Spelling suggestions: "subject:"cho"" "subject:"choc""
21 |
Vyvedení výkonu z rozvodny 110/22 kV Moravany u Brna / Feeding power out of 110/22 kV Moravany u Brna substationChromík, Aleš January 2013 (has links)
The aim of this Master’s thesis is the design and reconstruction of the high voltage distribution network for the company E. ON with focus on calculation of the stabilized operation and on the planning of new cable taps from the transformer substation Moravany u Brna. The first part of the theoretical analysis of the work deals with the inclusion of the distribution network into the power system and with principles of development and construction of high voltage networks. The second part includes a general calculation of stabilized operation of the power distribution network and a familiarization with the program PAS Off - Line Bison 4.0. The practical part of the thesis is focused on the calculation of the stabilized operation at the current state of transformer substation Moravany u Brna using the PAS Off - Line Bizon 4.0 V programme. This part also contains the design of six new cable lines which are needed to strengthen the power distribution in the southern part of the city Brno. The closing part of this chapter constitutes of a outdoor and indoor cable line renovation. These cables are connected to the transformer substation Moravany u Brna and a calculation of stabilized operation is also included in this part.
|
22 |
Výpočet ztrát v závislosti na konfiguraci distribuční sítě / Power Losses Calculation Depending on Distribution Network ConfigurationDomes, František January 2015 (has links)
This master‘s thesis deals with the calculation of losses depending on the configuration of the distribution network. The first part focuses on the general theory regarding some used calculation methods of steady operation. The next part is theoreticly dedicated to the technical losses, possibilities of their influencing and their calculation. In the practical part is carried out the choice of calculation method of steady operation. This method is implicated into the proposed program in programming environment MATLAB.Furthermore, on the basis of a partial measurement in the distribution network and using the proposed program are determined the sizes of offtakes of mesh network. For the existing mesh network is designed its radial operation. In the last part are calculated the losses of this network for both of these mentioned operations.
|
23 |
Analýza provozu mřížové sítě Brno – střed / Analysis of the operation of the lattice network Brno - středFrechová, Lucie January 2017 (has links)
The thesis shows the historical development of the South Moravian electricity system and the development of Brno´s network is discussed in more detail, especially the current form of the network from the outskirts of the city to its historical centre. The lattice network, as a subject of the analysis, is described in terms of the operation and reliability of the power supply. It also informs about the gradual development of the technology applied in the lattice network Brno-střed. The practical part performs the analysis of theoretical data and recorded data with respect to steady-state and faulty-state operation of the lattice network Brno-střed. The theoretical analysis is based on the simulation and calculation of the lattice network model in the software PAS DAISY Bizon and the monitored parameter is the transformers power load. In addition, the analysis of the real data includes the assessment of the difference average phase current values, as well as voltage, between the transformer phases. There is also the evaluation of the energy flow from the low voltage side to the high voltage side of the analysed network.
|
24 |
Jazykový obraz Chodů / Linguistic Picture of ChodsStrenková, Johana January 2021 (has links)
The aim of this work is to compile the linguistic picture of Chods, that is how the word is fixed in the language and the conceptual system of a native speaker. For this purpose, canonical literature has been chosen that thematizes Chods, furthermore some Chod newspapers, corpus syn2013pub and Jindřich's song-books and a few collections of Chod fairytales and legends representing folk literature. This thesis has also drawn upon systemic data, i. e. dictionaries wherein the word Chod can be found in order to record the denotations of this word. Next, the thesis explored the etymology of the word Chod and its synonyms, which also helps to clarify the objective of this work. All the data have been analysed and the connotations, collocations and also attittude towards the dennotation have been gathered that have been featured in more sources to compile the linguistic picture of Chods. Among the most frequent collocations and connotations confirmed in more than one source are Chodsko, border service, privileges and duties of Chods, Kozina and Lomikar, the uprising, Újezd, rebels, defenders against the Germans, nacionalism, freedom, a traditional costume, dialect, music, bagpipes, pies, Chod festival, ceramics, farmers, a banner, a dog, stubborness, repulsion, pride, distinctiveness, togetherness, hard...
