• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 38
  • 17
  • 6
  • 5
  • 3
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 80
  • 80
  • 64
  • 51
  • 31
  • 26
  • 24
  • 24
  • 24
  • 23
  • 23
  • 22
  • 22
  • 22
  • 21
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
71

Stavebně technologický projekt hotelu v Ostrožské Nové vsi / Construction technology preparation of hotel in Ostrožská Nová ves

Khamzina, Mariia January 2022 (has links)
The subject of this diploma thesis is civil technical project of a new building of the hotel Aztec in Ostrožská Nová Ves. The building was designed as a 6-storey building and will be used for accommodation and recreation. Thesis contains engineering report, a detailed time schedule for the main building object, project of construction site, technological notes and inspection and test plans for particular steps of construction, proposal of suitable machines and mechanisms required for construction and wider relationships of transport routes to construction site. It also includes protection of health and safety at work taking into account environmental protection.
72

Stavebně technologického řešení Vzdělávacího komplexu v Brně / Technological solution for the education complex in Brno

Blažek, David January 2012 (has links)
This master’s thesis deals with construction of the gross building of new building of learning complex FEKT VUT in Brno. It contains the design of earthworks, underground setting piles, monolithic structures and isolation of the building for further construction. Construction and technological project includes technical report, time and financial plan of construction, study of the implementation of major technological stages of site preparation, budget of facilities, technological regulation to solved stages, inspection and test plan of monolithic structures, health and safety plan and energy label of objects.
73

Administrativní budova Lomnického - stavebně technologická příprava stavby / Administrative building Lomnického - Building technology preparation of construction

Hanzlík, Vlastimil January 2019 (has links)
This diploma thesis focuses on the construction and technological preparation of the office building in the Lomnického street. The aim of this work is to choose the appropriate construction process. The thesis contains a technical report of a construction and technological project, solutions of wider transport relations, time and financial object plan, itemized budget, design of a site equipment, design of the main building machines and mechanisms, time schedule, technological regulation, inspection and test plan, calculation of two options of the excavation of building pit and details to waterproofing of the substructure. In detail, the thesis is dedicated to secure the building pit enclosed by diaphragm walls.
74

Kabeltechnik Mikulov - stavebně technologická příprava / Kabeltechnik Mikulov - construction and technological preparation

Dvořáková, Michaela January 2013 (has links)
The subject of my diploma thesis is the technology of steel production hall and brick administrative building in the komplex of Kabeltechnik compalny in Mikulov. Thesis deals with design of construction site, construction and technological study of construction of steel manufacturing hall, items budget according to project documentation, financial and time planing, proposal of suitable mechanical assembly including lifting mechanisms, safety of work, environmental plan and monitoring and test planing.
75

Stavebně technologický projekt dvoulodní haly ve Fulneku / Constructive Technological Project of Two-Aisle Hall in Fulnek

Selník, Petr January 2013 (has links)
The subject of this diploma thesis are chosen parts of building technological project of pursuance of the factory building Massag in Fulnek based on the metal bearing structure. This diploma thesis contents study of realization of main technological process of the hall, financial and time plan of building, project of construction site installation, budget of the construction, time planning of works, inspection and test plan, the project of safety and protection of health at work, technological regulation of building metal bearing structure.
76

Stavebně technologický projekt minipivovaru Vysočina / Construction Technology project microbrewery Highlands

Horáková, Petra January 2015 (has links)
The aim of thediploma thesis is to make the detailed building-technological project of microbrewery Vysočina. It is concentrated on the principles of building organization what makes construction facility, the calculation of electric power and water supply, calculation of the costs of operating the construction site and its graphic representation for chosen construction phases. I also make the project of the optimal machine composition. After that I compile the budget and costing of the microbrewery, the time and financial plan and the evaluation of main sources. I technologically solve the phase of upper shell construction made of reinforced pre-cast construction for building object of the microbrewery Vysočina. I apply the other ways of assembly of upper shell construction and show their evaluation in terms of price and time construction. I make the inspection and test plan, environmental aspects, the source register of working risk, heat-engineering review of building case and fire safety solutions.
77

Administrativní centrum Hodonín - stavebně technologický projekt / Administrative center Hodonin - building and technological project

Gaďurek, Robin January 2016 (has links)
The content of the thesis is the implementation of the three-story brick office building with an operation in Hodonin. Text section contains the technical report on the structural and technological project technical report transport relations, study implementation of major technological stages of building SO 01, project construction site, the design of the main building machines and mechanisms, technological regulation, inspection and test plan and a plan of safety and health at work for making the 1st floor ceiling structure. The appendix section includes drawings and installations situation Minor main building structure, calculation of stripping reinforced concrete structures, timing and technology standard of the main building structure and time and financial plan construction-object.
78

Administrativní budova ESKO-T, stavebně technologický projekt / Administrative building ESKO-T, construction technology project

Vochyán, David January 2017 (has links)
The aim of this thesis is compile building and technological project of new office building of the company ESKO-T in Třebíč. This is a two-storey building, build technology cast-in-place longitudinal reinforced concrete frame with mono-pitched roof. Work is consist of a possible solution of steel, concrete and formwork of rental shop to building. Building and technological project, technological regulation for concreting, draft machine configuration, documentation broker transport relations, the crane card and concrete pump, control od worte quality, time schedule and building budget rough upper construction, environmental protection, occupational safety and health, object work schedule and price comparison concreting with hanging silo for concrete and concrete pump.
79

Polyfunkční dům - příprava a organizace výstavby / Multifunctional House - project planning and management of construction

Krč, Jan January 2014 (has links)
This master´s thesis deals with project planning and management of construction of multifunctional building. The main part of thesis are budget of object and schedules of work, which contain realization of reinforced concrete structure and other related works. Another part of thesis deals with the technical regulations about the implementation of horizontal and vertical parts of reinforced concrete structure and from finishing works about realization of inside plasters. Following this part there is design and schedule of using of appropriate building machines and small machinery for their implementation, design of site equipment, quality assurance of works performed, safety of work and minimization of environmental impact. The thesis contains also proposal of contract of work. This work does not deal with substructure of multifunctional building, because this is solved in bachelor thesis.
80

Stavebně technologický projekt výstavby polyfunkčního domu lokalita Nová Nitra / Constructive-technological project of building polyfunktion house locality Nova Nitra

Malý, Filip January 2012 (has links)
The content of this thesis is the construction project of technological multifunctional building new locality Nitra the Slovak Republic. Individual points outline the project, which are dealt with in this thesis can be divided into subcategories, depending on the type of information provided. The first category can include items such as a technical report to the STP, which describes the basic information about the objects constructed building including the construction situation, location of the site including links to transport and technical infrastructure and rough timetable for the construction of all buildings. The second category can include no specific calculation and optimization outputs such as itemized budget polyfunctional house SO-07.03, drawing of the site including all buildings proposed site and their economic evaluation, sizing of utilities for supplying water and electricity construction site, design of building machines and mechanisms including determining the time of deployment, technological regulation for the implementation of monolithic roof structure, including financial balance sheets prepared by the deployment of slab formwork. The last category included in the thesis are legislative requirements that must be observed and kept in the course of the construction plan is constructed as a safety and health at work, including security risks drawn up, inspection and testing schedule for monolithic construction and a list of environmental risks that may arise during implementation.

Page generated in 0.4506 seconds