71 |
Skladovací hala č. 2 v Rousínově - stavebně technologický projekt / Storage hall No. 2 in Rousínov - construction-technological projectGottvaldová, Denisa Unknown Date (has links)
The subject of my diploma thesis is a construction-technological solution for realization of a storage hall in Rousínov. The work deals with a time and financial plan for all buildings of the project Storage Hall, Rousínov. A technical report, a study of the implementation of the construction’s individual stages, a design and assessment of transport routes, a design of the construction site equipment and a design of the machinery were prepared for the building No. 2. An itemized budget with a statement of acreage and construction schedule was prepared. A technological regulation and a control and test plan were prepared for the implementation process of the wire-reinforced concrete industrial floor. Within the diploma thesis, a technological regulation for the implementation of a reinforced concrete retaining wall was prepared. Noise pollution caused by the construction site was examined and evaluated in a noise study. The environmental requirements for the storage hall building No. 2 were processed.
|
72 |
Horský hotel / Mountain hotelVandrovec, Aleš January 2014 (has links)
Master’s thesis theme is mountain hotel project. The hotel has one lower basement and four aboveground floor. It has trditional look and the roof is double-pitched. Floor projection looks like letter "L". Main part has measurements 25,3 x 14,1 m and it has four floor. Extension is on northwest side of main part. It has measuremnts 11,85 x 9,5 m and three floor. Facede of basement and first floor is from stone facing mansory. Facade od second floor of main patr of buildings id timbered looks like curb. Third and fourth floor are attic, gable is vertical timbered. Facade of second floor of extension is plaster on ETICS. The gable od extension is vertical timbered. Roof covering is alpen shingle from larch wood. Foundations of house are shallow. The construction system is walled. The lower basement is built from masonry BS Klatovy BD30 and other wall are from masonry Porotherm . Floor structures are from monolithic reinforced concrete, thickness 220 mm. House stairs are prefabricated double-flight. Partition wall are mostly built from mansory Porotherm 11,5 P+D. Lintols above windows and doors in facadeare made by reverse of floor slab and inside of disposition are made by ceramics lintols Porotherm. Floor structures are floating with impact insulation in whole house. In living rooms wear layers are from oak parquet block and in common rooms, toilets, bathrooms and technical rooms is ceramics paving. Wall’s surfaces are made from patent plaster and in lower basement are made from two-coat work with white coat. Toilets and bathrooms are tilled with ceramic tiles. All distributions of building equipment are covered with gypsum plasterboard ceiling. All windows and doors in facade are made by wooden profile Solid comfort SC78 and glazed by triple glazing unit (Uw,max=0,9 W/m2.K), exception is main entrance door, It is made by aluminum profile and it is automatically opened.
|
73 |
Hotel / HotelŘehoř, David January 2015 (has links)
The objective of this thesis is to draw up the design documentation for the construction of a hotel. The hotel is situated on the edge of the golf resort Kaskáda near to Jinačovice. It’s a brick building with two above – ground floors and one underground. There is the staircase in the building that creates protected escape route. The perimeter wall is designed of ceramic bricks Porotherm T Profi. They are filled – in by mineral wool. The hotel is divided into three dilatational parts. There are 35 guest rooms in the hotel; two of them are barrier – free, in total 63 beds. In the ground floor there are entrance, reception, restaurant, bar, kitchen with the background. In the basement there are technical equipment, a fitness room, a wellness, changing rooms, washrooms and a bar. The roof of the hotel is flat. There is the terrace accessible from the apartments in the second floor above the restaurant.
|
74 |
Stavebně technologický projekt výrobní haly v Hodějicích / Construction Project for Implementation of Industrial Hall in HodějiceKoudelková, Anna Unknown Date (has links)
The final thesis is focused on construction of the complex Milmar s.r.o. company, specifically, it focuses on the construction technology project of the SO02 Production Hall building. Diploma thesis detail solved through technological regulations prefabricated reinforced concrete skeleton construction of the hall and then implement concrete floors with infill. For the construction of the hall, an itemized budget was prepared with a statement of area, time schedule, health and safety plan, design of construction supply and assessment of transport routes, the main construction mechanisms were selected and variants of the main construction mechanisms, control and test plans were assessed. An accompanying and technical report, a construction technology study, and the sustainability certification of the LEED 2009 system were prepared for the entire construction. The text and drawing part was prepared according to the assignment of the diploma thesis.
|
75 |
Centrum vodního lyžování Soběslav / Center of water skiing SoběslavVeselý, Tomáš January 2017 (has links)
The thesis is focused of proposal and procesing of project documentation Center for waterskiing. The proposed object is located in the western part of the town Soběslav, in the locality aimed at sports activities. The building is created of facilities for summer sports, especially water skiing and wakeboarding. Further there will be built a playground for ball sports and track on roller skates. This is a three-storey no with a cellar object with a flat roof. The object is based on the foundation reinforced concrete pads a strips. The first floor is bricked of permanent formwork and partly of cast in place structure. The second and third floors is designed of clay blocks POROTHERM. This masonry is insulated with the aid of external contact thermal insulation. In the western part of the building is designed ventilated facade. The floor structures is designed from prestressed reinforced concrete panel SPIROLL and partly from reinforced concrete slabs. The object is divided into several operating units. They are the gym and its facilities, restaurant with kitchen, facilities for employees and the necessary storerooms, coffeehouse, shop with sporting equipment, rental equipment for water skiing and a dressing room serving the outdoor sports. The essential part of the second floor is comprised outdoor terrace. From this terrace is allowed entry to the coffeehouse, restaurants, shops and on the main staircase.
|
76 |
Sportovní centrum Polička / Sports centre PoličkaSvoboda, Jan January 2016 (has links)
This thesis deals with the design and elaboration process of a project documentation of a sports centre. The designed sports centre building is situated in the southern part of the town of Polička, in the area determined for sports and free time activities complexes and areas. It is a two-floor, non-cellar, flat-roof building. It is based on plain concrete strip foundations and reinforced concrete foundation footing. The bearing, peripheral and partition walls are designed from POROTHERM hollow clay blocks. Reinforced concrete columns are designated in open disposition areas. The ceiling construction is made from SPIROLL pre-stressed concrete floor slabs and point-supported reinforced concrete slabs. The peripheral walls of the first aboveground floor are insulated with external thermal insulation system with a protective gabion facade. The peripheral wall thermal insulation in a bowling restaurant and gym halls extension is designed from a ventilated facade with CEMBRIT METRO facade cladding panels. The building is functionally divided into two main parts with a shared entrance. The sports centre with gyms and other sports facilities form the first part. Three squash courts, a mini-football piste, a special room for spinning and alpinning, a room for group exercising and cloakrooms with sanitary facilities are designed within one part of the sports centre. A restaurant with a bowling area and a kitchen with storerooms and other facilities for employees form the second part. The designed complex is barrier-free. There is aimed to be a car park for fifty cars, four motorbikes and a bus in front of the building. Three parking places are for disabled people.
|
Page generated in 0.4305 seconds