• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Determinação e remoção de erros em mapas de colheita de milho

Michelan, Ricardo 27 June 2005 (has links)
Made available in DSpace on 2017-07-10T19:25:05Z (GMT). No. of bitstreams: 1 Ricardo Michelan.pdf: 1556017 bytes, checksum: afb5e635f0be1f33237cf8c8081a3aa1 (MD5) Previous issue date: 2005-06-27 / The automation of the the monitorated harvest ends introducing systematic errors to the process, for this reason, a methodology of filtering of data became necessary for obtaining confident maps and it treats about the mean error factor, which is the delay time. The delay time is that spent between the cutting of the plant by the platform s bar and the passage of the grain by the sensor of productivity and humidity. For its determination, a data set will be analysed with 10 different delay time, from 0 to 27 seconds, in an interval of 3 seconds. The filtering begins by the determination of the time of stuffing and emptying that is the one which all the spaces and internal components of the combine are filled or deflated by the grains mass occurred in each input and output of the combine. In this process were eliminated 5,69% of the total points, being the process more efficient in the elimination of points, because it acts mainly in the plot s heads, where the most errors occurs. For the width error of platform were eliminated only 0,09% of the points of data. At the points having sign fails of GPS differential correction, in average 2,04% were eliminated. In the filtering of data, in average 2,27 % of the points were eliminated. In localization errors, all the points having until one meter of distance were removed, eliminating in average 0,14% of the data. At the end of the filtering process, the subsequent phase was the determination of the correct delay time for the variables humid productivity, humidity and elevation. As the delay time is directly linked with the combine speed inside the transport, areas with homogeneous speed were considerated. Each one of the 12 sub- areas from 10 data sets were submitted to the process of analysis of spatial dependence of the better semivariogram´s adjust. The trend more emphasized in the tabulation of the semivariogram parameters is the linearity of the nugget effect for the factor elevation, originating from own absence of the delay time of this data, since the elevation is passed joinly to the geodetic coordinates by DGPS, for the harvest monitor. The determination method of the delay time and the filtering process were satisfactory, meanly for humid productivity and humidity, despite of the high natural data variability. / A colheita monitorada é feita de vários processos, e nesses, podem ocorrer erros, por isso, uma metodologia de filtragem de dados torna-se necessária para obtenção de mapas confiáveis e ela gira em torno do principal fator de erro, que é o tempo de atraso. O tempo de atraso é aquele despendido entre o corte da planta na barra de corte da plataforma e a passagem do grão pelo sensor de produtividade e umidade. Para determinação destes erros, um conjunto de dados foi analisado com 10 tempos de atraso diferentes, sendo de zero a 27 segundos, com um intervalo de 3 segundos. A filtragem começa pela determinação do tempo de enchimento e esvaziamento, que é o tempo em que todos os espaços e componentes internos da colhedora são preenchidos, ou esvaziados, pela massa de grãos, ocorrida em cada entrada e saída da colhedora. Neste processo foram eliminados 5,69% dos pontos totais, sendo o processo que mais eliminou pontos, pois, atuou principalmente nas cabeceiras do talhão, onde ocorreu a maioria dos erros. Para o erro de largura de plataforma foram eliminados apenas 0,09% dos pontos de dados. Nos pontos com falha do sinal de correção diferencial do GPS, foram eliminados em média 2,04%. Na filtragem de dados de umidade, foram eliminados em média 2,27% dos pontos. Em erros de localização, foram removidos todos os pontos com até um metro de distância, eliminando em média 0,14% dos dados. Ao término do processo de filtragem, a etapa subseqüente foi à determinação do correto tempo de atraso para as variáveis produtividade úmida, umidade e altitude. Consideraram-se 12 zonas com velocidades de deslocamento homogêneas. Cada uma das 12 zonas dos 10 conjuntos de dados foram submetidas ao processo de análise de dependência espacial. O resultado mais marcante na analise espacial dos dados é a linearidade dos efeitos pepita para o fator elevação, proveniente da própria falta do tempo de atraso destes dados, já que a elevação é transmitida juntamente com as coordenadas geodésicas pelo DGPS, para o monitor de produtividade. O método de determinação dos tempos de atraso e o processo de filtragem foram satisfatórios, principalmente para produtividade úmida e umidade, apesar da alta variabilidade natural dos dados.
2

