Spelling suggestions: "subject:"cheduling. productionsection scheduling"" "subject:"cheduling. productionisation scheduling""
1 |
New dominance orders for scheduling problems /Stephenson, Paul A. January 1999 (has links)
Thesis (Ph.D.) -- McMaster University, 1999. / Includes bibliographical references (leaves 92-95). Also available via World Wide Web.
|
2 |
A computer simulation analysis of a flow shop /Walters, Robert H. January 1984 (has links)
Thesis (M.S.)--Ohio State University, 1984. / Includes bibliographical references (leaves 129-135). Available online via OhioLINK's ETD Center
|
3 |
System design of an evaluation aid for jobshop scheduling heuristicsRashidianfar, Rezvan. January 1986 (has links)
Thesis (M.S.)--Ohio University, June, 1986. / Title from PDF t.p.
|
4 |
Models and algorithms for operations scheduling problems with resource flexibility and schedule disruptionsYang, Bibo. January 2004 (has links)
Thesis (Ph. D.)--University of Florida, 2004. / Title from title page of source document. Document formatted into pages; contains 152 pages. Includes vita. Includes bibliographical references.
|
5 |
Reconfigurable resource schedulingSun, Yu, January 1900 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2007. / Vita. Includes bibliographical references.
|
6 |
Scheduling of product families on multiple, identical parallel production lines to minimize setup costsMonkman, Susan Kathleen, January 1900 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2006. / Vita. Includes bibliographical references.
|
7 |
Production scheduling for virtual cellular manufacturing systems /Wong, Yat-sing. January 1999 (has links)
Thesis (Ph. D.)--University of Hong Kong, 1999. / Includes bibliographical references.
|
8 |
A modified shifting bottleneck approach to job shop scheduling with sequence dependent setups (MSBSS) /Sun, Xiaoqing, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 119-128). Also available on the Internet.
|
9 |
A stochastic project scheduling problem with resource constraints /Tai, Chia-Hung C. January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 117-118). Also available on the Internet.
|
10 |
A modified shifting bottleneck approach to job shop scheduling with sequence dependent setups (MSBSS)Sun, Xiaoqing, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 119-128). Also available on the Internet.
|
Page generated in 0.1524 seconds