An analysis of the toll road policy of the South African National Roads Agency LimitedNieuwoudt, Hendrik Gerhardus 04 August 2010 (has links)
The task entrusted to the South African National Roads Agency Limited (SANRAL) is to provide and manage a world class, sustainable national roads network for the country as cost-efficiently as possible, in order to encourage economic growth and develop the quality of life of all South Africans. Underlying this task was the acknowledgement that transport plays a vital role in the economic and social development of any country. To achieve this, the South African Government currently provides government-guarantees of several billion Rands to enable SANRAL to negotiate loans from the capital markets to fund the development and maintenance of the national toll road network. With regard to non-toll national roads, SANRAL receives per annum budgetary amounts to maintenance and development. However, such funding is only sufficient to maintain approximately 40% of the non-toll national road network. The abovementioned information and statistics imply that currently SANRAL may have insufficient funds available to develop and maintain the required primary national road network. SANRAL’s main objective is to obtain the funding required to develop and maintain the proposed primary national road network and to reduce the dependency on government-guaranteed debt. As a result the toll roads policy alternative was elected as a vehicle towards executing SANRAL’s mandate. This article explores the modalities associated with the toll road policy alternative pursued by SANRAL. Copyright / Dissertation (MAdmin)--University of Pretoria, 2010. / School of Public Management and Administration (SPMA) / unrestricted
|
2 |
Evaluation of the effectiveness of public participation in the Gauteng electronic tolling programme24 April 2015 (has links)
M.A. (Public Management and Governance) / The South African road system is managed by the South African National Roads Agency Limited (SANRAL), which is an agency under the Department of Transport. The main aim of SANRAL is to connect major cities, towns and emerging villages. It has undertaken a project of upgrading and expanding of the road network in the Gauteng Province of South Africa, known as the e-tolling system. It allows for the free flow Electronic Tolling (E-Toll) system and records all vehicles passing through the tollgate without requiring them to stop or slow. A built-in device (tag) is fitted into the overhead gantry system to detect the passing vehicle, which reads an e-tag (if fitted), as well as recording the number plate of the vehicle. A fee for using the road will be charged and paid later from a registered e-toll account, linked to the vehicle user or if no e-tag is present a bill is submitted to the owner. The primary issue associated with the project relates to complaints from various interest groups, political parties and civic organisations regarding public participation in the planning and execution of e-tolling. This has resulted in mass marches and court cases, with the project, consequently undergoing delays, suspension and postponements. The study is, thus, motivated by the foregoing factors in endeavouring to assess the effectiveness of the public participation process in the initial stages of the e-tolling project. The research utilised an exploratory case study method; comprehensively appraising the public participation areas within the e-tolling project of Gauteng. The study employed both documentation reviews and interviews as data collection methods. The research design was predominantly qualitative, however data analysis was undertaken and presented in both qualitative and quantitative evaluations...
|
3 |
Analysing the implementation process of open road tolling in GautengNetshidzati, Ashley 28 October 2015 (has links)
M.Phil. (Engineering Management) / The daunting peak-hour traffic periods have affected Gauteng road users and the economy due to traffic congestion in the recent years. A total of 157 000 vehicles used the Gauteng freeway network each day in 2006, which went up to approximately 200 000 in 2011. This means that the average growth in traffic volumes had grown on average by 7% between 2006 and 2011. As a management strategy, The South African National Road Agency (SANRAL) launched the Gauteng Freeway Improvement Project (GFIP) in 2007 to improve the infrastructural network. The introduction of the GFIP road-user charging scheme in Gauteng has been followed by a renewed interest in the subject of urban road tolling both by practitioners and academics ...
|
4 |
Improving value for money on SANRAL's toll operations contractsSuremann, Peter January 2004 (has links)
The South African National Roads Agency Ltd (SANRAL) is the custodian
of the 9 208km national road network in South Africa. SANRAL's
mandate is to develop, maintain and operate this national economic
asset. 26,3°/o of the national road network consists of toll roads. The
operation and maintenance of the toll facilities are let by SANRAL
through a public open tender process. The successful tenderer is then
appointed by SANRAL on a contract basis as the toll road operator.
