• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 10
  • 8
  • 4
  • 2
  • 1
  • 1
  • Tagged with
  • 26
  • 6
  • 6
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Der Vertriebsvertrag (contractus aestimatorius) : seine Rechtsnatur und rechtliche Behandlung /

Altmann, Manfred. January 1934 (has links)
Thesis (doctoral)--Philipps-Universität zu Marburg.
2

Total Cost Analysis of Channel Flow: A Case of Consignment Store

洪國注, Hung,Mark Unknown Date (has links)
This is a case analysis according to the author’s working experience in P&G. This thesis focuses on the consignment stores in the market of home products. The author takes apart the channel functions into eight flows, and uses 4 types of transaction cost to discuss the relationship between manufacturers and retailers.
3

Über den Trod̈elvertrag und inbesonderere sein Verhältnis zur Verkaufskommission /

Arnold, Eduard. January 1896 (has links)
Thesis (doctoral)--Friedrich-Alexander-Universität Erlangen.
4

Controle de dose em transporte rodoviário de material radioativo / Dose control in road transport of radioactive material

Eduardo Gerulis 05 December 2013 (has links)
As doses de radiação ionizante para os trabalhadores no transporte de material radioativo devem ser tão pequenas quanto razoavelmente exequível. As doses médias dos motoristas e carregadores amostrados neste trabalho devem ser diminuídas. A demonstração do controle das doses em veículo rodoviário com material radioativo, requisitada pelo regulamento brasileiro atual, norma CNEN NE 5.01, é apresentada em formulário próprio com valores de exposição obtidos em posições de ocupação regular de indivíduos do público e de trabalhadores, mesmo quando se expede veículo sem a necessidade de uso exclusivo (∑ IT 50). Este trabalho mostra, por meio de pesquisa bibliográfica, elaboração de modelos e pesquisa de campo, que esta demonstração do controle com a obtenção dos valores de exposição nesta situação, para um método de controle melhor, deve ser realizada pela apresentação do registro do acúmulo de cargas, limitado (∑ IT 50), a fim de evitar a obtenção destas medidas, para que haja padronização com regulamentos estrangeiros e para que os custos e os tempos, importantes para expedição de radiofármacos com meia-vida curta, e também as atuais doses laborais dos técnicos de radioproteção sejam todos diminuídos. Os valores de exposição dos parâmetros utilizados com esse método são menores do que seus limites regulamentares. Para contribuir com essas finalidades devem ser apresentadas pelo regulamento brasileiro atualizado as distâncias de segregação entre as cargas e as cabines dos veículos. / The radiation doses to workers in the transport of radioactive material should be as low as reasonably achievable. The average doses of drivers and loaders, sampled in this thesis should be decreased. The demonstration of doses control in a road vehicle with radioactive material required by the current Brazilian regulation, CNEN NE 5.01 should be written in its own printed form with exposure values obtained in normally occupied positions from workers and members of the public, even when the consignment does not need \"exclusive use\" (∑ IT 50). Through bibliographic research, modeling and field research, this research work shows that this demonstration of the control should be done by writing the registration accumulation of load, limited (∑ IT 50), also in the own printed form. It is for a better control method, in order to avoid the use of measuring equipment, to build standardization with foreign regulations, to the current occupational doses of radioprotection technicians, the costs and time, (important for consignment with radiopharmaceuticals short half-life) would be all smaller. Exposure values of the parameters used with this method are smaller than regulatory limits. The segregation distances between loads and the cabins of vehicles shall be showed by Brazilian regulation updated to contribute to these aims.
5

Proces volby optimálního způsobu přepravy zásilek se společností TNT Express Worldwide CZ se zaměřením na Special Services / Process of choosing the optimal method of the shipping with TNT Express focusing on the Special Services department

Němcová, Adriana January 2011 (has links)
Diploma thesis deals the process of choosing the optimal method of the shipping with TNT Express. The theoretical part is devoted to definiton of the particular methods of transportation. The aim of the operative part is to highlight and solve the problem within the internal communication between salesmen and Special Services Agents.
6

Controle de dose em transporte rodoviário de material radioativo / Dose control in road transport of radioactive material

