Spelling suggestions: "subject:"value off case"" "subject:"value off caso""
11 |
Řízení cash flow při minimální ceně stavební zakázky / Cash Flow Management of Construction Project In Case of Minimum PriceŠmýdová, Lucie January 2013 (has links)
The content of this master‘s thesis is cash flow management of a construction project in case of minimum price "Intensification sewage Sokolov - Phase I". Two alternatives of cash flow management of a construction project are compared, which differ in the contractual terms between the construction company and the contractor subcontracting. In the first alternative the business requires payment of the invoices within 90 days and the assurance with a bank guarantee by subcontractors. In the second variant subcontractor has provided the company the possibility of using a 9% discount with payments within 30 days and provide guarantee restraints. The expected present value of cash flow is used to evaluate the most suitable alternative. The result of my master‘s thesis is to identify potential risks and opportunities to ensure the liquidity of the contract.
|
12 |
Oceňování stavebního podniku / Evaluation of Building CompanyPalasová, Lenka January 2012 (has links)
Master`s thesis named „Evaluation of Building Company“ is focused on the explanation of the concept of value and his various forms and use, the definition of procedure of evaluation of company, some parts of the procedure are broken down, but the main part of this thesis is a description of used methods of evaluation of company. In the practical part particular company is evaluated by selected methods based on statements of accounts and other obtained information.
|
Page generated in 0.0764 seconds