Avaliação expedita do custo de implantação de micro centrais hidrelétricasBalarim, Carlos Roberto [UNESP] 12 1900 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:24:44Z (GMT). No. of bitstreams: 0
Previous issue date: 1996-12Bitstream added on 2014-06-13T20:12:56Z : No. of bitstreams: 1
balarim_cr_me_botfca.pdf: 651534 bytes, checksum: c4b51b3ad799882cda4bdf60e8ff4fe0 (MD5) / O presente trabalho apresenta método para a avaliação do custo de implantação de micro centrais hidrelétricas apropriadas para comunidades pequenas e isoladas. Tais centrais caracterizam-se por requerer projetos de concepção simples, por usar intensivamente a mão de obra e as indústrias da região e por apresentar custos de projeto e de implantação compatíveis com as finalidades da obra. Tendo em vista tais fatos, foi elaborado projeto-padrão para centrais com potência de 5, 10, 15, 20, 30, 50, 75 e 100 Kw e quedas de água variando de 5 a 60 metros. Os resultados obtidos fornecem elementos que permitem a análise rápida de um projeto para implantação de uma micro central hidrelétrica, com a definição do valor do investimento através de gráfico queda x potência x custo. / This dissertation presents a cost evaluation method for hydroelectric power plants with suitable technology for small isolated communities. These projects should be done with a simple technical planning approach since the construction is usually done with local labor and industrial support. The project and construction costs should be appropriate to the dimensions of the plant and the sistem to be supplied. The research was done for a standard typical project with installed capacities varying from 5 to 100 kW and heads from 5 to 60 meters. These results can be used for preliminary studies of the feasibility of a given site. Costs are presented with the use of “cost x head x capacity” curves.
|
2 |
Avaliação expedita do custo de implantação de micro centrais hidrelétricas /Balarim, Carlos Roberto. January 1996 (has links)
Resumo: O presente trabalho apresenta método para a avaliação do custo de implantação de micro centrais hidrelétricas apropriadas para comunidades pequenas e isoladas. Tais centrais caracterizam-se por requerer projetos de concepção simples, por usar intensivamente a mão de obra e as indústrias da região e por apresentar custos de projeto e de implantação compatíveis com as finalidades da obra. Tendo em vista tais fatos, foi elaborado projeto-padrão para centrais com potência de 5, 10, 15, 20, 30, 50, 75 e 100 Kw e quedas de água variando de 5 a 60 metros. Os resultados obtidos fornecem elementos que permitem a análise rápida de um projeto para implantação de uma micro central hidrelétrica, com a definição do valor do investimento através de gráfico queda x potência x custo. / Abstract: This dissertation presents a cost evaluation method for hydroelectric power plants with suitable technology for small isolated communities. These projects should be done with a simple technical planning approach since the construction is usually done with local labor and industrial support. The project and construction costs should be appropriate to the dimensions of the plant and the sistem to be supplied. The research was done for a standard typical project with installed capacities varying from 5 to 100 kW and heads from 5 to 60 meters. These results can be used for preliminary studies of the feasibility of a given site. Costs are presented with the use of "cost x head x capacity" curves. / Orientador: Luiz Antonio Targa. / Coorientador: Ruy Fernando Sant'Ana. / Mestre
|
3 |
Análise de viabilidade econômica e financeira de uma pequena central hidrelétricaPineli, Geraldo [UNESP] 30 September 2005 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:24:42Z (GMT). No. of bitstreams: 0
Previous issue date: 2005-09-30Bitstream added on 2014-06-13T20:32:01Z : No. of bitstreams: 1
pineli_g_me_fca.pdf: 604969 bytes, checksum: 4e682eda0ad53ee72250a1841ee8f736 (MD5) / Universidade Estadual Paulista (UNESP) / O nível de consumo de energia é uma das formas de se aferir o desenvolvimento econômico de uma sociedade. No Brasil, o investimento no setor elétrico realizado na década de 1970, possibilitou crescimento significativo do consumo de energia. Em 2002 a fonte hídrica correspondia a 74,7% da oferta interna de energia. Tendo em vista o esgotamento do modelo estatal de geração e distribuição de energia elétrica, a busca de investimentos privados foi iniciada na década de l990. A eliminação da influência política na determinação das tarifas e a manutenção de legislação compatível foram necessárias, para tornarem viáveis as aplicações de recursos privados no setor. Os problemas ambientais, hidrológicos e geológicos além dos econômicos, restringem a construção de grandes usinas. Assim, o aproveitamento de pequenas quedas de água apresenta-se como opção viável na composição da matriz energética nacional. O presente trabalho tem como objetivo analisar a viabilidade econômico-financeira de pequena central hidrelétrica, tomando-se como modelo uma em funcionamento. Foram colhidos junto ao proprietário da empresa e fornecedores de equipamentos, os custos para a montagem da usina, bem como os valores das receitas e despesas realizadas durante um ano. Com base nas medidas de vazões existentes foi analisada a produtividade da usina em relação à sua capacidade instalada. Verificou-se o crescimento da produtividade comparando-se a produção no período de janeiro a agosto de 2004 em relação aos mesmos meses de 2003. Considerando que os custos de mão de obra tornam-se relativamente caros para pequenos níveis de produção, bem como a elevada taxa de juros praticada no mercado brasileiro, pode-se visualizar a necessidade da diferenciação de preços por kWh pagos ao produtor, a fim de viabilizar o investimento... / The consumption of energy is one of the forms to measure the economic development of a society. In