Spelling suggestions: "subject:"sewage 1treatment 4plants"" "subject:"sewage 1treatment 2plants""
21 |
Kanalizace a ČOV Křelov,Břuchotín-stavebně technologický projekt / Sewerage and WWTP Křelov, Břuchotín-building technology projectNovák, Jan January 2014 (has links)
The subject of my work is to lower construction site waste water treatment plant Křelov - Břuchotín. In more detail, I focused mainly on the implementation of the circular tanks sewage treatment plant. These tanks prescription processing technology formwork and concreting circular tanks. It also contains a technical report, technical report building equipment, a study of the main technological stages of the building, site, design of mechanical assembly, inspection and test plan solved the technological regulation and scheduling.
|
Page generated in 0.0641 seconds