• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • No language data
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Use of selected macroinvertebrates as indicators of sedimentation effects on Huntington River, Utah

Reichert, Michael Kenneth 18 March 1975 (has links)
Benthic macroinvertebrate communities of Huntington River, Emery County, Utah were studied to determine effects of sedimentation from construction of Electric Lake Dam, a state highway, and two bridges. Approximately 900 benthic samples were collected from riffle areas above, in, and below the construction zone from January, 1971 to December, 1973. Two settling basins below construction sites were effective in limiting scouring of downstream communities. Heavy silt deposition was limited to a 1-km stream reach. Number of indicators, density, and biomass were reduced in the construction zone during periods of sediment input. During periods of scouring, density and biomass were reduced; however, community diversity (d̅) increased due to a reduction of the more populous taxa. The mean d̅ value in the construction zone was 2.05 compared to 2.81 outside. Ordination analysis revealed dissimilarity in communities in, above, and below the construction zone. Specific indicators showed varying response to sedimentation. Recovery was rapid following scouring but slow following sedimentation.

Page generated in 0.1082 seconds