• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Förstudie för kontrollanläggningsutrustningi mindre vattenkraftstationer för Uddevalla Energi Elnät AB / Prestudy of protection, monitoring and controlequipment in small hydroelectric power plants for Uddevalla Energi Elnät AB

Karlsson, Sanne, Maurer, Alexander January 2015 (has links)
Uddevalla Energi AB äger fem vattenkraftstationer uppförda från 1920 och framåt. De är lokaliserade i Bäveån i Uddevalla kommun. Den totala installerade effekten i vattenkraftstationerna uppgår till omkring 2 MW. Vattenkraftstationen K4 Fossumsberg,vars installerade effekt uppgår till 1 MW, är den största utav anläggningarna ur denna aspekt. Utöver energiproduktion ska anläggningarna även svara för reglering av vattenståndet i Öresjö och i Bäveån. På uppdrag av Uddevalla Energi Elnät AB utförs detta examensarbete för att fastställa vilken utrustning som rekommenderas till kontrollanläggningarna för vattenkraftstationerna. De huvudområden som undersöks är generatorskydd, reglering, kommunikation och HMI. Krav från Uddevalla Energi Elnät AB ställs på olika skyddsfunktioner som exempelvi söverströmsskydd, jordfelsskydd, över- och underspänningsskydd, samt bakeffektskydd.Vidare önskas även att ny utrustning ska vara kompatibel med protokoll som stödjer MicroSCADA och har möjligheter för framtida användning av protokollet IEC 60870-5 för kommunikation mellan stationsutrustning och SCADA-systemet i driftcentralen. En rad produkter, varav ett flertal skulle kunna lämpa sig väl för ändamålen, undersöks från leverantörerna Schneider Electric, ABB och DEIF. Slutsatser dras bland annat om att Uddevalla Energi Elnät AB bör investera i separata enheter för reglering och för generatorskydd och inte kombinerade lösningar. Detta för att uppnå större säkerhet i händelse av fel i anläggningarna. Vidare konstateras att för att få ett komplett underlag att luta sig mot vid val av utrustning bör priser undersökas ytterligare, för att kunna väga in denna aspekt. / Five small hydroelectric power plants, constructed 1920 and later, are owned by UddevallaEnergi AB. The hydroelectric power plants are located in Bäveån in Uddevalla. The total installed power is approximately 2 MW. K4 Fossumsberg is the largest hydroelectric powerplant and has a production capacity of 1 MW. The hydroelectric power plants is not only used for energy production but also for regulation of the water levels in Bäveån and Öresjö. On behalf of Uddevalla Energi Elnät AB this bachelor thesis has been done to specify which equipment is preferable as the station monitoring and control equipment. The key areas ofthe report is generator protection, control and regulation, communication and HMI in the plants. There are demands from Uddevalla Energi Elnät AB regarding for instance overcurrent protection, earth fault protection, over- and under voltage protection and reversepower protection. Furthermore it is requested that the new station monitoring and controlequipment is compatible with MicroSCADA and has further options for using the protocol IEC 60870-5 for communication between station and the SCADA system used in the operating centre. Numerous products has been studied and many of them fulfil the requirements stated by Uddevalla Energi Elnät AB. The manufactures mentioned in this report are Schneider Electric, ABB and DEIF. Conclusions are made that Uddevalla Energi Elnät AB should invest in separate units for control and generator protection to achieve a higher level of safety in case of a fault in either generator protection or control equipment. Furthermore it is concluded that to obtain a more complete specification to use when choosing equipment one should consider the cost. More research is needed to take this into account.
2

Hydraulický agregát pro regulaci parní turbíny / Hydraulic power unit for the regulation steam turbine

Morávek, Aleš January 2016 (has links)
This diploma thesis is focused on the design of high-pressure hydraulic unit to drive a regulation of condensation turbine. The aim is to calculate all the elements of the hydraulic system, piping design and the necessary drawings. The entire assembly consists of purchased parts from other manufacturers. Major oil tank and a safety catch tank is described in detail and will be made, not bought.
3

Parní turbina rychloběžná kondenzační / High-speed Condesing Steam Turbine

Klíma, Petr January 2015 (has links)
ith one controlled extraction and one uncontrolled extraction, calculation of the flow channel at all stage, design and calculation of the regulation valve and create connection diagram of steam turbine and air cooled condenser. At the beginning of this work is an overview of manufacturers of steam turbines and their unified products. Master thesis was developer with G-Team, a.s. as using calculations and the instructions given in the recommended literature with supporting CFD simulations to determine the loss coefficients and FEA simulations to determine the eigenfrequencies blades.

Page generated in 0.0954 seconds