Re-engineering the tender process at Tubular Track / Mattheus Casparus MareeMaree, Mattheus Casparus January 2015 (has links)
In any organisation processes can be seen evolving throughout their lifecycle and play a deciding
role in the efficiency of organisational activities. Tender processes are no different and with growing
competitiveness and globalisation it has become the responsibility of managerial staff to ensure
continuous improvement is applied to processes so organisational goals are consistently met and
knowledge, talents and other success factors are institutionalised therein.
The objective of this study was to perform an iteration of process re-engineering on the tender
process within Tubular Track, so that a tender could be performed more efficiently and more
competitively, and be more manageable. The investigation was carried out by means of a literature
review and interviews. This was done to establish an accurate baseline from the current process and
then re-engineer the system in its entirety. Verification of the investigation method was done through
application of the PMBOK proven project management methods, while validation was done by
comparison of processes through process improvement methodology principles as relationship.
Process improvement and its management is a continuous procedure but because this study only
focuses on the design of a new tender process for Tubular Track the conclusion that was made
through literature application and comparison was that the newly designed process is expected to
improve efficiency, manageability and time to complete.
In the final conclusion stage recommendations were also made that re-engineering phases be
planned and followed with corresponding risk and change management plans. Training needed for
personnel so that implementation would be optimally applied and continuous improvement
institutionalised would also need inspecting. / MIng (Development and Management Engineering), North-West University, Potchefstroom Campus, 2015
|
2 |
Re-engineering the tender process at Tubular Track / Mattheus Casparus MareeMaree, Mattheus Casparus January 2015 (has links)
In any organisation processes can be seen evolving throughout their lifecycle and play a deciding
role in the efficiency of organisational activities. Tender processes are no different and with growing
competitiveness and globalisation it has become the responsibility of managerial staff to ensure
continuous improvement is applied to processes so organisational goals are consistently met and
knowledge, talents and other success factors are institutionalised therein.
The objective of this study was to perform an iteration of process re-engineering on the tender
process within Tubular Track, so that a tender could be performed more efficiently and more
competitively, and be more manageable. The investigation was carried out by means of a literature
review and interviews. This was done to establish an accurate baseline from the current process and
then re-engineer the system in its entirety. Verification of the investigation method was done through
application of the PMBOK proven project management methods, while validation was done by
comparison of processes through process improvement methodology principles as relationship.
Process improvement and its management is a continuous procedure but because this study only
focuses on the design of a new tender process for Tubular Track the conclusion that was made
through literature application and comparison was that the newly designed process is expected to
improve efficiency, manageability and time to complete.
In the final conclusion stage recommendations were also made that re-engineering phases be
planned and followed with corresponding risk and change management plans. Training needed for
personnel so that implementation would be optimally applied and continuous improvement
institutionalised would also need inspecting. / MIng (Development and Management Engineering), North-West University, Potchefstroom Campus, 2015
|
3 |
The contextualization of decision-making processes in the Limpopo provincial government tender boardMakhura, Mochiphisi Piet January 2005 (has links)
Thesis (MPA.) --University of Limpopo, 2005 / Refer to document
|
4 |
Case Study on Requirements Communication in WTO-Regulated TendersHassan, Rawand January 2011 (has links)
Context. Public procurement is an important economic factor. To protect against corruption government organizations are required to apply principles of non-discrimination and transparency for the procurement of goods such as software and of services such as software development. As a consequence, communicating requirements in software procurement has become challenging from the perspective of fairness and transparency, and also from the perspectives of system value and acceptance. Objectives. This study investigates requirements communication techniques which are being practiced in WTO-regulated tenders. The study also identifies challenges and determines the efficiency, effectiveness, and legal compliances of these techniques Methods. A systematic literature review is used to determine requirements communication approaches used in public procurement projects and the difficulties identified. This is followed by a case study to research the known requirements communication techniques used in the selected case through conducting interviews and artifact analysis. Results. The contributions are guidelines for stakeholders to select suitable techniques to communicate requirements during the procurement process. Challenges and recommendations are presented to be taken into consideration while planning software procurements. Conclusions. This study concluded that from a total of 17 requirements communication techniques, 14 have been used in the project analyzed in the case study. It is also stated by the interviewees that all of the techniques are legal to use in public procurement with the exception of one, and this is Interview. From both the literature review and the case study conducted in this research, balanced communication techniques are concluded to be most recommended since they will lead to more interaction between customers and suppliers to communicate requirements.
|
5 |
Improving value for money on SANRAL's toll operations contractsSuremann, Peter January 2004 (has links)
The South African National Roads Agency Ltd (SANRAL) is the custodian
of the 9 208km national road network in South Africa. SANRAL's
mandate is to develop, maintain and operate this national economic
asset. 26,3°/o of the national road network consists of toll roads. The
operation and maintenance of the toll facilities are let by SANRAL
through a public open tender process. The successful tenderer is then
appointed by SANRAL on a contract basis as the toll road operator.
