• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 29
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 34
  • 34
  • 27
  • 25
  • 25
  • 16
  • 14
  • 14
  • 13
  • 13
  • 12
  • 11
  • 11
  • 9
  • 9
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Spojitá betonová mostní konstrukce / Continuous concrete bridge structure

Zemánek, Tomáš January 2018 (has links)
The diploma thesis is focused on solving road bridge situated between Roudno and Razová village over the water basin Slezská Harta. Before the design itself 3 studies were created and compared together. The selected variant is a continuous box girder with inclined walls, post-tensioned by bonded cables. The girder of a total lenght 148,0 m and width 13,6 m is divided into three spans. Height of the girder is 3,3 m. A detailed structural design, including construction limit state assessment, prestress design and time dependent analysis verification is processed. The design and the assessments of temporary and permanent situations are made according to valid standarts and regulations. Drawings and vizualizations are parts of the diploma thesis.
32

Most na silnici I/44 / Bridge on the I/44 road

Majer, David January 2018 (has links)
The subject of this thesis is the design and analysis of five-span bridge construction across the railway on the route Zábřeh - Šumperk and the Morava river. There will be made separated bridge for each direction, only right bridge is considered in the thesis. Object is located to 1st class road I/44 on the route between Mohelnice and Jeseník. Three variants were designed - two prestressed chamber girders, one prestressed chamber girder with prefabricated consoles and construction of concrete slab mixed with two steel girders. After these variants were weigh up and the first one, with the length of cantilevered construction 235,6 m and maximum lenght of span 60 m, was chosen for analysis. Calculation of load effects was made by software Scia Engineering 2013 and the analysis was made according to current standards by manual calculation depending on limit states and their influence on the design as well. Drawing documentation and visualization are also part of the thesis.
33

Návrh spojité mostní konstrukce / Design of the continues bridge structure

Škarda, Jan January 2019 (has links)
The subject of this master thesis is the design and analysis of bridge construction on the crossing of relocated road III/11812 over the future extension of the motorway D4. The geometrical road design of the sugested relocation is predetermined. 4 variant solutions are designed, one of which is selected for subsequent detailed solution. The selected variant is designed as a slab-girder continuous 3-span beam bridge with span lenghts 20.00, 34.50, 20.00m. The load-carrying structure is connected to pillars by notched joint and to abutment by pot bearing. Calculation of load effects was made with software Scia Engineer 18.0 and the analysis was done in cmpliance with current service and ultimate limit states standards.
34

Přemostění řeky Svitavy a tratě ČD v Blansku / Bridge crossing over Svitava river and railway track in Blansko

Smělíková, Petra January 2015 (has links)
The aim of the Diploma Thesis is elaboration of study of bridge crossing over the Svitava river and ČD railway track in Blansko. It concerns a five-pole steel beam road bridge with through-span which carries road of the third category. The static system of the construction is solved as solid-web beam of 1.3 meters height which is in three middle spans reinforced by truss construction with top chord and system of diagonals without verticals. The height of the main beam where reinforced by trusswork is 4.75 meters. The width of spans in the road axis is 18.5 + 30.525 + 44.4 + 30.525 + 18,5 metres. The bridge deck consists of steel cross beams bonded with reinforced concrete slab of 200 millimeters of thickness. The drive-through width of the roadway is 7.0 meters. The bridge is fitted with right-sided walkway placed on steel cantilevers. The walk-through width of the walkway is 3.0 meters. Material used is S355 Steel, C30/37 Concrete and S460 Steel which is used for marginal spans of the bridge. Load-bearing construction is assessed in compliance with current technical requirements laid down by European Directives, so called “Eurocodes”. The calculation of inner powers is performed using the Scia Engineer 2013.1 software.

Page generated in 0.0393 seconds