Spelling suggestions: "subject:"steelworks"" "subject:"wheelworks""
1 |
Modelling, optimization and control of an electric arc furnaceMacRosty, Richard. Swartz, Christopher L.E. January 2005 (has links)
Thesis (Ph.D.)--McMaster University, 2005. / Supervisor: C.L.E. Swartz Includes bibliographical references (leaves 144-154).
|
2 |
Lodi a novel /Kapcala, Jason D. January 2010 (has links)
Thesis (M.F.A.)--West Virginia University, 2010. / Title from document title page. Document formatted into pages; contains v, 253 p. Includes abstract. Includes bibliographical references (p. 25).
|
3 |
Stelco's Lake Erie WorksLoSchiavo, Michael 04 1900 (has links)
<p> The major emphasis of this paper concerns the location of Stelco 1 s Lake Erie Works at Nanticoke. The paper puts into perspective Stelco's decision to build a new integrated steel works. Stelco had to increase its capacity by an estimated six-million tons to ensure its competitiveness up to the year 2000. Hilton Works could at best only produce a five and a half to six million ton annual capacity and had no room available to expand its operation. </p> <p> Stelco therefore set out on an intense search to find a suitable location to develop a new integrated steel plant. Nanticoke Ontario, on the north shore of Lake Erie, was finally chosen as the site. Overall, the differences between Hamilton and Nanticoke are small and it was chiefly the space available and better labour relations at Nanticoke that influenced Stelco's choice of location. Construction of Lake Erie Works began in 1974 and the first phase was completed in 1980. </p> / Thesis / Candidate in Philosophy
|
4 |
A scheduling model for production in a hot strip millHamman, Gert J. M. 06 December 2011 (has links)
M.Ing. / This research dissertation highlights the important role of scheduling in a production environment. The functioning of an integrated iron and steel works is discussed. The importance of production scheduling in this environment is shown, followed by a literature survey of strip mill production scheduling models. Thereafter a model is introduced that aids in the production scheduling of plate via coil in a hot strip mill. Finally the benefits of the scheduling model are shown.
|
5 |
Producer gas practice in the steel industryHodges, Horace Wilfred. January 1930 (has links) (PDF)
Thesis (Professional Degree)--University of Missouri, School of Mines and Metallurgy, 1930. / The entire thesis text is included in file. Typescript. Illustrated by author. Title from title screen of thesis/dissertation PDF file (viewed December 14, 2009) Includes bibliographical references (p. [52]) and index (p. [53]).
|
6 |
Stormwater impacts on disharge water quality in licensed drains at the Port Kembla SteelworksWhant, Louis Mathew. January 2005 (has links)
Thesis (M.Env.Sc.)--University of Wollongong, 2005. / Typescript. Includes bibliographical references: leaf 81-84.
|
7 |
Development of a control strategy for the open slag bath furnaces at Highveld Steel and Vanadium Corporation Ltd.Steinberg, W. S. January 2009 (has links)
Thesis (M.Eng.(Metallurgical Engineering))--University of Pretoria, 2008. / Abstract in English. Includes bibliographical references.
|
8 |
The evaluation of an HIV/AIDS strategy with specific application to Cape Town Iron and Steel Works (CISCO)Olivier, Johan 03 1900 (has links)
Thesis (MBA)--Stellenbosch University, 2006. / ENGLISH ABSTRACT: In South Africa more people are living with AIDS than in any other country in the
world. It is now evident that HIV/AIDS has developed into a pandemic that not only
affects the health of individuals, but does expand to households, communities and
the nation. The stigma of HIV/AIDS is most likely the single most important reason
why people, organisations and the government tend to shy away from the problem.
The prime aim of business is to make money, but the fact that AIDS affects people at
the peak of their productive years when they would normally not require medical
attention, will impact negatively on the organisation's bottom line results. Apart from
government, business is the only group that has the capacity and resources to
successfully implement strategies in the fight against HIV and AIDS.
This study provides a theoretical introduction to HIV and AIDS but also indicates that
small to medium size organisations are slow to react to the threat that HIV and AIDS
will have to their business and also the country. The study shows that large
organisations have definitely been successful in their fight against the disease.
The study concludes that knowing the prevalence rate of HIV in a organisation and
adapting the strategy accordingly is essential for long term sustainability of the
organisation.
CISCO was selected as the case study to substantiate the above-mentioned opinions
and conclusions. / AFRIKAANSE OPSOMMING: In Suid Afrika woon daar meer mense met VIGS as enige in enige ander land in die
wereld. Dit is tans duidelik dat MIV/VIGS ontwikkel het in 'n pandemie wat nie net die
gesondheid van individue raak nie, maar wat ook uitkring na huishoudings,
gemeenskappe en die nasie. Die stigma van MIV/VIGS is heel waarskynlik die
grootste enkele rede waarom organisasies en die regering wegskram van die
probleem.
Die hoofdoel van 'n besigheid is om wins te maak, maar die feit dat VIGS mense
tydens die toppunt van hulle produktiewe jare affekteer wanneer hulle normaalweg
geen mediese versorging sou benodig nie, gaan 'n negatiewe effek op organisasies
se winsgewendheid hê. Behalwe vir die regering is privaat besighede die enigste
groep wat beskik oor die kapasiteit en hulpbronne om strategiee te implimenteer wat
suksesvol sal wees in die stryd teen MIV en VIGS.
Hierdie studie gee 'n teoretiese inleiding oor MIV en VIGS. Dit dui ook daarop dat
klein tot medium grootte organisasies stadig reageer op die bedreiging wat MIV en
VIGS vir hul besigheid en die land kan inhou. Die studie toon dat groter organisasies
meer sukses behaal in hulle stryd teen die siekte.
Die studie bevind dat dit vir die volhoubaarheid van 'n organisasie belangrik is om te
weet wat die voorkoms syfers van MIV in die organisasie is en die strategie ten
opsigte van MIV en VIGS dienooreenkomstig aan te pas.
CISCO is as 'n gevallestudie gebruik om bogenoemde waarnemings en
aanbevelings te staaf.
|
Page generated in 0.0547 seconds