• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Mumerical modeling of undergroud flow and simulations of future pumping scenarios pf morro agudo's mine, Paracatu-MG / Modelamento numÃrico do fluxo subterrÃneo atual e simulaÃÃes de cenÃrios futuros da mina de Morro Agudo, Paracatu-MG.

Vinicius Feijà Cordeiro 17 August 2012 (has links)
Conselho Nacional de Desenvolvimento CientÃfico e TecnolÃgico / The numerical modeling of underground flow of Morro Agudos mine, property of Votorantim Metais Zinco (VMZ), Paracatu-MG, used data from hydrometeorological monitoring campaigns to calibrate the actual scenario and simulate future pumping scenarios of this mine, using Visual MODFLOW 3.1 software. The study area is located in Paracatu-MG and in external portion of BrasÃlia Fold Belt at west margin of SÃo Francisco Craton, the mine is inside metasedimentary sequence of Vazante Group, composed by dolarenite, dolarenitics and dolomitics breccias of Morro do CalcÃrio Formation. In June of 2011 was registered 255mÂ/h of water springs inside underground mine, this value is nearly the maximum capacity, 270mÂ/h, of Wastewater Treatment Plant. So, it was necessary make some simulations to predict the increase of this pumping rate until the year of 2017, following expansion plans, purposing take effective actions in the water treatment. Was used monitoring data given by technical team of VMZ to update the concept hydrogeological model and make a new calibration of numerical model. After calibration, those scenarios were simulated from 2012 until 2017. From those scenarios were obtained an increased pumping rate that will achieve to 530mÂ/h. Of this value was subtracted the pumping rate of "Projeto Ãgua Limpa" (Clean Water Project) and added the inside flow, reaching the final pumping value of 504mÂ/h. This pumping rate will be considered in the planning of the new Wastewater Treatment Plant to supply necessities until 2017. This value can be decreased with rising of "Projeto Ãgua Limpa", but depends of mutual efforts from Hydrogeology, Geology, Environmental and Operations sectors. MineÂs dewatering itÂs not interfering in stream flows around the mine, because all water is pumped to surface and returns to original stream, without being prejudicial or causing environmental impacts. As is a fissural aquifer itÂs impossible to affirm if galleries will cross an expressive fractural zone, increasing in a large way the pumping rate simulated by this work. / O modelamento numÃrico do fluxo subterrÃneo da Mina de Morro Agudo, de propriedade da Votorantim Metais Zinco (VMZ), Paracatu-MG, utilizou os dados do monitoramento hidrometeorolÃgico para calibrar o cenÃrio atual e realizar simulaÃÃes de cenÃrios futuros do bombeamento realizado na mina, utilizando o software Visual MODFLOW 3.1. A Ãrea de estudo localiza-se em Paracatu-MG e encontra-se na parte externa da Faixa de Dobramentos BrasÃlia na margem oeste do CrÃton do SÃo Francisco, a mina està inserida na sequÃncia metassedimentar do Grupo Vazante, composta por dolarenitos, brechas dolarenÃticas e dolomÃticas pertencentes à FormaÃÃo Morro do CalcÃrio. Em Junho de 2011 foi registrado 255mÂ/h em surgÃncias de Ãgua na mina subterrÃnea, valor prÃximo à capacidade mÃxima, 270mÂ/h, da EstaÃÃo de Tratamento de Efluentes. Assim, se fez necessÃrio realizar simulaÃÃes do acrÃscimo desta vazÃo atà o ano 2017, seguindo o plano de expansÃo da mina, com objetivo de subsidiar aÃÃes efetivas no tratamento de Ãgua da unidade. Foram utilizados os dados de monitoramento disponibilizados pela equipe tÃcnica da VMZ para atualizar o modelo hidrogeolÃgico conceitual e realizar nova calibraÃÃo do modelo numÃrico. ApÃs a calibraÃÃo foram realizadas simulaÃÃes a partir do ano 2012 atà 2017. A partir dos cenÃrios simulados foi obtido um acrÃscimo constante nas vazÃes atingindo patamares de 530mÂ/h. Deste valor foi subtraÃda a vazÃo bombeada pelo Projeto Ãgua Limpa e somada a vazÃo aduzida para a mina, chegando ao valor final de bombeamento de 504mÂ/h. Esta à a vazÃo que serà considerada no planejamento da construÃÃo da nova EstaÃÃo de Tratamento de Efluentes para atender as necessidades atà o ano 2017. Essa vazÃo pode ser reduzida com a ampliaÃÃo do Projeto Ãgua Limpa, dependendo de um esforÃo conjunto entre os setores de Hidrogeologia, Meio Ambiente, Geologia e Lavra. O desaguamento da mina nÃo està interferindo na vazÃo dos vertedouros situados no CÃrrego Morro Agudo de maneira definitiva, pois a Ãgua que infiltra na mina subterrÃnea à bombeada para a superfÃcie, tratada e devolvida ao RibeirÃo TraÃras, sem provocar prejuÃzo ou impactos ambientais. Por se tratar de um aquÃfero fissural, nÃo se pode precisar se a lavra irà atingir uma zona aquÃfera fraturada de maior expressÃo, aumentando consideravelmente as vazÃes simuladas.

Page generated in 0.044 seconds