• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • 1
  • Tagged with
  • 6
  • 6
  • 4
  • 4
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Innovative Pre-cast Cantilever Constructed Bridge Concept

Visscher, Brent Tyler 30 July 2008 (has links)
Minimum impact construction for bridge building is a growing demand in modern urban environments. Pre-cast segmental construction is one solution that offers low-impact, economical, and aesthetically pleasing bridges. The standardization of pre-cast concrete sections and segments has facilitated an improved level of economy in pre-cast construction. Through the development of high performance materials such as high strength fibre-reinforced concrete (FRC), further economy in pre-cast segmental construction may be realized. The design of pre-cast bridges using high-strength FRC and external unbonded tendons for cantilever construction may provide an economical, low-impact alternative to overpass bridge design. This thesis investigates the feasibility and possible savings that can be realized for a single cell box girder bridge with thin concrete sections post-tensioned exclusively with external unbonded tendons in the longitudinal direction. A cantilever-constructed single cell box girder with a curtailed arrangement of external unbonded tendons is examined.
2

Innovative Pre-cast Cantilever Constructed Bridge Concept

Visscher, Brent Tyler 30 July 2008 (has links)
Minimum impact construction for bridge building is a growing demand in modern urban environments. Pre-cast segmental construction is one solution that offers low-impact, economical, and aesthetically pleasing bridges. The standardization of pre-cast concrete sections and segments has facilitated an improved level of economy in pre-cast construction. Through the development of high performance materials such as high strength fibre-reinforced concrete (FRC), further economy in pre-cast segmental construction may be realized. The design of pre-cast bridges using high-strength FRC and external unbonded tendons for cantilever construction may provide an economical, low-impact alternative to overpass bridge design. This thesis investigates the feasibility and possible savings that can be realized for a single cell box girder bridge with thin concrete sections post-tensioned exclusively with external unbonded tendons in the longitudinal direction. A cantilever-constructed single cell box girder with a curtailed arrangement of external unbonded tendons is examined.
3

Behaviour and Design of Extradosed Bridges

Mermigas, Konstantinos Kris 24 February 2009 (has links)
The purpose of this thesis is to provide insight into how different geometric parameters such as tower height, girder depth, and pier dimensions influence the structural behaviour, cost, and feasibility of an extradosed bridge. A study of 51 extradosed bridges shows the variability in proportions and use of extradosed bridges, and compares their material quantities and structural characteristics to girder and cable-stayed bridges. The strategies and factors that must be considered in the design of an extradosed bridge are discussed. Two cantilever constructed girder bridges, an extradosed bridge with stiff girder, and an extradosed bridge with stiff tower are designed for a three span bridge with central span of 140 m. The structural behaviour, materials utilisation, and costs of each bridge are compared. Providing stiffness either in the girder or in the piers of an extradosed bridge are both found to be effective stategies that lead to competitive designs.
4

Behaviour and Design of Extradosed Bridges

Mermigas, Konstantinos Kris 24 February 2009 (has links)
The purpose of this thesis is to provide insight into how different geometric parameters such as tower height, girder depth, and pier dimensions influence the structural behaviour, cost, and feasibility of an extradosed bridge. A study of 51 extradosed bridges shows the variability in proportions and use of extradosed bridges, and compares their material quantities and structural characteristics to girder and cable-stayed bridges. The strategies and factors that must be considered in the design of an extradosed bridge are discussed. Two cantilever constructed girder bridges, an extradosed bridge with stiff girder, and an extradosed bridge with stiff tower are designed for a three span bridge with central span of 140 m. The structural behaviour, materials utilisation, and costs of each bridge are compared. Providing stiffness either in the girder or in the piers of an extradosed bridge are both found to be effective stategies that lead to competitive designs.
5

Means and Methods Analysis of a Cast-In-Place Balanced Cantilever Segmental Bridge: The Wilson Creek Bridge Case Study

Lucko, Gunnar 11 March 1999 (has links)
Different means and methods exist in the construction industry to erect bridge superstructures. In planning and execution of the complex construction operations the effects of the chosen erection method need to be considered to achieve a safe and economical process. Failures of bridges under construction have underlined the importance of this issue. Hence, constructability issues need to be considered from the very beginning of projects. Structural analysis mathematically models geometry, boundary conditions, and other structural details, material properties, and so-called actions and incorporates factors of safety. Aforementioned actions, i.e. loads or restraints of deformations may act only temporarily during construction, depending on the method and sequence of erection. However, these construction loads can create considerable stresses in the unfinished structure prior to completion when it still lacks additional redundancy against failure. Furthermore, time-dependent material properties such as creep, shrinkage, and relaxation play a major role, especially in segmental construction. A case study is provided as an example of how constructability issues are dealt with in engineering practice. The Wilson Creek Bridge is a five-span cast-in-place concrete segmental bridge that was erected with Balanced Cantilever Construction. The bridge superstructure incorporated a camber to account for time-dependent deflections in final alignment. Form travelers were used in an alternating manner about the bridge piers to construct cantilever arms that were finally connected at midspan. These travelers remained in place until the box girder segments had reached sufficient strength to be post-tensioned to their predecessors. Casting cycle duration on this project was one week. / Master of Science
6

Most přes Lochkovské údolí / Bridge across the Lochkov Valley

Zvolánek, Lukáš January 2013 (has links)
The theme of the Master’s thesis is detailed design of superstructure for selected option of the bridge. The bridge carries highway across Lochkov valley. The superstructure, 6 spans, is made of one cell continuous box beam with large overhangs supported by prefabricated struts. The continuous beam is in plan curvature. As the first, side spans 1, 5, 6 will be casting on fixed scaffolding. Spans 2 and 4 will be casting using cantilever method, gradually hanging superstructure up. For the casting the main span will also be using cantilever method, gradually removing temporary hangers of adjacent spans. The structure was analysed according to limit states. The thesis also includes a time dependent analysis of the structure and solution of influence construction on its design.

Page generated in 0.138 seconds