a formação de um sistema ilhado eletricamente sustentado. Este procedimento tem como objetivo evitar maiores danos tanto ao sistema elétrico como um todo, principalmente ao próprio gerador distribuído, bem como às pessoas envolvidas na manutenção desse sistema. Entretanto, esse fato diminui consideravelmente as contribuições do conceito de geração distribuída à melhoria da qualidade dos serviços de fornecimento de energia elétrica por parte das concessionárias. Neste contexto, este trabalho possui como objetivo analisar os requisitos técnicos necessários para viabilizar a operação ilhada dos geradores distribuídos. Sabendo que a maioria das cargas presentes em um sistema de distribuição é dependente dos níveis de tensão e frequência da energia de suprimento, a análise e o monitoramento dessas grandezas antes e durante o ilhamento deverão ocorrer de forma que não se perca a estabilidade da rede ilhada. Para isto, devem ser avaliadas alterações nos métodos de operação e controle dos geradores distribuídos, de maneira a atender os requisitos técnicos necessários para manter a tensão e a frequência dentro dos parâmetros de qualidade de energia elétrica. Foram propostos quatro índices de desempenho para avaliar a qualidade da energia elétrica no sistema ilhado. Os resultados obtidos demonstram a necessidade de efetuar ações corretivas eficientes para manter o sistema elétrico ilhado operando dentro dos padrões aceitáveis de qualidade de energia elétrica. Foram investigadas soluções potenciais e viáveis para garantir a operação da ilha estável e com qualidade da energia elétrica. Além disso, observou-se que cargas dependentes da tensão podem influenciar significativamente a capacidade do GD em formar de ilhas estáveis. / If disturbances occur in a power distribution systems in the presence of distributed generators (DGs), a common practice required by utilities is to disconnect such generators, aiming at avoiding a self-sustained energized island. This procedure is required on order to prevent damage to the whole distribution system, mainly the DG, and to the utility maintenance personnel, as well. However, this requirement may decrease the possible contributions of the distributed generation concepts to the quality of the power supply. In this context, this work aims at analyzing the technical requirements related to make DGs islanded operation feasible. Since most of the loads are dependent on the supply voltage and frequency, the analysis and monitoring of such quantities before and after an islanding event should occur in such a way that the stability of the energized island is granted. To reach such a goal, changes in the DG control modes must be assessed, so that the technical requirements necessary to keep voltage and frequency within statutory limits are fulfilled. Four performance indices have been proposed to assess the power quality in the islanded system. The results have shown the need to perform efficient corrective actions to ensure reliable islanded operation. Moreover, it was observed that voltage-dependent loads may influence the DG capability to sustain stable islands.