Spelling suggestions: "subject:"TS productionsection managemement 155194"" "subject:"TS productionsection managemement 1551194""
1 |
Two-sided Assembly Line Balancing Models And HeuristicsArikan, Ugur 01 September 2009 (has links) (PDF)
This study is focused on two-sided assembly line balancing problems of type-I and type-II. This problem is encountered in production environments where a two-sided assembly line is used to produce physically large products. For type-I problems, there is a specified production target for a fixed time interval and the objective is to reach this production capacity with the minimum assembly line length used. On the other hand, type-II problem focuses on reaching the maximum production level using a fixed assembly line and workforce. Two different mathematical models for each problem type are developed to optimally solve the problems. Since the quality of the solutions by mathematical models decreases for large-sized problems due to time and memory limitations, two heuristic approaches are presented for solving large-sized type-I problem. The validity of all formulations is verified with the small-sized literature problems and the performances of the methods introduced are tested with large-sized literature problems.
|
2 |
Evolutionary Algorithms For Deterministic And Stochastic Unconstrained Function OptimizationKockesen, Kerem Talip 01 November 2004 (has links) (PDF)
Most classical unconstrained optimization methods
require derivative information. Different methods have
been proposed for problems where derivative
information cannot be used. One class of these methods
is heuristics including Evolutionary Algorithms (EAs).
In this study, we propose EAs for unconstrained
optimization under both deterministic and stochastic
environments. We design a crossover operator that
tries to lead the algorithm towards the global optimum
even when the starting solutions are far from the
optimal solution. We also adapt this algorithm to a
stochastic environment where there exist only
estimates for the function values. We design new
parent selection schemes based on statistical grouping
methods and a replacement scheme considering existing
statistical information. We test the performance of
our algorithms using functions from the literature and
newly introduced functions and obtain promising
results.
|
3 |
Outsourced Design Management Implementations: A Study Conducted With Firms And Design Consultancies In TurkeyBogazpinar, Hakan 01 October 2012 (has links) (PDF)
This study aims to investigate the outsourced design management implementations along the alliances that are established between firms and design consultancies in Turkey, which have been analysed in a limited sense in the past. Within this context / information on, &lsquo / why and how design is outsourced&rsquo / and &lsquo / how the design process is managed&rsquo / are derived through semi-structured interviews in conjunction with structured questionnaire conducted with managers from a sample selection of design and manufacturing firms with the aim of comparing the expectations and offerings of the parties that engaged the alliances in Turkey. The findings of the field study indicate that design management implementations in their current form of application exhibit several issues to discuss. Context of outsourced design service, corporate level strategic utilization of the design expertise, evaluation of final outputs, business initiation practices and design process management practices are important factors to consider in management of design alliances.
|
4 |
Machine Scheduling With Preventive MaintenancesBatun, Sakine 01 June 2006 (has links) (PDF)
In manufacturing environments, machines are usually subject to down periods due to various reasons such as preventive maintenance activities, pre-accepted jobs and pre-known material shortages. Among these reasons, preventive maintenance, which is defined as the pre-planned maintenance activities to keep the machine in its operating state, has gained much more importance in recent years.
In this thesis, we consider the single machine total flow time problem where the jobs are non-resumable and the machine is subject to preventive maintenance activities of known starting times and durations. We propose a number of optimality properties together with the upper and lower bounding procedures. Using these mechanisms, we build a branch and bound algorithm to find the optimal solution of the problem. Our extensive computational study on randomly generated test instances shows that our algorithm can solve large-sized problem instances with up to 80 jobs in reasonable times.
We also study a two-alternative maintenance planning problem with minor and major maintenances. We give an optimizing algorithm to find the timing of the maintenances, when the job sequence is fixed.
|
5 |
A Linear Programming Approach To Quality Improvement Project And Product Mix Selection Under Inspection Error And ReworkSarbak, Nedret 01 August 2006 (has links) (PDF)
In this study, the effect of inspection error on the product mix and quality projects
selection in a manufacturing environment where rework and inspection errors exist
is examined. It is assumed that the products (items) for which rework is necessary
are reprocessed at a separate work center and 100% inspection is performed for the
products both after rework and processing operations. Markov chain approach is
used to compute yield and rework rates. In addition, nominal-the-best type of a
quality loss function is used in computing quality loss due to products shipped to
the customers. A linear programming (LP) model is developed to support the
product mix and quality improvement project selection decisions. The use of LP
model is demonstrated on an example problem. The results obtained under different
experimental conditions are compared with solutions of a naive QI project selection
method, improving the least capable process. The analysis shows that developed LP
model is relatively better than process capability approach. Besides, according to
the results obtained under different experimental conditions, the factors that have
significant effect on throughput and QI project selection are being determined.
