• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 39
  • Tagged with
  • 39
  • 37
  • 18
  • 13
  • 12
  • 9
  • 9
  • 7
  • 7
  • 7
  • 7
  • 7
  • 6
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Lávka mezi budovami. / The bridge among buildings

Chaloupka, Petr January 2012 (has links)
This master's thesis deals with the designing of the appropriate supporting steel structure footbridge for pedestrians. The footbridge is used to connect two separate buildings (buildings D and Z at the Faculty of Civil Engineering Brno University of Technology). Four variants have been designed about solutions supporting steel structure. The final variant was prepared in detail and was carried out static assessment of the individual elements and selected details. The main supporting structure of this variant are two trusses. Diagonals of these trusses are designed linkage system of Macalloy 460. Bridge deck is designed of composite steel a concrete board with crossbars. The footbridge is designed as simple beam with an overhanging end. Length span is 34.8 m, length overhanging ends is 5.8 meters. The total length of the footbridge is 40.6 meters. Width of footbridge is 2.8 meters. Free width is 2 meters. In the cross point with the axis of local road is height of footbridge above ground 4.43 meters. Next to the building Z, there is a footbridge stored on a concrete support, near the building D, the footbridge is stored on a steel frame of support. The footbridge is deposited on elastomeric bearings. The footbridge is being protected from the weather. The sheating of the building is designed by Wictec 60 system. The master's thesis also contains drawing documentation of the proposed solution.
32

Výstavba školy Rajhrad – stavebně technologická příprava / Construction of school Rajhrad – construction and technological preparation

Kijonka, Jakub January 2012 (has links)
Subject of this master thesis is the structural and technological background for the construction of high school in Rajhrad. This consists of time and finanical plans, technological instructions for the reinforced concrete monolithic skeleton, time schedule, item budget, construction site layout, machinery configuration , audit and evaluation plans, work place safety protocols, environmental plan of the construction site.
33

Metody hodnocení rizik prostřednictvím fuzzy logiky / Fuzzy logic methods for the risk assessment

Kovář, Kamil January 2013 (has links)
Master´s thesis deals about problematic of fuzzy logic, fuzzy sets and operation with them. Also thesis describing procedure of quantification risks through fuzzy sets, process of fuzzyfication, defuzzyfication a theirs application in the expert systems FMEA and FMECA. Using selected chapters of czech states standards are established critical areas in building process, it is a chapters about quality, safety and environment. With these areas by using fuzzy sets theory are created the procentual input values in the decision program, created by Matlab. Output from program is decision how big the risk rate is and if is necessarily make corrective measures. A concrete example is the production of concrete goods, describing production process and composition of fresh concrete. A practical example, created by using information from real company, is a decision about the risk rate in the qualitative area.
34

Galerie letecké techniky a tradic letectví na letišti Medlánky v Brně / Gallery aviation technology and traditions of aviation at the airport Medlánky in Brno

Bělehradová, Věra January 2016 (has links)
Sport Airport complex Brno-Medlánky is nestled in the undulating hilly terrain in fields just beyond populated areas in Brno-Medlánky. The history of the airport dates back to 1924 when it was built the first wooden hangar for training purposes glider flights. Current state urban of airport is orderless. The aim is to streamline the complex and give it the order, allowing easy and efficient orientation in the space. The main intervention was the creation of a new central building - Aviation Museum. The concept of the design is based on the division of the whole area into two branches - communication axes, based on the mass preserved historic wooden hangars. Between the two communication arms is inserted a central axis on which is located the heart of the complex - Aviation Museum. It is a building organic form, inspiring axially symmetric wingspan (bird, airplane, beetle). It is this symmetry axis of the building creates a view towards building on the runway. Mass of the building used by the sloping terrain and is partially sunk under the ground. Building volume follows an upward slope from the outside and blends with the surrounding terrain. The internal layout consists of three floors, one of them is completely sunk below ground level and second half. The main entrance to the gallery is located in the uppermost floors, the direction of the exhibition is therefore directed downwards into the basement. The exposition is divided into six parts: RC models exposure, gliders exposure, powered aircraft exposure, screening room, children's exposure and air trainers. Other areas consist of building technical facilities. In the basement there is a workshop with aircraft lift, with the possibility of placement unexposed aircrafts. The supporting system of the building consists of two parts: reinforced concrete tubs and arched steel structure with a span of 50m.
35

Studie odpočívky a velkokapacitního záchytného parkoviště pro TIR na dálnici D1 / The Study of the Parking Area on the Motorway D1

Šťastný, Radek January 2013 (has links)
The task of my diploma work is the study of the parking area on the motorway D1 near Vyškov. This place will be connected with the motorway D1 between the present exit Vyškov – West (226) and Vyškov – East (230/1) in the direction to Kroměříž. The parking area (the parking place, the petrol station, the restaurant) and the truckpark will be designed with the reason of the high intensity of cars and lorries on the motorway D1 and with the reason of the lack of the parking places for the lorries.
36

Bytový dům, Újezd u Brna / Block of flats, Újezd u Brna

Sedláček, Ondřej January 2013 (has links)
This work deals with a new building – block of flats on land no. 1799/1, 1800/1 cadastral Újezd u Brna, region Brno - venkov. This building contains 15 individual flats. The object is geometrically divided on central part with gabled roof and 2 side parts with hip roof. Slopes of roofs 10°. Building is designed as three-storey object without a cellarage, whence all three storeys are residential . The building is accessible from local road and it is possible to park a car next to the object in new-build parking place. Residential rooms are positively rotated to south and ventilated naturally. All the residential rooms are exposed to direct day light. Sidewalk and hard surface are treated as concrete and scrubbed pavement. Construction peripheral bearing masonry, interior bearing masonry and cross buntons effected from ceramic breeze-block POROTHERM. Ceilings plates are made of reinforced concrete. Staircase are made of reinforced concrete as well.
37

Projekt podzemních garáží v Brně / Design of underground garage in Brno

Hájek, Jan January 2012 (has links)
The goal of the project is behaviour and dimensioning of selected monolithic concrete structure elements. Design and assessment of the building foundation was made. Slabs of the floors are dimensioned in detail. All computations are made in accordance with Eurocode 2. Drawing documentation is part of this project.
38

Stavebně technologický projekt výrobní haly v Hodějicích / Construction Project for Implementation of Industrial Hall in Hodějice

Koudelková, Anna Unknown Date (has links)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.
39

Verifikace nelineárních materiálových modelů betonu / Verification of nonlinear material models of concrete

Král, Petr January 2015 (has links)
Diploma thesis is focused on the description of the parameters of nonlinear material models of concrete, which are implemented in a computational system LS-DYNA, interacting with performance of nonlinear test calculations in system LS-DYNA on selected problems, which are formed mainly by simulations of tests of mechanical and physical properties of concrete in uniaxial compressive and tensile on cylinders with applying different boundary conditions and by simulation of bending slab, with subsequent comparison of some results of test calculations with results of the experiment. The thesis includes creation of appropriate geometric models of selected problems, meshing of these geometric models, description of parameters and application of nonlinear material models of concrete on selected problems, application of loads and boundary conditions on selected problems and performance of nonlinear calculations in a computational system LS-DYNA. Evaluation of results is made on the basis of stress-strain diagrams and load-displacement diagrams based on nonlinear calculations taking into account strain rate effects and on the basis of hysteresis curves based on nonlinear calculations in case of application of cyclic loading on selected problems. Verification of nonlinear material models of concrete is made on the basis of comparison of some results of test calculations with results obtained from the experiment.

Page generated in 0.0484 seconds