The operation and management of toll facilities involve various technical
and managerial disciplines, such as electrical, mechanical and civil
engineering, toll collection, and operations management. Historically,
toll operations contracts were fragmented into separate sub-contracts
for each of the disciplines. This resulted in a substantial amount of
project management input from SANRAL. In addition to SANRAL's high
level of management input, it also carried the risk of fraud. SANRAL
had no incentives for a toll operator to increase the toll revenues,
neither did it impose any penalties for poor performance.
In order to simplify the project structure, as well as to improve on the
old toll contract format, SANRAL developed a new toll operations
contract model, aptly named Comprehensive Toll Road Operations and
Maintenance or CTROM (C-T -ROM). Amongst others, the benefits of the
new contract format are:
• That it simplifies SANRAL's management input by providing a
single point of contact between SANRAL and a principal toll
operator, under whose supervision all the sub-contractors reside.
The toll operator therefore assumes the responsibility and
accountability to manage the sub-contractors.
• The introduction of penalties that are imposed on the toll
operator, should he not perform his contractually specified duties
and obligations.
• The transfer of fraud risk to the toll operator.
• An increase in the toll revenue by offering the toll operator a
revenue-sharing incentive.
The first contracts let under the CTROM format were the N2 North Coast
Toll Road and the N2 South Coast Toll Road in July 2001. As these toll
routes had been in operation for a while before the CTROM contracts
were procured, comparisons could be made on the pre-CTROM and
post-CTROM costs. Initial indications were, although there were some
structural differences between the old and the new format, that these
two CTROM contracts were between 7 and 13°/o more expensive than
their predecessors. An extrapolation of these values to all the current
CTROM contracts results in additional costs to SANRAL of between
R 10m and R 20m per annum, when compared to the previously used
managed contract format.
The more expensive CTROM contracts have brought about significant
benefits, such as the tra'nsfer of fraud risk from SANRAL to the toll
operator, as well as a simpler project structure in the form of a single
point of responsibility. The intention of this research report is to
determine whether the increase in cost has been worthwhile, and
whether there are areas for further improvement. In other words, are
the more expensive CTROM contracts providing SANRAL with an
associated increase in value for its money? Not only is SANRAL
concerned with the prudential expenditure of its toll revenues, but it is
also under legislated obligations to ensure that funds are spent in the
most appropriate and efficient ways.
In order to better understand value for money and related concepts, the
author explores various academic theories in the form of a literature
study. By building a platform from which to conduct further analyses,
the author can then apply the newly found knowledge to test the
hypothesis that SANRAL is not achieving optimal value for money on its
CTROM contracts.
Concepts and theories that are studied in the literature review include:
• The legislative and institutional framework; and
• Key terminology such as risk management, the public sector
comparator, value for money, and performance penalties on
contracts.
Many of the concepts have been explored worldwide, especially in
developed countries such as Australia, Canada, Hong Kong and the
United Kingdom, where those countries' governments actively
encourage private sector investment in public infrastructure.
In the analytical part of the research report, the author explores the
causes of the additional costs on two of SANRAL's toll routes, namely:
• The Mariannhill Toll Route, which is located on the N3 between
Pinetown and Key Ridge in the province of KwaZulu-Natal; and
• The N 17 Toll Route between Springs and Wemmer Pan in the
province of Gauteng.
The analyses suggest that the operations and maintenance (O&M) costs
of the N3 Mariannhill and N 17 toll routes under the CTROM contracts are
46,3°/o and 20,4°/o more expensive than on the previous contracts.
Some of the factors that could play a role in the increased cost of the
CTROM contracts are:
• The contract duration;
• Risk transfer to the toll operator;
• Penalties applied when the toll operator does not conform to the
required specifications; and
• Complex performance specifications.
University of Pretoria
Graduate School of Management
MBA Research Report RPJ820 v
P Suremann
91052719
October 2004
Digitised by the University of Pretoria, Library Services, 2014
The author concludes that there are a number of factors that negatively
influence the cost of the CTROM contracts. The author therefore
recommends that the factors that are within the control of SANRAL be
changed. These improvements should bring about better value for
money on SANRAL's toll operations contracts. / Dissertation (MAdmin)--University of Pretoria, 2004. / gm2014 / School of Public Management and Administration / unrestricted
|