|
6 |
A New Approach To Generation Of Non-permutation Schedules For Flowshops With Missing OperationsTabalu, Metin 01 January 2007 (has links) (PDF)
In this study, non-permutation flowshops with missing operations are considered. The primary performance criterion is the total cycle time (i.e. makespan) and the secondary criterion is the total flowtime. In order to obtain the schedule with minimum makespan and minimum total flowtime, non-permutation schedules are being generated instead of permutation ones by permitting multiple jobs bypassing stages where misisng operations occur. A heuristic algorithm has been developed in order to generate non-permutations sequences through those stages. The heuristic algorithm has been compared with the existing heuristic methods in the literature, the ones generating permutation vs. the ones generating non-permutation schedules. Computational analysis is conducted to investigate the effects of certain parameter values such as the number of machines, the number of jobs and the percentage of missing operations. The results demonstrate slight improvement in the makespan as well as a significant improvement in total flowtime of schedules generated by the new heuristic procedure compared to leading non-permutation and permutation schedule generating heuristics, where the percentage of improvement gets higher with larger percentage of missing operations.
|
7 |
Teamwork Effectiveness For Successful Product Development: Relationship Between Engineers And Industrial DesignersPehlivan, Gozde 01 February 2007 (has links) (PDF)
Manufacturing companies are searching for new techniques day by day to launch qualified products with a competitive price to the market. Companies believe in the importance of teams which have members coming from different disciplines who use their knowledge, experiences, and creativity for achieving the goals of their teams.
The purpose of this study is to explore the effectiveness of teamwork for successful product development process by focusing on the relationship between the team members &ndash / especially engineers&rsquo / and industrial designers&rsquo / relation. After a broad literature survey, a descriptive-survey study that aims demonstrating the relationship between engineers and industrial designers in manufacturing companies in Turkey is held in order to investigate the effectiveness of teamwork in product development process. A twelve item questionnaire which has four open-ended questions and eight Likert-scaled statements has been prepared. As the result of this study, a positive relationship is found between the performance of product development team and the effects of cooperation, social and professional communication, having clear and common goals, sharing knowledge and experiences, leadership, coordination and cooperative problem solving and decision making processes to the relationship between engineers and industrial designers.
|
8 |
Monitoring High Quality Processes: A Study Of Estimation Errors On The Time-between-events Exponentially Weighted Moving Average SchemesOzsan, Guney 01 September 2008 (has links) (PDF)
In some production environments the defect rates are considerably low such that
measurement of fraction of nonconforming items reaches parts per million level. In
such environments, monitoring the number of conforming items between
consecutive nonconforming items, namely the time between events (TBE) is often
suggested. However, in the design of control charts for TBE monitoring a
common practice is the assumptions of known process parameters. Nevertheless,
in many applications the true values of the process parameters are not known.
Their estimates should be determined from a sample obtained from the process at a
time when it is expected to operate in a state of statistical control. Additional
variability introduced through sampling may significantly effect the performance
of a control chart. In this study, the effect of parameter estimation on the
performance of Time Between Events Exponentially Weighted Moving Average
(TBE EWMA) schemes is examined. Conditional performance is evaluated to
show the effect of estimation. Marginal performance is analyzed in order to make
recommendations on sample size requirements. Markov chain approach is used for
evaluating the results.
|
9 |
A Conwip Application In An Electronics CompanyGungorer, Elif 01 February 2010 (has links) (PDF)
In this thesis, a real world application of the constant work in process (Conwip) system in an electronics company is realized. The aim of the application is to reduce the work in process (WIP) inventory while maintaining the same throughput level. A model is developed to determine the constant work in process level of the Conwip system for the production lines in this company. The approximated mean value analysis approach is used for the solution. Real system data are collected before and after the Conwip application. Hypothesis tests are used to compare the WIP and the throughput levels of the Conwip system with the existing push control system for a pilot production line. Results of the hypothesis tests show that the Conwip production control system can signinifcantly reduce the WIP while maintaining the same throughput rate.
|
10 |
Tactical Inventory And Backorder Decisions For Systems With Predictable Production YieldMart, Turgut 01 May 2010 (has links) (PDF)
We consider a manufacturing system with stochastic demand and predictable production yield. The manufacturer has predetermined prices and limited production capacity in each
period. The producer also has the option to save some inventory for future periods even if there is demand in the current period. The demand that is not met is lost or may be backordered for only one period. Our objective is to maximize the expected profit by choosing optimal production, save and backorder quantities in each period. We formulate this problem
as a Markov Decision Process where the state of the system is represented by the net inventory and the efficiency parameter. We show that a modified (Y, S, B) policy is optimal in each period. At the end, we have some computational analysis to examine the effects of yield on the optimal decisions.
|
Page generated in 0.1129 seconds