• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • No language data
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

GLR Control Charts for Process Monitoring with Sequential Sampling

Peng, Yiming 06 November 2014 (has links)
The objective of this dissertation is to investigate GLR control charts based on a sequential sampling scheme (SS GLR charts). Phase II monitoring is considered and the goal is to quickly detect a wide range of changes in the univariate normal process mean parameter and/or the variance parameter. The performance of the SS GLR charts is evaluated and design guidelines for SS GLR charts are provided so that practitioners can easily apply the SS GLR charts in applications. More specifically, the structure of this dissertation is as follows: We first develop a two-sided SS GLR chart for monitoring the mean μ of a normal process. The performance of the SS GLR chart is evaluated and compared with other control charts. The SS GLR chart has much better performance than that of the fixed sampling rate GLR chart. It is also shown that the overall performance of the SS GLR chart is better than that of the variable sampling interval (VSI) GLR chart and the variable sampling rate (VSR) CUSUM chart. The SS GLR chart has the additional advantage that it requires fewer parameters to be specified than other VSR charts. The optimal parameter choices are given, and regression equations are provided to find the limits for the SS GLR chart. If detecting one-sided shifts in μ is of interest, the above SS GLR chart can be modified to be a one-sided chart. The performance of this modified SS GLR chart is investigated. Next we develop an SS GLR chart for simultaneously monitoring the mean μ and the variance 𝜎² of a normal process. The performance and properties of this chart are evaluated. The design methodology and some illustrative examples are provided so that the SS GLR chart can be easily used in applications. The optimal parameter choices are given, and the performance of the SS GLR chart remains very good as long as the parameter choices are not too far away from the optimized choices. / Ph. D.
2

Process Monitoring with Multivariate Data:Varying Sample Sizes and Linear Profiles

Kim, Keunpyo 01 December 2003 (has links)
Multivariate control charts are used to monitor a process when more than one quality variable associated with the process is being observed. The multivariate exponentially weighted moving average (MEWMA) control chart is one of the most commonly recommended tools for multivariate process monitoring. The standard practice, when using the MEWMA control chart, is to take samples of fixed size at regular sampling intervals for each variable. In the first part of this dissertation, MEWMA control charts based on sequential sampling schemes with two possible stages are investigated. When sequential sampling with two possible stages is used, observations at a sampling point are taken in two groups, and the number of groups actually taken is a random variable that depends on the data. The basic idea is that sampling starts with a small initial group of observations, and no additional sampling is done at this point if there is no indication of a problem with the process. But if there is some indication of a problem with the process then an additional group of observations is taken at this sampling point. The performance of the sequential sampling (SS) MEWMA control chart is compared to the performance of standard control charts. It is shown that that the SS MEWMA chart is substantially more efficient in detecting changes in the process mean vector than standard control charts that do not use sequential sampling. Also the situation is considered where different variables may have different measurement costs. MEWMA control charts with unequal sample sizes based on differing measurement costs are investigated in order to improve the performance of process monitoring. Sequential sampling plans are applied to MEWMA control charts with unequal sample sizes and compared to the standard MEWMA control charts with a fixed sample size. The steady-state average time to signal (SSATS) is computed using simulation and compared for some selected sets of sample sizes. When different variables have significantly different measurement costs, using unequal sample sizes can be more cost effective than using the same fixed sample size for each variable. In the second part of this dissertation, control chart methods are proposed for process monitoring when the quality of a process or product is characterized by a linear function. In the historical analysis of Phase I data, methods including the use of a bivariate <i>T</i>² chart to check for stability of the regression coefficients in conjunction with a univariate Shewhart chart to check for stability of the variation about the regression line are recommended. The use of three univariate control charts in Phase II is recommended. These three charts are used to monitor the <i>Y</i>-intercept, the slope, and the variance of the deviations about the regression line, respectively. A simulation study shows that this type of Phase II method can detect sustained shifts in the parameters better than competing methods in terms of average run length (ARL) performance. The monitoring of linear profiles is also related to the control charting of regression-adjusted variables and other methods. / Ph. D.

Page generated in 0.0962 seconds