Spelling suggestions: "subject:"stabilility assessment"" "subject:"habitability assessment""
11 |
"Tyršův most" Litoměřice, příprava realizace stavby / "Tyršův bridge" Litomerice, preparation of implementationCupl, Jiří January 2016 (has links)
Master's thesis process construction technology preparation and implementation of project "Tyršův Bridge" in Litomerice. Because condition of bridges is very poor, it was decided to reconstruction them. This is a design for reconstruction of bridges, roads and road-bed on the system of Tyršův Bridge in Litomerice to the extent of the diploma work. During the reconstruction will replace bridges registration no. 15-040 and 15-041 new ones of the same lightness, on the bridge registration no. 15-042 will be replaced roadway and bridge ev.č. 15-043 will be replaced and the structure of the supports. Will be extended road-bed between bridges registration no. 15-040 and 15-041 using gabion construction.
|
Page generated in 0.1167 seconds