Gerulis, Eduardo 05 December 2013 (has links)
As doses de radiação ionizante para os trabalhadores no transporte de material radioativo devem ser tão pequenas quanto razoavelmente exequível. As doses médias dos motoristas e carregadores amostrados neste trabalho devem ser diminuídas. A demonstração do controle das doses em veículo rodoviário com material radioativo, requisitada pelo regulamento brasileiro atual, norma CNEN NE 5.01, é apresentada em formulário próprio com valores de exposição obtidos em posições de ocupação regular de indivíduos do público e de trabalhadores, mesmo quando se expede veículo sem a necessidade de uso exclusivo (∑ IT 50). Este trabalho mostra, por meio de pesquisa bibliográfica, elaboração de modelos e pesquisa de campo, que esta demonstração do controle com a obtenção dos valores de exposição nesta situação, para um método de controle melhor, deve ser realizada pela apresentação do registro do acúmulo de cargas, limitado (∑ IT 50), a fim de evitar a obtenção destas medidas, para que haja padronização com regulamentos estrangeiros e para que os custos e os tempos, importantes para expedição de radiofármacos com meia-vida curta, e também as atuais doses laborais dos técnicos de radioproteção sejam todos diminuídos. Os valores de exposição dos parâmetros utilizados com esse método são menores do que seus limites regulamentares. Para contribuir com essas finalidades devem ser apresentadas pelo regulamento brasileiro atualizado as distâncias de segregação entre as cargas e as cabines dos veículos. / The radiation doses to workers in the transport of radioactive material should be as low as reasonably achievable. The average doses of drivers and loaders, sampled in this thesis should be decreased. The demonstration of doses control in a road vehicle with radioactive material required by the current Brazilian regulation, CNEN NE 5.01 should be written in its own printed form with exposure values obtained in normally occupied positions from workers and members of the public, even when the consignment does not need \"exclusive use\" (∑ IT 50). Through bibliographic research, modeling and field research, this research work shows that this demonstration of the control should be done by writing the registration accumulation of load, limited (∑ IT 50), also in the own printed form. It is for a better control method, in order to avoid the use of measuring equipment, to build standardization with foreign regulations, to the current occupational doses of radioprotection technicians, the costs and time, (important for consignment with radiopharmaceuticals short half-life) would be all smaller. Exposure values of the parameters used with this method are smaller than regulatory limits. The segregation distances between loads and the cabins of vehicles shall be showed by Brazilian regulation updated to contribute to these aims.
7

Analysis of vendor managed consignment inventory systems

Ramrakhyani, Ravi Kumar. January 2009 (has links)
Thesis (M.S.)--State University of New York at Binghamton, Thomas J. Watson School of Engineering and Applied Science, Department of Systems Science and Industrial Enngineering, 2009. / Includes bibliographical references.
8

New Orleans Auction Galleries: An Internship Academic Report

Connors, Grace Elizabeth 01 December 2015 (has links)
This internship academic report is the result of a 480--‐hour internship at New Orleans Auction Galleries completed from February--‐September 2015. New Orleans Auction Galleries is a for--‐profit arts organization located in the Arts District of New Orleans, Louisiana. During my internship, I worked closely with the Art Department and Office Administration, as well as preview receptions andauctions. This experience provided me with a valuable education of the inner workings of New Orleans Auction Galleries from its day--‐to--‐day operations to its vision as an organization. His report begins with the history and goals of New Orleans Auction Galleries and moves forward with discussing the structure of the organization as it stands today, a SWOT analysis, best practices, recommendations, and concludes with my final thoughts.
9

Factors that may obstruct proper project management functioning at the Epping branch, Cape Town, of African Oxygen Limited (Afrox)

Brand, Sharon Lee 03 1900 (has links)
Thesis (MBA (Business Management))--Stellenbosch University, 2008. / ENGLISH ABSTRACT: This research study report takes place in a business setting, namely the new system implementation for consignment distributors supplied by the Epping branch of Afrox. Various signs of problems within the management of this project were observed, and this has led to research into those factors that may be obstructing proper project management at Epping, Afrox. The aim of the study is to gain understanding of these factors and to provide recommendations to the decision-makers in the organization. The author draws on a stream of research in order to identify those factors that in theory inhibit proper project management. Fourteen factors were identified, namely, business strategy; performance management system; communication; continuous improvement; customer focus; leadership; monitoring, control and measurement; motivation; organizational behaviour; risks; resources; skills; specifications and teamwork. These factors form the basis for the development of a structured questionnaire, and responses were received from a sample of employees in various departments at the Epping branch. The numeric data from the responses was analyzed through the descriptive statistical technique of describing the population proportion. The findings from the empirical study reveal that none of the factors identified and tested to be statically significant in obstructing proper project management. The overwhelming success of engineering projects and other information technology projects may have influenced the results. However, pressures may exist in the project management areas of performance management, continuous improvement, organizational behaviour and skills, as these factors received the least favourable responses from the sample group. It is concluded that opportunities exist, based on this primary research study, for further and more in-depth research. Recommendations are made to repeat the study by delimiting the population to only those employees assigned to and stakeholders affected by the consignment distributor new system roll out. Alternatively, a recommendation is made to conduct further research into those areas that may be under pressure in project management by means of personal interviews or through a second empirical survey focused on performance management, continuous improvement, organizational behaviour and skills. / AFRIKAANSE OPSOMMING: Hierdie studieverslag het betrekking op ’n sake-omgewing, te wete die nuwe stelselimplementering vir vragverspreiders soos verskaf deur Afrox se Epping-tak. Daar is talle tekens waargeneem van probleme met die bestuur van hierdie projek, wat gelei het tot ’n ondersoek na die faktore wat behoorlike projekbestuur by Afrox se Epping-tak moontlik kniehalter. Die doel van die navorsing is om hierdie faktore te ondersoek en om voorstelle vir oplossings te doen aan die besluitnemers binne die organisasie. Die outeur maak gebruik van ’n stroom navorsing ter identifisering van daardie faktore wat behoorlike projekbestuur teoreties inhibeer. Veertien faktore is geïdentifiseer, te wete: sakestrategie; prestasiebestuurstelsel; kommunikasie; voortdurende vordering; klantefokus; leierskap; monitering, beheer en meting; motivering; organisatoriese gedrag; risiko’s; hulpbronne; vaardighede; spesifikasies; en spanwerk. Hierdie faktore vorm die basis van die ontwikkeling van ’n gestruktureerde vraelys, en antwoorde is verkry van ’n toetsgroep van werknemers in verskeie afdelings by die Epping-tak. Die numeriese data van die response is ontleed met behulp van die deskriptiewe statistiese tegniek van beskrywing van die toetsbevolking. Die bevindings van die empiriese studie toon dat geeneen van die geïdentifiseerde en getoetste faktore statisties betekenisvol is in die belemmering van behoorlike projekbestuur nie. Die oorweldigende sukses van ingenieursprojekte en ander inligtingstegnologieprojekte kon dalk die uitslae beïnvloed het. Nietemin, daar mag dalk drukpunte bestaan in die projekbestuursareas van prestasiebestuur, voortdurende vordering, organisatoriese gedrag en vaardighede – siende dat hierdie faktore die mins gunstige respons by die toetsgroep ontlok het. Die gevolgtrekking, gebaseer op hierdie inleidende navorsingstudie, is dat daar geleentheid bestaan vir verdere en meer deurtastende navorsing. Dit is aan te bevele dat die studie herhaal word deur die toetsbevolking te beperk tot slegs daardie werknemers en belanghouers wat deur die nuwe vragverspreidingstelsel se inwerkingstelling geraak word. As alternatief word die voorstel gedoen dat verdere navorsing oor daardie areas van projekbestuur wat moontlik druk ervaar deur middel van persoonlike onderhoude gedoen word, of deur ’n tweede empiriese opname wat gefokus is op prestasiebestuur, voortdurende vordering, organisatoriese gedrag en vaardighede.
10

