Spelling suggestions: "subject:"4traffic flow - china - long long."" "subject:"4traffic flow - china - long hong.""
1 |
Calibration of new sheared delay formulae for the estimation of queuesand delays in TRANSYTWong, Wai-tak., 王偉德. January 1999 (has links)
published_or_final_version / Civil Engineering / Master / Master of Philosophy
|
2 |
Implications of intensified trans-boundary vehicular traffic on transport infrastructure in Hong Kong傅義明, Fu, Yee-ming. January 2002 (has links)
published_or_final_version / Urban Planning / Master / Master of Science in Urban Planning
|
3 |
Optimization of traffic flows in road tunnels between Shatin and metropolitan areaHo, Kwok-hung, Patrick, 何國雄 January 2004 (has links)
published_or_final_version / abstract / toc / Transport Policy and Planning / Master / Master of Arts in Transport Policy and Planning
|
4 |
West Kowloon ferry terminal尹國富, Wan, Kwok-fu, Colin. January 1994 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
Page generated in 0.1028 seconds