• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 24
  • 3
  • 3
  • 1
  • Tagged with
  • 32
  • 21
  • 21
  • 20
  • 18
  • 17
  • 17
  • 17
  • 17
  • 17
  • 15
  • 15
  • 15
  • 14
  • 14
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Stavebně technologický projekt "Kampus Brno - Bohunice" / Construction Technological Project of "Campus Brno - Bohunice"

Marek, Miroslav January 2015 (has links)
The subject of the Diploma thesis is the technological project of the university campus in Brno - Bohunice. The work includes a complex study of the realizacion of the main technological steps in the construction of buildings UKB, namely the A25 and A36. There is the technical report, technology processes steel bearing system and monolithic reinforced concrete structures. Inspection and test plan for addressing regulations, timetable of works, machine draft report, and occupational health and safety plan
22

Příprava realizace bytového domu ve Dvoře Královém nad Labem / Preparation of realization apartment building in Dvůr Králové nad Labem

Možíš, Jan January 2016 (has links)
The subject of my diploma thesis is the construction-technological project of apartment house in Dvůr Králové nad Labem. Thesis is focused on the most optimal technological procedures of foundation construction on deep foundations and total external insulation by external thermal insulation composite system. Regulations are supplemented by inspectional and trial plans, appropriate machinery and equipment of assembly site. Included is also work safety, time schedule and budget of substruture. The most interesting thing of my thesis will be model of the noise load on the surrounding objects resulting from the construction of apartment house which will the proposed appropriate measures of noise control.
23

Kontrola provádění železobetonových konstrukcí / Inspection of the implementation of reinforced concrete structures

Juráň, David January 2022 (has links)
This diploma thesis deals with the control of the implementation of reinforced concrete structures. The theoretical part deals with the issues of this theme. There are presented individual work processes of the implementation of reinforced concrete structures, accesses of valid standards, used diagnostic methods and also inspection and test plans for cast-in-place reinforced concrete structure. The practical part is divided into three chapters. The first chapter applies with the most frequent defects in new reinforced concrete structures and two remaining chapters with the inspection of newly built structures for which arose misgivings about the quality of execution.
24

Výrobní hala v Černé Hoře - vybrané části stavebně technologického projektu / Production Hall in Černá Hora – Selected Parts of Construction-technological Project

Různar, Daniel Unknown Date (has links)
The topic of my master's thesis are selected parts of the construction technology project Production Hall in Černá Hora with administrative part. Thesis contains engineering report, construction budget, time schedule for the whole construction, deployment of mechanisms and staff, project of construction site, study of the implementation of the main technological stages, the most appropriate construction mechanisms, routes of mechanisms, ranges and travels of mechanisms, financial and time schedule of the main building, technological specification for established pilots and montages of prefabricated skeleton, control and test plan, implementation of pilots, proposals of design of movement mechanisms, comparison of cladding of ventilated facades, skeleton assembly procedure diagrams and noise study of the construction site.
25

Stavebně technologický projekt realizace novostavby výrobní haly pro automobilový průmysl / Construction Project for Implementation of Industrial Hall for Automotive Industry

Světlík, Jiří Unknown Date (has links)
This diploma thesis deals with construction technology project of a newly-built automotive industrial hall on the complex Hauk – Police nad Metují. The aim of the main construction object is to build a double aisle steel hall for industrial purposes including maisonette built-in which will become social and technical facility for prospective workers. The main construction facility is complemented by secondary structures, creating functional complex for required purposes. The thesis is focused on implementation of the main load-bearing prefabricated steel structure and cladding made of selected system. An integral part of the thesis include main technology phases realization study of the main construction object, a technological prescription filled-in with assembly drawings, a design of machine assembly including dealing with its transportation, a site equipment project, time schedules, a budget, a test and inspection plan and a security measures design for selected risks. The thesis is suplemented by a specialized section dealing with the heating of reinforced landscaping.
26

Stavebně technologický projekt haly ADS s.r.o. Větřkovice / Building Construction Project - Implementation of Production Hall ADS s.r.o. Větřkovice

