• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • No language data
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Sensitivity of Resistivity Measurements on Concrete Bridge Decks to Operator-Controlled and Concrete Material Variables

Barrus, Natasha Christine 18 April 2012 (has links) (PDF)
The objectives of this research were to investigate the sensitivity of two-prong and fourprong resistivity measurements to certain operator-controlled variables and to conduct a direct comparison of the sensitivity of two-prong and four-prong resistivity measurements to certain concrete material variables. Four full-factorial experiments were designed for this research. In the experimentation on operator-controlled variables with two-prong resistivity testing, main effects that are both statistically significant and practically important include hole depth and surface water. In the experimentation on operator-controlled variables with four-prong resistivity testing, probe position, surface water, and prong spacing are all neither statistically significant nor practically important. This high degree of unexplained variation may be of concern to practitioners. In the experimentation on concrete material variables with two-prong and four-prong resistivity testing, main effects that are both statistically significant and practically important include chloride concentration and temperature, both of which exhibit inverse relationships with resistivity. These research findings support several important recommendations for resistivity testing. Operators of the two-prong resistivity device should use an accurately positioned drill stop to ensure that the prepared holes are consistently the correct depth, and they should expect to obtain different values depending on the presence of surface water on the deck surface. Operators considering use of the four-prong resistivity device should not expect the measurements to be sensitive to probe position with respect to rebar, presence of surface water, or prong spacing for conditions similar to those investigated in this research. Operators interested in monitoring resistivity values over time to ascertain material changes in a bridge deck should develop protocols for measuring concrete temperature in the field and subsequently normalizing resistivity measurements to a standard temperature.

Page generated in 0.0993 seconds