• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 7
  • Tagged with
  • 8
  • 8
  • 8
  • 6
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Replication of freeway work zone capacity values in a microscopic simulation model

Chatterjee, Indrajit. Edara, Praveen K. January 2008 (has links)
Title from PDF of title page (University of Missouri--Columbia, viewed on Feb. 12, 2010). The entire thesis text is included in the research.pdf file; the official abstract appears in the short.pdf file; a non-technical public abstract appears in the public.pdf file. Thesis advisor: Dr. Praveen K. Edara. Includes bibliographical references.
2

Knowledge discovery and data mining from freeway section traffic data

Amado, Vanessa, January 2008 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 2008. / The entire dissertation/thesis text is included in the research.pdf file; the official abstract appears in the short.pdf file (which also appears in the research.pdf); a non-technical general description, or public abstract, appears in the public.pdf file. Title from title screen of research.pdf file (viewed on June 8, 2009) Vita. Includes bibliographical references.
3

Improving traffic flow conditions for interstate work-zones evaluation of three traffic control devices /

Shaik, Nawaz M. January 2005 (has links)
Thesis (M.S.)--University of Missouri-Columbia, 2005. / The entire dissertation/thesis text is included in the research.pdf file; the official abstract appears in the short.pdf file (which also appears in the research.pdf); a non-technical general description, or public abstract, appears in the public.pdf file. Title from title screen of research.pdf file viewed on (July 11, 2006) Includes bibliographical references.
4

Mobility And Safety Evaluation Of Integrated Dynamic Merge And Speed Control Strategies In Work Zones

Zaidi, Syed Muhammad 01 January 2010 (has links)
In recent years, there has been a considerable increase in the amount of construction work on the U.S. national highways. Most of the work undertaken is the reconstruction and rehabilitation of the existing transportation networks. Work zones in the United States are likely to increase in number, duration and length due to emphasis on repair and highway reconstruction as a significant portion of all federal-aid highway funds are now geared toward highway rehabilitation. The challenge of mobility is particularly acute in work zone areas as road repair and construction intensifies traffic issues and concentrates them in specific locations and at specific times. Due to the capacity drop, which is the result of lane closure in work zone area, congestion will occur with a high traffic demand. The congestion increases number and severity of traffic conflicts which raise the potential for accidents; furthermore traffic operational properties of roadway in work zone area become worse. Intelligent Transportation System (ITS) technologies have been developed and are being deployed to improve the safety and mobility of traffic in and around work zones. In several states in the US, the use of Dynamic Merge Controls also known as Dynamic Lane Merge (DLM) system has been initiated to enhance traffic safety and to improve traffic flow in work zone areas. The DLM usually takes two forms; dynamic iii early merge and dynamic late merge. The use of variable speed limit (VSL) systems at work zones is also one of those measures. VSL systems improve safety by helping the driver in determining the maximum speed that drivers should travel. Besides adding improvement to safety, they are also expected to improve mobility at the work zones. The main goal of this study is to evaluate the safety and operational effectiveness of the dynamic merge systems i.e. the dynamic early lane merge and dynamic late lane merge, in the presence of VSL system. More specifically, the VISSIM model is utilized to simulate a twoto-one lane configuration when one out of the two lanes in the work zone is closed for traffic. Six different scenarios were adopted to assess the effectiveness of these scenarios under different traffic demand volumes and different drivers‟ compliance rates to the messages displayed by the systems. These scenarios are;  Work Zone without VSL and without SDLMS or the current Motorist Awareness System (MAS)  Work Zone with VSL and without SDLMS  Work Zone with VSL and Early SDLMS  Work Zone with VSL and Late SDLMS  Work Zone with early SDLMS and without VSL  Work Zone with late SDLMS and without VSL iv An already calibrated and validated VISSIM model for Simplified Dynamic Lane Merge System (SDLMS) in accordance with the real life work zone was modified with a VSL through Vehicle Actuated Programming (VAP) code. Three different logics were coded each for VSL alone, early SDLMS+VSL and late SDLMS+VSL. All these logics were fine tuned with several test runs before finalizing it for the final simulation. It is found through the simulation of above mentioned scenarios that for low and medium volume levels (V0500, V1000 and V1500), there is no significant difference between the Maintenance of Traffic (MOT) plans for mean throughputs. However, for higher volume levels (V2000 and V2500), late SDLMS with and without VSL produced higher mean throughputs for all compliance rates and truck percentages except when the demand volume was 2,500 vph and compliance of 60%, where it produces the significantly lower mean throughputs. In terms of travel time through the work zone, results indicated that there is no significant difference between MOT types for demand levels of V0500 and V1000 when compliance is 40% or less but for compliance of 60% and more, only demand volume level that is not significantly different from other MOT types is V0500. This study revealed that VSL increases travel time through the work zone. This might be due to non-compliant vehicles that follow the compliant vehicle v ahead unless they find a sufficient gap in adjacent lane to pass the compliant vehicle. It is also found out that VSL makes the system safer at higher volumes (2,000 vph and 2,500 vph). This was observed through safety surrogate measures selected for this study. Another outcome of this study is that the addition of VSL to the dynamic merge systems helps in improving the overall safety of the system by lowering speed variances and deceleration means of the vehicles travelling through the work zone. The passage of traffic through the work zone is made safer when a speed control is integrated to a dynamic merge system. It can be inferred from the simulation results that integrated SDLMS and VSL systems have better performance in terms of traffic mobility and safety than existing individual controls and also show that the integrated SDLMS and VSL system has more potential than each individual systems.
5