Determinação e remoção de erros em mapas de colheita de milho

Michelan, Ricardo 27 June 2005 (has links)
Made available in DSpace on 2017-05-12T14:48:27Z (GMT). No. of bitstreams: 1 Ricardo Michelan.pdf: 1556017 bytes, checksum: afb5e635f0be1f33237cf8c8081a3aa1 (MD5) Previous issue date: 2005-06-27 / The automation of the the monitorated harvest ends introducing systematic errors to the process, for this reason, a methodology of filtering of data became necessary for obtaining confident maps and it treats about the mean error factor, which is the delay time. The delay time is that spent between the cutting of the plant by the platform s bar and the passage of the grain by the sensor of productivity and humidity. For its determination, a data set will be analysed with 10 different delay time, from 0 to 27 seconds, in an interval of 3 seconds. The filtering begins by the determination of the time of stuffing and emptying that is the one which all the spaces and internal components of the combine are filled or deflated by the grains mass occurred in each input and output of the combine. In this process were eliminated 5,69% of the total points, being the process more efficient in the elimination of points, because it acts mainly in the plot s heads, where the most errors occurs. For the width error of platform were eliminated only 0,09% of the points of data. At the points having sign fails of GPS differential correction, in average 2,04% were eliminated. In the filtering of data, in average 2,27 % of the points were eliminated. In localization errors, all the points having until one meter of distance were removed, eliminating in average 0,14% of the data. At the end of the filtering process, the subsequent phase was the determination of the correct delay time for the variables humid productivity, humidity and elevation. As the delay time is directly linked with the combine speed inside the transport, areas with homogeneous speed were considerated. Each one of the 12 sub- areas from 10 data sets were submitted to the process of analysis of spatial dependence of the better semivariogram´s adjust. The trend more emphasized in the tabulation of the semivariogram parameters is the linearity of the nugget effect for the factor elevation, originating from own absence of the delay time of this data, since the elevation is passed joinly to the geodetic coordinates by DGPS, for the harvest monitor. The determination method of the delay time and the filtering process were satisfactory, meanly for humid productivity and humidity, despite of the high natural data variability. / A colheita monitorada é feita de vários processos, e nesses, podem ocorrer erros, por isso, uma metodologia de filtragem de dados torna-se necessária para obtenção de mapas confiáveis e ela gira em torno do principal fator de erro, que é o tempo de atraso. O tempo de atraso é aquele despendido entre o corte da planta na barra de corte da plataforma e a passagem do grão pelo sensor de produtividade e umidade. Para determinação destes erros, um conjunto de dados foi analisado com 10 tempos de atraso diferentes, sendo de zero a 27 segundos, com um intervalo de 3 segundos. A filtragem começa pela determinação do tempo de enchimento e esvaziamento, que é o tempo em que todos os espaços e componentes internos da colhedora são preenchidos, ou esvaziados, pela massa de grãos, ocorrida em cada entrada e saída da colhedora. Neste processo foram eliminados 5,69% dos pontos totais, sendo o processo que mais eliminou pontos, pois, atuou principalmente nas cabeceiras do talhão, onde ocorreu a maioria dos erros. Para o erro de largura de plataforma foram eliminados apenas 0,09% dos pontos de dados. Nos pontos com falha do sinal de correção diferencial do GPS, foram eliminados em média 2,04%. Na filtragem de dados de umidade, foram eliminados em média 2,27% dos pontos. Em erros de localização, foram removidos todos os pontos com até um metro de distância, eliminando em média 0,14% dos dados. Ao término do processo de filtragem, a etapa subseqüente foi à determinação do correto tempo de atraso para as variáveis produtividade úmida, umidade e altitude. Consideraram-se 12 zonas com velocidades de deslocamento homogêneas. Cada uma das 12 zonas dos 10 conjuntos de dados foram submetidas ao processo de análise de dependência espacial. O resultado mais marcante na analise espacial dos dados é a linearidade dos efeitos pepita para o fator elevação, proveniente da própria falta do tempo de atraso destes dados, já que a elevação é transmitida juntamente com as coordenadas geodésicas pelo DGPS, para o monitor de produtividade. O método de determinação dos tempos de atraso e o processo de filtragem foram satisfatórios, principalmente para produtividade úmida e umidade, apesar da alta variabilidade natural dos dados.

Page generated in 0.0883 seconds