• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 18
  • 1
  • Tagged with
  • 18
  • 18
  • 18
  • 18
  • 7
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

An under-ground SEN-station

連家欣, Lin, Ka-yun, Grace. January 1995 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
12

The competition between buses and the MTR in Hong Kong

陳達大, Chan, Tat-tai. January 2002 (has links)
published_or_final_version / Transport Policy and Planning / Master / Master of Arts in Transport Policy and Planning
13

Railway and land use interaction in Hong Kong: a geographical perspective

Lam, Chui-shan., 林翠珊. January 2000 (has links)
published_or_final_version / Transport Policy and Planning / Master / Master of Arts
14

Application of operation research techniques for forecasting transportation demand, planning train services and station facilitiesof the MTRC

Tsang, Kwan-ming., 曾坤明. January 1998 (has links)
published_or_final_version / Business Administration / Master / Master of Business Administration
15

Timetable synchronization for mass transit.

January 2004 (has links)
Wong Chi Wing. / Thesis (M.Phil.)--Chinese University of Hong Kong, 2004. / Includes bibliographical references (leaves 105-106). / Abstracts in English and Chinese. / Abstract --- p.i / Acknowledgement --- p.iv / Chapter 1 --- Introduction --- p.1 / Chapter 1.1 --- Motivation --- p.1 / Chapter 1.2 --- Literature Review --- p.3 / Chapter 1.3 --- Thesis Outline --- p.5 / Chapter 2 --- The Timetable Synchronization Problem --- p.7 / Chapter 2.1 --- Underlying Assumptions --- p.7 / Chapter 2.2 --- The Timetable Synchronization Problem (TTSP) --- p.10 / Chapter 2.2.1 --- Time-Horizon Boundary Concerns --- p.10 / Chapter 2.2.2 --- Transfer Waiting-times Declaration --- p.11 / Chapter 2.2.3 --- Set Declarations --- p.13 / Chapter 2.2.4 --- Parameter Declarations --- p.14 / Chapter 2.2.5 --- Variable Declarations --- p.16 / Chapter 2.2.6 --- Model Description --- p.17 / Chapter 2.3 --- Alternative Formulation --- p.22 / Chapter 2.4 --- Summary --- p.24 / Chapter 3 --- Solution Approach --- p.25 / Chapter 3.1 --- Computation Comparison of the Two Formulation --- p.25 / Chapter 3.2 --- CPLEX Parameter Settings --- p.26 / Chapter 3.3 --- Optimization-based Heuristic Method (OHM) --- p.26 / Chapter 3.3.1 --- Why Modify? - Sharper LP-Relaxation --- p.28 / Chapter 3.3.2 --- How to Predict and Release --- p.30 / Chapter 3.4 --- Performance of the OHM --- p.31 / Chapter 3.5 --- Summary --- p.32 / Chapter 4 --- Case Study of the MTR in HK --- p.33 / Chapter 4.1 --- Problem Settings --- p.33 / Chapter 4.1.1 --- Train Routes --- p.33 / Chapter 4.1.2 --- Cross-platform Times --- p.34 / Chapter 4.1.3 --- Testing Horizon --- p.35 / Chapter 4.1.4 --- Number of Trains --- p.35 / Chapter 4.1.5 --- Allowable Adjustments to Operational Parameters --- p.36 / Chapter 4.2 --- Solution Quality --- p.37 / Chapter 4.2.1 --- Average Transfer Waiting-times --- p.37 / Chapter 4.2.2 --- Possible Maximum Transfer Waiting-times --- p.37 / Chapter 4.2.3 --- """Just Miss""" --- p.38 / Chapter 4.3 --- Summary --- p.39 / Chapter 5 --- Solution Quality in Different Settings --- p.40 / Chapter 5.1 --- Optional Operational Constraints I - Improve Regularity --- p.41 / Chapter 5.1.1 --- Regularity of Dwell-times --- p.41 / Chapter 5.1.2 --- Regularity of Headway --- p.43 / Chapter 5.2 --- Cases Analysis I --- p.44 / Chapter 5.2.1 --- Case Analysis 1 - l Steps to Use the System --- p.45 / Chapter 5.2.2 --- Case Analysis 2 - Varying Run-times --- p.47 / Chapter 5.2.3 --- Case Analysis 3 - Non-rush Hour --- p.49 / Chapter 5.2.4 --- Case Analysis 4 - Varying Regularity of Dwell-times . . --- p.52 / Chapter 5.3 --- Cases Analysis II --- p.55 / Chapter 5.3.1 --- Optional Operational Constraints II - Increasing Dwell-times (1) --- p.55 / Chapter 5.3.2 --- Case Analysis 5 - Adding Special Dwell-times Bounds . --- p.56 / Chapter 5.4 --- Case Analysis III --- p.58 / Chapter 5.4.1 --- Optional Operational Constraints III - Increasing Dwell-times (2) --- p.58 / Chapter 5.4.2 --- Case Analysis 6 - Adding Modified Special Dwell-times Bounds --- p.59 / Chapter 5.5 --- Future Work --- p.61 / Chapter 6 --- Timetable-Synchronization System --- p.62 / Chapter 6.1 --- Hierarchy of the Timetable-Synchronization System --- p.64 / Chapter 6.2 --- Use of the Component Software Tools --- p.66 / Chapter 6.2.1 --- ILOG CPLEX 7.5 --- p.66 / Chapter 6.2.2 --- Microsoft Visual Basic. Net 2003 --- p.66 / Chapter 6.2.3 --- Microsoft Office XP - Excel --- p.67 / Chapter 6.2.4 --- Microsoft Office XP - Access --- p.68 / Chapter 6.3 --- Summary --- p.69 / Chapter 7 --- Conclusions --- p.70 / Chapter 7.1 --- Summary and Further Studies --- p.70 / Appendix --- p.72 / Chapter A --- The MTR System in HK --- p.73 / Chapter B --- Abbreviation of Routes --- p.74 / Chapter C --- Abbreviation of Interchange Stations --- p.75 / Chapter D --- Passenger Groups --- p.76 / Chapter E --- Average Transfer Waiting-times (08:00-ج09:00) --- p.78 / Chapter F --- Maximum Transfer Waiting-times (08:00-ج09:00) --- p.79 / Chapter G --- Using the Timetable-Synchronization System --- p.80 / Chapter G.l --- Steps to Use the System --- p.82 / Chapter H --- Timetable-Synchronization System Problem Generator --- p.85 / Chapter H.1 --- "Use of the ""Timetable-Synchronization System Problem Gen- erator""" --- p.85 / Chapter H.2 --- "Hierarchy of the ""Timetable-Synchronization System Problem Generator""" --- p.86 / Chapter H.3 --- "Using the ""Timetable-Synchronization System Problem Gen- erator""" --- p.87 / Chapter I --- Transfer Waiting-time Calculator --- p.94 / Chapter I.1 --- Use of Transfer Waiting-time Calculator --- p.94 / Chapter I.2 --- Using the Transfer Waiting-time Calculator --- p.95 / Chapter J --- Database Structure in Microsoft Access --- p.97 / Chapter J.1 --- Operational Parameters --- p.98 / Chapter J.1.1 --- Use of Operational Parameters --- p.98 / Chapter J.1.2 --- Structure of the Tables --- p.98 / Chapter J.2 --- Current Timetable --- p.102 / Chapter J.2.1 --- Use of Current Timetable --- p.102 / Chapter J.2.2 --- Structure of the Tables --- p.102 / Chapter J.3 --- Patronage --- p.103 / Chapter J.3.1 --- Structure of the Table --- p.104 / Bibliography --- p.106
16

Harmonic simulation of traction system

Lai, Tsz-ming, Terence., 黎子明. January 2000 (has links)
published_or_final_version / Electrical and Electronic Engineering / Master / Master of Philosophy
17

The relationship between railway and spatial development in Hong Kong

Lau, Yuen-yee, Carey., 劉婉兒. January 1999 (has links)
published_or_final_version / Urban Planning / Master / Master of Science in Urban Planning
18

Adaptive social underground linkages urban interface for Mass Transit Railway

Yeung, Sze-hang, Jess., 楊思恆. January 2004 (has links)
published_or_final_version / Architecture / Master / Master of Architecture

Page generated in 0.0663 seconds