• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Renewables Based Power generation for Kenya Pipeline Company

Washika, Tony January 2011 (has links)
This study presents a Techno-economic assessment of a renewables based power generation project for PS 21, a Pumping Station for Kenya Pipeline Company located in Nairobi, Kenya. The load for the pumping station is 1135 kW Continuous. The assessment criteria used was levelized cost of energy. The hybrid renewable energy system software HOMER was used for assessment, and modeling was done using hourly TMY data for solar irradiance and wind.  According to the results, Hybrid Solar PV-Wind- Battery renewable energy systems can supply adequate power for pumping station purposes. Optimization modeling at 2010 prices gave a levelized cost of energy of $0.2 per kWh for the most optimal solution which consisted of 2 No. 1650 kW Vestas V 82 Wind Turbines and 4070 kW of PV modules. This cost of energy just matches the purchase price from the National grid which varies between $0.14 and $0.2 per kWh, and therefore, the project is economically feasible. Mainly due to concerns of global warming, the view in the Kenyan government and society towards renewable energy is very favorable and  the project is also politically and socially feasible.   Sensitivity analysis demonstrated that wind energy is more viable than solar PV energy in areas of high wind speeds, with about 7.5 m/s annual average wind speeds.   The results show that the levelised cost of energy may be significantly decreased in future due to the fact that the cost of PV modules is progressively reducing. Payments for CERs under CDM mechanism of the Kyoto Protocol would lower the levelised cost of energy further. The Project was found to be feasible. / <p>I was a distance student and did the presentation online via centra.</p>

Page generated in 0.0543 seconds