THREE ESSAYS ON VENDOR MANAGED INVENTORY IN SUPPLY CHAINS

Gumus, Mehmet January 2006 (has links)
Vendor Managed Inventory (VMI), Consignment Inventory (CI) and a combination of both (C&VMI) are supply-chain sourcing agreements between a vendor and customer. VMI allows the vendor to initiate orders on behalf of the customer. In CI, the customer pays for the goods supplied by the vendor only upon use. The vendor under C&VMI decides customer-replenishments, and owns the goods replenished until they are deployed by the customer. Our thesis studies these agreements in three essays. <br /><br /> The first essay considers a vendor <em>V</em> that manufactures a particular product at a unique location. That item is sold to a single retailer, the customer <em>C</em>. Three cases are treated in detail: Independent decision making (no agreement between the parties); VMI, whereby the supplier <em>V</em> initiates orders on behalf of <em>C</em>; and Central decision making (both Vendor and Customer are controlled by the same corporate entity). <br /><br /> Values of some cost parameters may vary between the three cases, and each case may cause a different actor to be responsible for particular expenses. Under a constant demand rate, optimal solutions are obtained analytically for the customer's order quantity, the vendor's production quantity, hence the parties' individual and total costs in the three cases. Inequalities are obtained to delineate those situations in which VMI is beneficial. <br /><br /> The problem setting in the second essay is the same with that of Essay 1, but the sourcing agreements investigated are now CI and C&VMI. In CI, as in the usual independent-sourcing approach, the customer has authority over the timing and quantity of replenishments. CI seems to favour the customer because, in addition, he pays for the goods only upon use. Under a C&VMI agreement, the vendor still owns the goods at the customer's premises, but at least can determine how much to store there. <br /><br /> The second essay thus contrasts the cases CI and C&VMI, and compares each of them to a no-agreement case. General conditions under which those cases create benefits for the vendor, the customer and the whole chain are determined. <br /><br /> Essay 3 investigates VMI and C&VMI separately for a vendor and multiple customers who face time-varying, but deterministic demand for a single product. In any of those agreements, the vendor seeks the best set of customers to achieve economies of scale. MIP models are developed to find that set of customers, and to determine the vendor's optimal production, transportation, and customer-replenishment quantities. The model for VMI is solved using a heuristic that produces two sub-models, and uses hierarchical solution approach for production, customer-replenishment and transportation decisions. C&VMI model is solved using Lagrangian relaxation. Various numerical examples are used to test the solution approaches used. <br /><br /> In the mean time, the customers can guarantee to be no worse off under VMI or C&VMI than the no-agreement case by setting the right levels of maximum inventory. A model to determine those levels and a solution algorithm are also proposed in Essay 3. <br /><br /> The first two essays can help a vendor or customer in a supply chain to determine the least costly sourcing option, which depends on the relative values of various cost parameters. A vendor with multiple customers can make use of the results in the third essay, which reveal the best possible economies of scale under VMI or C&VMI. Those customers can guarantee to be no worse of than traditional sourcing when they set the proposed levels of maximum inventory.

Page generated in 0.0828 seconds