• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 24
  • 11
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 40
  • 40
  • 24
  • 24
  • 14
  • 14
  • 13
  • 13
  • 13
  • 13
  • 12
  • 12
  • 12
  • 11
  • 11
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Vyhodnocení zatěžovacích zkoušek pilot z tryskové injektáže / Evaluation of loading test of jet-grouted piles

Čechová, Simona January 2021 (has links)
The master thesis consists of a theoretical part and a practical part. In the theoretical part jet-grouting technology is described briefly. Mechanical properties of jet-grouted piles were characterized. Various estimation methods of ultimate pile bearing capacity are described in this thesis – analytical calculation of ultimate bearing capacity for bored piles and estimation of ultimate pile bearing capacity by analysis of load-displacement curve defined by CHIN (1970; 1972). Load transfer method for piles and hyperbolic load-transfer curve are introduced. As a part of the load-trasfer method analysis, a method of estimating ultimate pile shaft friction called beta method is defined. In the practical part were evaluated several static load tests of jet-grouted piles and were constructed their load-displacemnt curves. Then reverse analysis of the results from static load tests was performed using load-transfer method. Then ultimate pile bearing capacity was estimated using analytical calculation of pile bearing capacity for bored piles and using analysis of load-displacement curve with method by CHIN (1970; 1972). By evaluation of load transfer method and beta method ultimate shaft resistence for each pile was estimated. Results and load-displacement curves were compared.
32

Kampus MU Brno (zelená etapa) - stavebně technologický projekt / Campus MU Brno (green stage) - construction technological project

Honzík, Roman January 2015 (has links)
The subject of this thesis is the solution of building technology project for the construction of the main processing stages University Campus Bohunice (green stage). It is a building consisting of nine pavilions which are mutually connected by two corridors. Corridors simultaneously combine green building stage with blue previous stage. All buildings are partial basement and three floors. Exceptions are SO IV-309, which consisted of four storeys with casing of an elliptic cylinder with a flat roof in the middle of the roof sheathing. In my thesis I deal specifically this very building object, which I discussed in terms of time, financial, technological progress bored piles and building equipment. Other portions are designed to project the whole building.
33

Příprava a organizace výstavby mostu na Silnici II/377 / Project planning and management of construction of the bridge on the road II / 377

Soukup, Ondřej January 2017 (has links)
The subject of this thesis the construction and technological preparation for the construction of the bridge ev.č. 377-007 across the Býkovka river in the municipality Rájec - Jestřebí, which is part of the reconstruction of a main road II / 377 Bořitov - Rájec. The thesis is elaborated a technical report on the structural and technological project, coordinating construction situation, the situation with wider relationships routes following the stages, time and financial plan – by objects, study the implementation of major technological stages of the building SO203 project site equipment, design of the main construction machines and mechanisms, the timetable of the main building structure, workers deployment plan, plan of machines usage, a plan for securing material resources for SO 203, technological regulation for the implementation of bored piles of, inspection and test plan for pilots, budget SO 203, sequence diagram construction, control and monitoring plan and calculation of bearing capacity of the bridge foundation piles.
34

Založení stavby ve složitých základových poměrech / Foundation of the building in complex geotechnical conditions

Blinková, Magdaléna January 2017 (has links)
The subject of this diploma thesis is the design of deep foundation highway bridge on D3 motorway in km 112.574, over Bošilecký stream and evaluation of geomorphological, geological and hydrogeological conditions and perform static calculation bridge foundation
35

Vybrané části stavebně technologického projektu administrativní a výrobní haly společnosti Hydraulics s.r.o. / Selected Parts of Building and Technological Project of Administrative and Manufacturing Hall Hydraulics s.r.o.

Kousal, Tomáš January 2017 (has links)
The master thesis deals with a conception and realization of a constructional and technological project of new manufacturing and administrative hall Hydraulics s.r.o. The thesis studies the realization of the major technological constructing stages of the building. It also covers projects of the construction site, the time schedule, the plan of the main building machines and mechanisms and the budget. Furthermore, the master thesis solves technological regulations for foundations made with bored piles, the budget according to THU including the check plan, the test plan and the safety plan. Also, the assessment of the construction composition is attached.
36

Stavebně technologický projekt výrobní haly s přístavbou v Poličce / Construction-technological project of production hall with extension in Polička

Holubář, Zdeněk Unknown Date (has links)
This diploma thesis is dealing with a construction-technological project of a production hall in Polička. The main subject of the thesis is a technological report, a realization study of the main technological phases, a coordination situation of the construction with broader relations to transport routes, a project of the office building site equipment, a suggested list of the main construction vehicles, a time plan for the main building object, technological prescriptions for a prefabricated skeleton and bored piles and documents related to this.
37

Stavebně technologický projekt podnikatelského inkubátoru / Constructive technological project of a business incubator

Sviták, Marek January 2018 (has links)
The content of the diploma thesis is the processing of a constructive technological project of a business incubator. The objective of this constructive technological project is to approach the construction process in the framework of the study of the implementation of the main technological stages, which closely follows the project of the site construction equipment with suitable layout of its construction, as well as the design of suitable machinery mechanisms for realization of the main building. Part of the project is also to determine the timeliness of work, financial and material management, and technological regulations for implement selected activities, taking into account the quality control and planning of their implementation. The whole construction process is completed in the final part of the diploma thesis on the solution of the occupational health and safety issues.
38

Stavebně technologický projekt Výzkumného centra Fakulty informačních technologií VUT v Brně / Construction technology project of Research centre Faculty of Information Technology in Brno

Chytková, Monika January 2013 (has links)
This Máster´s thesis deals with technological project of building a Research Center of Information Technologies VUT Brno in Brno. This work includes technical reports SY and STP, site equipment, budget, calculation, time planning, inspection and test plan, mechanical assembly, estimate,technological regulations, environmental plan, contract for work and job security for this building.
39

Stavebně technologický projekt výrobní a skladovací haly v Hodoníně / Architectural and technological project of manufacturing and warehouse hall in Hodonin

Šrámek, Pavel January 2016 (has links)
The object of this work is the solution of building technological project to build "Manufacturing and storage hall in Hodonin" including technological solutions with time and financial plan, technological regulations of selected activities, design of mechanical assemblies, inspection and test plans and choosing the appropriate method of implementing the piled foundations.
40

Stavebně technologická příprava dopravního terminálu v Peci pod Sněžkou / Construction and Technological Preparation of the Transport Terminal in Pec pod Sněžkou

Černý, Jiří January 2022 (has links)
The diploma thesis solves construction and technological preparation of the transport terminal in Pec pod Sněžkou. The content of the diploma thesis is a techical report on the construction technology project, the coordination situation, the time and financial schedule, the project of building site, selection of machines, time schedule for the main building object, plan for securing material resources for the main building of the transport terminal, technological prescription and inspection and test plan for monolithic ceiling structures. Another assignment part contains a plan for safety and health protection at work on the construction site and specialized topic is a noise study.

Page generated in 0.0462 seconds