Ráb, Jakub January 2019 (has links)
The subject of my master's thesis is construction technological project of the hall ADS s.r.o. Větřkovice. The work includes technical report of construction technological project, facilities of construction zone, solving traffic routes from the production to the place of construction, study of the implementation of the main technological stages of the building SO02, the most appropriate machine assembly, technological specification for drilled piles and for montage of prefabricated reinforced concrete skeleton, control and test plan, schedule of work, itemized budget, plan of the safety and health protection during work, proposals of design of movement mechanisms and time and financial discretion of realization of the reinforced areas of the production hall area.
27

Příprava realizace dostavby klinické hematologie FN Brno / Preparation of realization of completion of clinical hematology, University Hospital Brno

Průcha, Aleš January 2020 (has links)
The aim of this diploma thesis is a solution of the extension of clinical hematology of the Faculty Hospital Brno. The thesis deals with the technological regulation for steel construction, coupled ceiling concrete slab with other topics including an inspection-check plan, a time schedule for carcass, time and financial schedule for structures and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of site equipment and occupational safety and health risks. Finally this thesis contains several assessments for cranes, scheme of principles of fixing steel columns into structure, scheme of laying building envelope, LEED, site equipment financial assessment.
28

Stavebně technologický projekt přípravy a realizace Domova pro seniory Žacléř / Construction project for implementation of Retirement home Žacléř

Bonaventura, Pavel January 2022 (has links)
The aim of this diploma thesis is to prepare the construction of a Home for the Elderly in Žacléř. The work deals with technical regulations for the dismantling of asbestos roofing, demolition work and monolithic structures. For these regulations, a time plan for the implementation of monolithic structures, a control and test plan for monolithic structures, an itemized budget and a time and financial plan - object-oriented will be prepared. Furthermore, this work contains the coordination situation of the construction with broader transport relations, the design of the assembly machine, the report for the construction site equipment with drawings of the construction site equipment for individual technological regulations and last but not least the health and safety plan and assessment of construction noise. As part of the diploma thesis, several appendices were prepared for this stage, such as crane assessment, details of monolithic stair arms, noise wall scheme, budget for construction site equipment, environmental plan, ceiling and wall formwork scheme and staff balance for selected stages.
29

Stavebně technologický projekt výstavby administrativní budovy s garážemi / Construction technological project of construction of an administrative building with garages

Hrabovský, Lukáš January 2022 (has links)
The subject of this diploma thesis is the elaboration of a construction technological project for the construction of an administrative building with garages in Prague. The building is located in an enclosed area in the Prague-Veleslavín district. The main subject of this thesis is the elaboration of a technical report, a coordination situation of the construction with broader relations of transport routes, a time and financial plan of construction - object, a study of implementation of main technological stages of building, a project of the site equipment, a design of main construction machines and mechanisms, a time plan of main building, a plan of material resources, a technological regulation for the implementation of monolithic ceiling structures, a quality control and testing plan for monolithic ceiling structures. The diploma thesis also includes the calculation of construction according to THU, a occupational health and safety plan, concreting economics, a noise study, a selected points LEED certification and a budget with site equipment costs.
30

Realizace výstavby Hotelu Karpaty ve Valašských Kloboukách / Construction of the Hotel Karpaty in Valašské Klobouky

Šánek, Adam January 2022 (has links)
The subject of my diploma thesis is the solution of the construction of the Hotel Karpaty located near the town of Valašské Klobouky. The thesis contains an accompanying technical report, solution of transport routes, including traffic situation, time and financial plan of construction, study of implementation of main technological stages, construction site project with division into individual stages, drawing part and construction site report, design of main working machines and mechanisms, time hotel construction plan, plan for securing material resources, including budget and staff needs chart, technological regulation of monolithic ceiling structures, control and test plan for monolithic ceiling structures, design and installation of Schüco aluminum windows, design of construction measures Hotel Karpaty according to LEED standard.

Page generated in 0.071 seconds