201 |
Náhrada stávajícího zdroje vytápění průmyslového objektu / Substitution for a current source of heat in the industrial areaNovák, Jan January 2011 (has links)
The main aim of the thesis is to design a final draft for the reconstruction of the central heating plant of the industrial complex. The background research outlines a brief description of the development of heating plant industry, boilers and conditions for the selection of a suitable heat source for the particular area. Further, there are listed standard possibilities of heat sources for industrial complex, which does not use heat for technological purposes only, but as well as for heating and warming up of supply water. The finding and presentation section summarize the current energy supply and the design of two variants for conceptual modernization of the boiler plant. According to the annual and daily chart for the need for heat, there are specified required heat outputs, which are supposed to be distributed to the campus network of heating and as well as the fuel consumption. One of the options considers the use of storage tanks. The conclusion compares both suggested options.
|
202 |
Výroba tepla a elektrické energie ve spalovně směsného komunálního odpadu / Heat and electricity production in waste -to -energy plantSzegedi, Peter January 2012 (has links)
This diploma thesis deals with a design of steam boiler used to incineration of mixed municipal waste. Based on the specified fuel and the required output parameters of the steam from a steam boiler is calculated stoichiometry of incineration, thermal losses and overall boiler efficiency. Other chapters of thesis are focused on construction and thermal calculation of boiler moves. Finally, this thesis is to check heat balance of the boiler.
|
203 |
parní kotel na dřevo výkonu 50t/h / Stean boiler for wood burning 50t/hVitula, Michal January 2012 (has links)
Steam boiler for wood burning 50t/h In this diploma thesis I will deal design of the steam grate boiler 50t/h of burning clean wood. For the specified parameters make a stoichiometric calculations and calculate the enthalpy of the air and combustion. I shall calculate the heat balance, losses of boiler and thermal efficiency of the boiler. The following section make a design of the combustion chamber and its thermal calculation. After determining the dimensions of the combustion chamber further continue by calculating boiler moves and heating surfaces. Finally check the overall heat balance.
|
204 |
Fluidní kotel na spalování uhlí a biomasy 150t/h / Fluidized bed boiler for burning coal and wood 150t/hPopelka, Ondřej January 2012 (has links)
This thesis is focused in calculation and designing of fluid bed boiler for burning coal and wood biomass in the form of wood chips. The uniqueness of fluidized bed boiler is circulating fluidized layer and cyclone ash separator from flue gases beyond the combustion chamber.Work was divided into several parts due to different parameters of the fuel.. Stoichiometry calculations, emissions calculations, enthalpy of combustion and flue gas desulphurization calculations are performed in various parts.Further, calculating of the losses of boiler and its efficiency comparing to the calculation and design of each heat transfer surfaces was also solved so that resulting size and quantity meet the required specifications.Drawn set of this designed boiler based on calculations is included in the annex to this paper.
|
205 |
Tepelný výpočet parního kotle / Thermal calculation of steam boilerRůžička, Tomáš January 2012 (has links)
The topic of this thesis is the thermal calculation of steam boiler with natural gas fuel. The first part is describing technical characteristic and parametres of the boiler. The main part of this thesis is the thermal calculation of the boiler. The following part deals with determination of steam amount and steam parametres for blowing through pipes of the boiler.
|
206 |
Návrh dvoutlakého horizontálního kotle na odpadní teplo za plynovou turbinu na zemní plyn / Draft dual pressure horizontal waste heat boiler for gas turbine on natural gasJurek, Roman January 2014 (has links)
This thesis deals with waste heat boiler for turbines burning natural gas. According to the given parameters of flue gas and vapor are carried out thermal balance and design of the boiler heating surfaces and calculated the dimensions and arrangement of heat transfer surfaces in the boiler followed by treatment with a drawing of the boiler.
|
207 |
Navrhněte roštový parní kotel na spalování dřeva a hnědého uhlí(poměr mísení 30/70-dřevo) / Steam boiler with grate firing burning mix coal and wood (mixing ratio 30/70-wood)Dvořák, Aleš January 2014 (has links)
This diploma work attends to presentation of steam grid boiler for wood and brown coal burning in scale (30/70-wood) in load 60t/h, with parametres of outgoing vapour p=7MPa, t=490°C. The work is splitted to several chapters. At the beginning I’m going to make stechiometric calculation and entalpic calculations of air and compustion gas. After that I’m going to calculate heat balance, losses of boiler and set heat efficiency of boiler. Then I’m going to suggest combustion chamber of boiler and make heat calculation. After suggestion of combustion chamber I’m going to set proportions of pulls and heat-delivery surface. In last chapter I’m giong to check heat balance. Inclosure of my work contains drawing documentation of steam boiler.
|
208 |
Srovnání možných způsobů zásobování rodinného domu energií / Comparison of energy sources for energy supply of residentialŠpatenka, Jindřich January 2014 (has links)
This diploma thesis deals with comparison of possible ways to supply the specific house by thermal energy. In the first part is a brief introduction of the building and determination of heat consumption. Following chapters are devoted to description and sorting of gas boilers, heat pumps, biomass boilers and solar collectors, inclusive the choice of specific source of heat. In the following part is stated economic evaluation of selected heat sources. Final part of the thesis is focused on design of additional exchanger instead of gas boiler.
|
209 |
Vytápění a chlazení RD s kombinovaným systémem dodávky tepelné a el. energie / Heating and cooling for residences with complex energy supply systemPavlíček, Michal January 2015 (has links)
Heating and cooling along with the indoor air quality is now discussed topic not only in the family houses. Goes hand in hand with reducing the energy consumption of buildings. This fact is edited by various laws or Regulations, no matter we discuss new buildings requirements, or for example energy label on older constructions.
|
210 |
Fluidní kotel CFB na spalování dřevní biomasy o parametrech páry 150 t/h; 9,3 MPa; 530 °C / Fluid boiler CFB for wood biomass combustion, setam paramters 150 t/h; 9,3 MPa; 530 °CMartinek, Jan January 2015 (has links)
This diploma thesis deals with the control calculation of fluid biomass boilers with circulating fluidized bed. The introduction briefly introduced fluidized bed boilers and explained what biomass is. Furthermore there is a stoichiometric calculation of combustion. The calculation of the losses and the efficiency of the boiler is following. Desulphurization is calculated briefly. The main part is devoted to the design and calculation of individual heat exchanging surfaces: superheater P1, superheaters 2 and 3, the wall superheater, the return chamber, hanging tubes, economizer and air heater. At the end is calculated total tolerance boiler. Work is completed with a diagram of temperature of working media and combustion.
|
Page generated in 0.053 seconds