• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Statusbedömning av asynkronmotorer

Dicksen, Peter, Brännholm, Arvid January 2015 (has links)
Induction motors, often referred to as the workhorse of the industry, play an important role in production today. Therefore, it's important to diagnose any faulty induction motor prior to failure to avoid costly and time consuming production stops.This thesis compares methods for diagnosing induction motors in operation, MCSA, Park's vector approach and the standard method used by Swedish industries today. By simulating broken rotor bars and short-circuit in one of the windings, each method is tested and the results are compared using matlab.The results need further verification due to uncertainties of the condition of the test motor, even though the experiment gives a hint of the different advantages of each method. A combination of the methods should be able to tell if the motor needs further examination.
2

Statusbedömning och förbättringsförslag för startkedjemaskineri, startkedja och linspel för stränggjutningsmaskin

Lago, Mattias, Sunesson, Pavel January 2008 (has links)
<p>The main goal with the master thesis has been to do a status evaluation of the chain machinery with its start chain and wire to secure the production on a short basis due to that a reconstruction is not planned at this time. An evaluation of the condition of the start chain and the rollers in the chain depository has been done. An offer has been requested for a new start chain and the evaluation of the start chains may be a basis for the decision taking. The production has been able to go on, although it has arisen some problems which have been difficult to find the causes for. There is no gathered “picture” of the machinery status and a mapping of each machinery has been compiled of comprehensive logs. Observations and measurements have also been done to prove and elucidate the biggest problems.</p><p>After the compilation a concentration has been done of the two most frequently problems during the last years, that is to say, 2006 to 2008. The work has finally fallen into suggestions for improvements of routines and suggestions for concepts for construction changes to keep a continuous stable production until a bigger reconstruction will be made.</p><p>The two problems which have been focused on were the “limit-switches” for the wires and the heat-radiation-shields situated under the tilt bridges. The arrangement for the wire problem shown to be quite simple to implement and its cause was due to that the friction was to big in the shackle, which function is to be pressed down by the wire, and thereby didn’t trigger an alarm on the computer screens.</p><p>To prevent this, lubrication was done for respective shackle to sustain the production for a short period of time. Although there have been done some concepts to sustain the production for a longer period of time.</p><p>The problems concerning the heat-radiation-shields under the tilt bridges can be solved mainly by changed maintenance routines, which have been attached in the list which has been formed.</p>
3

Statusbedömning och förbättringsförslag för startkedjemaskineri, startkedja och linspel för stränggjutningsmaskin

Lago, Mattias, Sunesson, Pavel January 2008 (has links)
The main goal with the master thesis has been to do a status evaluation of the chain machinery with its start chain and wire to secure the production on a short basis due to that a reconstruction is not planned at this time. An evaluation of the condition of the start chain and the rollers in the chain depository has been done. An offer has been requested for a new start chain and the evaluation of the start chains may be a basis for the decision taking. The production has been able to go on, although it has arisen some problems which have been difficult to find the causes for. There is no gathered “picture” of the machinery status and a mapping of each machinery has been compiled of comprehensive logs. Observations and measurements have also been done to prove and elucidate the biggest problems. After the compilation a concentration has been done of the two most frequently problems during the last years, that is to say, 2006 to 2008. The work has finally fallen into suggestions for improvements of routines and suggestions for concepts for construction changes to keep a continuous stable production until a bigger reconstruction will be made. The two problems which have been focused on were the “limit-switches” for the wires and the heat-radiation-shields situated under the tilt bridges. The arrangement for the wire problem shown to be quite simple to implement and its cause was due to that the friction was to big in the shackle, which function is to be pressed down by the wire, and thereby didn’t trigger an alarm on the computer screens. To prevent this, lubrication was done for respective shackle to sustain the production for a short period of time. Although there have been done some concepts to sustain the production for a longer period of time. The problems concerning the heat-radiation-shields under the tilt bridges can be solved mainly by changed maintenance routines, which have been attached in the list which has been formed.

Page generated in 0.0539 seconds