Brazil, the investment in the electric sector during the decade of 1970 enabled a significant growth of the energy consumption. In 2002 the water source was responsible for 74,7 % of the energy domestic supply. Foreseeing the exhaustion of the governmental model of generation and distribution of electric energy, the search for private investments was initiated in the decade of l990. The elimination of the political influence on determining prices for the service and the maintenance of compatible legislation were necessary to allow private investments in the sector. The environmental, hydrological and geologic problems and the economic ones, restrict the construction of hydroelectric power-station. Thus, the utilization of small waterfalls is a viable option to integrate the national energy matrix. This paper aims to analyze the viability of a small hydroelectric power station, using a working one as a model. The owner of the company and of the equipment provided the total costs for the assembly of the plant, as well as the costs through the year and the annual turnover. Based on measures of existing outflows, the productivity of the plant was analyzed, compared to the installed capacity. The increase of the productivity was verified comparing the production between January and August of 2004 with the same period in 2003. Considering that the costs of human labor become relatively expensive for small levels of production, as well as the high rate of interests carried out in the Brazilian market, it shows the necessity of a differentiation on prices per kWh to the producer, in order to make the investment possible. The monetary data analyzed as investment, costs and turnover, allowed to conclude that the economic viability of the small plants needs raising long-term financing...(Complete abstract click electronic access below)
|
4 |
Análise de viabilidade econômica e financeira de uma pequena central hidrelétrica /Pineli, Geraldo, 1950- January 2005 (has links)
Orientador: Angelo Cataneo / Banca: José Angelo Cagnon / Banca: Valdeir Rejanildo Vidrick / Resumo: O nível de consumo de energia é uma das formas de se aferir o desenvolvimento econômico de uma sociedade. No Brasil, o investimento no setor elétrico realizado na década de 1970, possibilitou crescimento significativo do consumo de energia. Em 2002 a fonte hídrica correspondia a 74,7% da oferta interna de energia. Tendo em vista o esgotamento do modelo estatal de geração e distribuição de energia elétrica, a busca de investimentos privados foi iniciada na década de l990. A eliminação da influência política na determinação das tarifas e a manutenção de legislação compatível foram necessárias, para tornarem viáveis as aplicações de recursos privados no setor. Os problemas ambientais, hidrológicos e geológicos além dos econômicos, restringem a construção de grandes usinas. Assim, o aproveitamento de pequenas quedas de água apresenta-se como opção viável na composição da matriz energética nacional. O presente trabalho tem como objetivo analisar a viabilidade econômico-financeira de pequena central hidrelétrica, tomando-se como modelo uma em funcionamento. Foram colhidos junto ao proprietário da empresa e fornecedores de equipamentos, os custos para a montagem da usina, bem como os valores das receitas e despesas realizadas durante um ano. Com base nas medidas de vazões existentes foi analisada a produtividade da usina em relação à sua capacidade instalada. Verificou-se o crescimento da produtividade comparando-se a produção no período de janeiro a agosto de 2004 em relação aos mesmos meses de 2003. Considerando que os custos de mão de obra tornam-se relativamente caros para pequenos níveis de produção, bem como a elevada taxa de juros praticada no mercado brasileiro, pode-se visualizar a necessidade da diferenciação de preços por kWh pagos ao produtor, a fim de viabilizar o investimento...(Resumo completo, clicar acesso eletrônico abaixo) / Abstract: The consumption of energy is one of the forms to measure the economic development of a society. In Brazil, the investment in the electric sector during the decade of 1970 enabled a significant growth of the energy consumption. In 2002 the water source was responsible for 74,7 % of the energy domestic supply. Foreseeing the exhaustion of the governmental model of generation and distribution of electric energy, the search for private investments was initiated in the decade of l990. The elimination of the political influence on determining prices for the service and the maintenance of compatible legislation were necessary to allow private investments in the sector. The environmental, hydrological and geologic problems and the economic ones, restrict the construction of hydroelectric power-station. Thus, the utilization of small waterfalls is a viable option to integrate the national energy matrix. This paper aims to analyze the viability of a small hydroelectric power station, using a working one as a model. The owner of the company and of the equipment provided the total costs for the assembly of the plant, as well as the costs through the year and the annual turnover. Based on measures of existing outflows, the productivity of the plant was analyzed, compared to the installed capacity. The increase of the productivity was verified comparing the production between January and August of 2004 with the same period in 2003. Considering that the costs of human labor become relatively expensive for small levels of production, as well as the high rate of interests carried out in the Brazilian market, it shows the necessity of a differentiation on prices per kWh to the producer, in order to make the investment possible. The monetary data analyzed as investment, costs and turnover, allowed to conclude that the economic viability of the small plants needs raising long-term financing...(Complete abstract click electronic access below) / Mestre
|