|
25 |
Analýza možností realizace nové stanice 400/110kV jako náhrady za TR Tábor / The Analysis of the Possibility of Realization of a New Substation 400/110kV as a Substitute for TR TáborModlitba, Petr January 2017 (has links)
This thesis deals with the assessment of the location of the new transformer station 400/110 kV in terms of conditions in the 110 kV network, which will be supplied from this substation. The new 400/110 kV transformer station will replace the current transformer station 220/110 kV Tábor, which will be decommissioned in connection with the overall 220 kV system attenuation in the Czech power transmission system. On the basis of the load flow simulation of the 110 kV distribution network and calculations of the short-circuit conditions performed by simulation SW LUG two variants of the location of a new 400/110 kV transformer station were assessed. The 110 kV network calculations were focused on the evaluation of voltage conditions, the 110 kV lines loading in the standard operating scheme and in failure states according to the N-1 criterion, short-circuit conditions and losses. On the basis of the computational analyses, the technical measures necessary to ensure the reliable operation of the 110 kV network in the given area are designed and economically evaluated.
|
26 |
Návrh rekonstrukce části distribuční NN sítě včetně zpracování projektové dokumentace k provedení stavby / Design of reconstruction the part of the LV distribution network including make the creation of Detail Design DocumentationKubeša, Radek January 2019 (has links)
This master’s thesis deals with problems associated with the design of LV distribution networks. In the theoretical part there are described, legislative requirements for the designer of distribution networks, overwiev of standards in which the designer should have oriented and programs used in practice to create design documentation. In the next part there are given requirements for the detail design documentation. Practical part of master’s thesis is devoted to design of reconstruction of distribution network in the given part of village. Appraisal of existing a newly design distribution network was done by calculating of stady state in the BIZON program. In the last part there is listed design documentation for construction in range for the smooth implementation of the project.
|
27 |
Výpočet ustáleného chodu sítě 110 kV / Load Flow Solution of a 110kV NetworkTauš, Vladimír January 2008 (has links)
Content of this thesis is theoretic introduction to the steady state of network, theoretic analysis of methods, which serves for calculation of steady state of network such as Gauss Seidel iterative method or Newton Raphson modified method and economy in the energetics, concretely fixation of costs of the power line and calculation of the optimal time of building up the recuperative power line. This thesis includes calculation of steady state of requested network with normal trouble-free network and for criterion (n-1), their analysis and design of recuperative precaution.
|
28 |
Rozptýlená výroba a její vliv na distribuční síť / Dispersed production and its influence on distribution networkKácl, František January 2009 (has links)
The diploma thesis deals with dispersed generation (production). The small electric power sources are connected into distribution networks. Types and principles of the small electric power sources are studied. The legislation framework concerning renewable energy sources utilization is described. These power plants have impact into distribution networks and therefore techniques for the source connection to distribution network are included in the thesis. The impact of the specific small source of electricity must be studied.
|
29 |
Ustálený chod a zkratové poměry v síti 110 kV E.ON při paralelním provozu transformátorů T403 a T402 v transformovnách 400/110 kV Sokolnice a Otrokovice / Steady state and short-circuit conditions within E.ON 110kV power network at parallel operation of transformers T403 and T402 in 400/100kV transformer stations Sokolnice and OtrokoviceDoležal, Marek January 2014 (has links)
This master’s thesis is divided into two logical parts. The first part contains theory of calculation of steady state and short-circuits conditions within 110 kV distribution network. Newton’s method and short-circuit current calculation is also explained here. It also deals with classification and aftereffects of transient performance occurring in power networks. The second part contains practical calculation of steady flow and short-circuit conditions at parallel operation of transformers T403 and T402 in 400/110 kV transformer stations Sokolnice and Otrokovice. This calculation is done with program used by system operators called SINAUT Spectrum and consequently analyzed. This part also contains brief description of substations from this region.
|
30 |
Ustálený chod a zkratové poměry v síti 110 kV E.ON při můstkovém provozu transformátorů T402 a T403 v transformovně 400/110 kV Sokolnice / Steady state and short-circuit conditions within E.ON 110kV power network at bridge operation of transformers T402 and T403 in 400/100kV transformer station SokolniceBernát, Jan January 2014 (has links)
The master’s thesis deals with a calculation of steady state and short-circuit conditions in a 110 kV system during a bridge operation of transformers in a Sokolnice substation. The theoretical part of the thesis deals with a calculation of steady state of a system using Newton’s iterative method, it investigates short-circuits – their timing, distinctive values and a method of their calculation. In the practical part the 100 kV grid supplied from Sokolnice substation is described. The main goal of the thesis is a comparation of two basic wirings: bridge operation of T202 and T203 transformers (contemporarily in service) and bridge operation of T402 and T403 (in service after 2017). These two wirings were controlled even during one state of emergency during which the Sokolnice substation will be affected by an outage of one busbar. Voltage conditions, loading of power line and transformers and overall power balance were controlled. Short-circuit conditions were also calculated and short-circuit resistance of particular substations was inspected. In the conclusion technical measures needed to ensure smooth bridge operation of convertors T402 and T403.
|
Page generated in 0.0568 seconds