Development of alternative methods for delineating diverges in freeway work zones

Greenwood, Aaron Todd 06 April 2012 (has links)
Work zones are visually and physically complex environments, requiring that drivers maintain control of their vehicle and comprehend atypical and often discontinuous traffic control devices to safely navigate appropriate paths. Freeway diverges represent particularly difficult work zones areas. This thesis investigates current methods of delineating diverges in freeway work zones to determine important characteristics of these methods for future research. A virtual environment was constructed with two ramp geometries: a freeway continuing straight and one curving left. Still images of work zones on these geometries were created using drums spaced 10 ft apart, drums spaced 40 ft apart, drums spaced 40 ± 2 ft apart, and portable concrete barriers. These alternatives were used to construct temporary ramps that were either open or closed. 39 participants were asked to identify whether the ramp was open or closed and their responses were recorded to evaluate the performance of each alternative. Results indicate the importance of the Gestalt principles of closure, proximity, and continuity in perception of temporary exit ramps in work zones. These results will be used to guide future research into methods of delineating diverges in freeway work zones.
6

Evaluation of traffic simulation models for work zones in the New England area

Khanta, Pothu Raju, January 2008 (has links)
Thesis (M.S.C.E.)--University of Massachusetts Amherst, 2008. / Includes bibliographical references (p. 71-72).
7

Optimal Detour Planning Around Blocked Construction Zones

Jardaneh, Mutasem 01 January 2011 (has links)
Construction zones are traffic way areas where construction, maintenance or utility work is identified by warning signs, signals and indicators, including those on transport devices that mark the beginning and end of construction zones. Construction zones are among the most dangerous work areas, with workers facing workplace safety challenges that often lead to catastrophic injuries or fatalities. In addition, daily commuters are also impacted by construction zone detours that affect their safety and daily commute time. These problems represent major challenges to construction planners as they are required to plan vehicle routes around construction zones in such a way that maximizes the safety of construction workers and reduces the impact on daily commuters. This research aims at developing a framework for optimizing the planning of construction detours. The main objectives of the research are to first identify all the decision variables that affect the planning of construction detours and secondly, implement a model based on shortest path formulation to identify the optimal alternatives for construction detours. The ultimate goal of this research is to offer construction planners with the essential guidelines to improve construction safety and reduce construction zone hazards as well as a robust tool for selecting and optimizing construction zone detours.
8

An evaluation of signal timings in work zones

Sackey, Ernest Edmund 01 January 2004 (has links)
No description available.

Page generated in 0.0485 seconds