Spelling suggestions: "subject:"anited btates. bilitary supplied"" "subject:"anited btates. hilitary supplied""
1 |
An analysis of the prediction accuracy of the U.S. Navy repair turn-around time forecast model /Santos, William O. January 2003 (has links) (PDF)
Thesis (M.S. in Operations Research)--Naval Postgraduate School, June 2003. / Thesis advisor(s): Robert A. Koyak, Samuel E. Buttrey. Includes bibliographical references (p. 55). Also available online.
|
2 |
An assessment of the IMEF depot-level corrosion prevention and control program and the viability of making it more efficient and/or outsourcing the requirements through private sector initiatives /Mullen, Steven J. January 2002 (has links) (PDF)
Thesis (M.S. in Management)--Naval Postgraduate School, December 2002. / Thesis advisor(s): Ron Tudor, Ken Doerr. Includes bibliographical references (p. 49-51). Also available online.
|
Page generated in 0.0741 seconds