Spelling suggestions: "subject:"4traffic engineering city planning"" "subject:"4traffic engineering ity planning""
1 |
An urban design approach to traffic management : a case study of circular road area in Lahore, Pakistan /Akhtar, Muhammad Nadeem. January 1992 (has links)
Thesis (M.U.D.)--University of Hong Kong, 1994. / Includes bibliographical references (leaves 158-159).
|
2 |
An urban design approach to traffic management a case study of circular road area in Lahore, Pakistan /Akhtar, Muhammad Nadeem. January 1992 (has links)
Thesis (M.U.D.)--University of Hong Kong, 1994. / Includes bibliographical references (leaves 158-159) Also available in print.
|
Page generated in 0.1321 seconds