The operation and management of toll facilities involve various technical
and managerial disciplines, such as electrical, mechanical and civil
engineering, toll collection, and operations management. Historically,
toll operations contracts were fragmented into separate sub-contracts
for each of the disciplines. This resulted in a substantial amount of
project management input from SANRAL. In addition to SANRAL's high
level of management input, it also carried the risk of fraud. SANRAL
had no incentives for a toll operator to increase the toll revenues,
neither did it impose any penalties for poor performance.
In order to simplify the project structure, as well as to improve on the
old toll contract format, SANRAL developed a new toll operations
contract model, aptly named Comprehensive Toll Road Operations and
Maintenance or CTROM (C-T -ROM). Amongst others, the benefits of the
new contract format are:
• That it simplifies SANRAL's management input by providing a
single point of contact between SANRAL and a principal toll
operator, under whose supervision all the sub-contractors reside.
The toll operator therefore assumes the responsibility and
accountability to manage the sub-contractors.
• The introduction of penalties that are imposed on the toll
operator, should he not perform his contractually specified duties
and obligations.
• The transfer of fraud risk to the toll operator.
• An increase in the toll revenue by offering the toll operator a
revenue-sharing incentive.
The first contracts let under the CTROM format were the N2 North Coast
Toll Road and the N2 South Coast Toll Road in July 2001. As these toll
routes had been in operation for a while before the CTROM contracts
were procured, comparisons could be made on the pre-CTROM and
post-CTROM costs. Initial indications were, although there were some
structural differences between the old and the new format, that these
two CTROM contracts were between 7 and 13°/o more expensive than
their predecessors. An extrapolation of these values to all the current
CTROM contracts results in additional costs to SANRAL of between
R 10m and R 20m per annum, when compared to the previously used
managed contract format.
The more expensive CTROM contracts have brought about significant
benefits, such as the tra'nsfer of fraud risk from SANRAL to the toll
operator, as well as a simpler project structure in the form of a single
point of responsibility. The intention of this research report is to
determine whether the increase in cost has been worthwhile, and
whether there are areas for further improvement. In other words, are
the more expensive CTROM contracts providing SANRAL with an
associated increase in value for its money? Not only is SANRAL
concerned with the prudential expenditure of its toll revenues, but it is
also under legislated obligations to ensure that funds are spent in the
most appropriate and efficient ways.
In order to better understand value for money and related concepts, the
author explores various academic theories in the form of a literature
study. By building a platform from which to conduct further analyses,
the author can then apply the newly found knowledge to test the
hypothesis that SANRAL is not achieving optimal value for money on its
CTROM contracts.
Concepts and theories that are studied in the literature review include:
• The legislative and institutional framework; and
• Key terminology such as risk management, the public sector
comparator, value for money, and performance penalties on
contracts.
Many of the concepts have been explored worldwide, especially in
developed countries such as Australia, Canada, Hong Kong and the
United Kingdom, where those countries' governments actively
encourage private sector investment in public infrastructure.
In the analytical part of the research report, the author explores the
causes of the additional costs on two of SANRAL's toll routes, namely:
• The Mariannhill Toll Route, which is located on the N3 between
Pinetown and Key Ridge in the province of KwaZulu-Natal; and
• The N 17 Toll Route between Springs and Wemmer Pan in the
province of Gauteng.
The analyses suggest that the operations and maintenance (O&M) costs
of the N3 Mariannhill and N 17 toll routes under the CTROM contracts are
46,3°/o and 20,4°/o more expensive than on the previous contracts.
Some of the factors that could play a role in the increased cost of the
CTROM contracts are:
• The contract duration;
• Risk transfer to the toll operator;
• Penalties applied when the toll operator does not conform to the
required specifications; and
• Complex performance specifications.
University of Pretoria
Graduate School of Management
MBA Research Report RPJ820 v
P Suremann
91052719
October 2004
Digitised by the University of Pretoria, Library Services, 2014
The author concludes that there are a number of factors that negatively
influence the cost of the CTROM contracts. The author therefore
recommends that the factors that are within the control of SANRAL be
changed. These improvements should bring about better value for
money on SANRAL's toll operations contracts. / Dissertation (MAdmin)--University of Pretoria, 2004. / gm2014 / School of Public Management and Administration / unrestricted
|