11 |
In-process storage for continuous production linesHutchinson, Douglas Hynds 08 1900 (has links)
No description available.
|
12 |
Assembly line balancing by zero-one integer programmingThangavelu, S. R. 12 1900 (has links)
No description available.
|
13 |
Component allocation to balance workload in printed circuit card assembly systemsDePuy, Gail Whitehouse 08 1900 (has links)
No description available.
|
14 |
Optimisation of assembly sequences using genetic algorithms /Marian, Romeo Marin Unknown Date (has links)
Assembly Sequence Planning (ASP) is part of Assembly Planning. The assembly sequence is the most important part of an assembly plan. Assembly has an important share in both lead time and cost of a product. Therefore, its optimisation is necessary to ensure the competitivity of manufactured goods. The aim of this thesis is the optimisation of assembly sequences for mechanical products, for real/realistic problems and constraints. This thesis represents an integrated approach in assembly sequence planning and optimisation. It tackles real problems by building the generality in the models. / Thesis (PhD)--University of South Australia, 2003.
|
15 |
Minimizing the make-span in a high-product mix shop-floor using integer programmingSekar, Vikram. January 2007 (has links)
Thesis (M.S.)--State University of New York at Binghamton, Dept. of Systems Science and Industrial Engineering, 2007. / Includes bibliographical references.
|
16 |
An investigation on bottleneck location, capacity, and buffer size on flow and flexible flow linesKulkarni, Niranjan. Unknown Date (has links)
Thesis (M.S.)--State University of New York at Binghamton, Department of Systems Science and Industrial Engineering, 2006. / Includes bibliographical references (leaves 117-120).
|
17 |
The evaluation of a production scheduling heuristic for production lines with changeover costs and dependent parallel processorsDai, Bin. January 1990 (has links)
Thesis (M.S.)--Ohio University, November, 1990. / Title from PDF t.p.
|
18 |
An investigation of inspector accuracy at the task of recognizing random numbersDobson, George Paul. January 1964 (has links)
Call number: LD2668 .T4 1964 D63 / Master of Science
|
19 |
Factors affecting industrial learning on interrupted production schedulesDaniels, Roger Warren. January 1966 (has links)
LD2668 .T4 1966 D35 / Master of Science
|
20 |
Bottleneck detection and mitigation in serial production systemsRamesh, Abishek. Smith, Jeffrey S. January 2006 (has links)
Thesis--Auburn University, 2006. / Abstract. Vita.
|
Page generated in 0.0752 seconds