Spelling suggestions: "subject:"all buildings productionsection scheduling."" "subject:"all buildings productionisation scheduling.""
1 |
A space-constrained resource-constrained scheduling system for multi-story buildings /Thabet, Walid Y., January 1992 (has links)
Thesis (Ph. D.)--Virginia Polytechnic Institute and State University, 1992. / Vita. Abstract. Includes bibliographical references (leaves 425-430). Also available via the Internet.
|
Page generated in 0.1969 seconds