Spelling suggestions: "subject:"construccion"" "subject:"construccions""
1 |
An Integrated Simulation-based Planning Approach for Construction ProjectsHong, Jangmi Unknown Date
No description available.
|
2 |
從格式概念的角度檢視把/被…得字句結果語意的呈現 / BA/BEI…DE Constructions as a Family of Resultative Constructions:A Constructional-Conceptual Perspective馮美齡 Unknown Date (has links)
單獨的「把」或「被」字本身並沒有言明「使動」語意,但是一旦加上「得」結果補語,就會帶出「使動結果」語意;是故,我們認為「把/被…得」字句是「結果格式」(resultative construction)。本文以「格式語法」(Construction Grammar)的觀點為基礎,分析「把/被…得」字句。本文提出在「把/被…得」字句出現的動詞不侷限於「處置式」動詞 (disposal verbs);「使動結果」語意是格式和動詞之語意互動的結果。另外,本文也提出「把…得」字句和「被…得」字句均屬於「結果格式」的家族成員,因為這兩個字句包含許多共同的語意特性;例如,兩個字句都包含兩個小事件 (subevent),一個是動詞事件 (verbal subevent),另一個則是格式事件 (constructional subevent),而動詞事件是促使格式事件發生的媒介 (means)。又格式事件通常決定了「把/被…得」字句整句的時態。最後,本文再透過Jackendoff的概念結構 (conceptual structure),將「把/被…得」字句予以分解成更細部的語意單位,藉此更進一步了解「把/被…得」字句語意的構成。 / The use of ba/bei alone does not imply causative meanings; however, when a de result complement is added to ba/bei constructions, the causative sense will arise concomitantly with resultivity. Therefore, ba/bei…de in the sentences, two discontinous morphemes locking together, mark the whole construction as a resultative construction.
By adopting constructional approaches, we show that ba/bei…de resultatives are not limited to disposal verbs and they are made of a family of resultative constructions. Without the inherent disposal property and the causative meaning, stative, perception, and psychological verbs are still compatible with ba/bei…de resultatives. The causative-resultative meaning comes from the integration among all the components of the construction, both structurally and semantically. Also, under such a constructional approach, we will find that many semantic properties of ba/bei…de resultatives can be predicted from their meaning structures: a resultative sentence contains a constructional subevent and a verbal subevent, and this verbal subevent serves as the means by which the constructional subevent takes place. As for their temporal relation, the verbal subevent may be cotemporal with the constructional subevent, or may overlap with it, or may entirely precede it, depending on the pragmatics of the situation. And the end-boundedness of the constructional subevent correlates with the telicity of a resultative construction.
And with some modifications of Jackendoff’s conceptual structure, we discern how a resultative concept is characterized in the human mental representation. In terms of a set of primitives, we can easily detect that ba/bei…de constructions are made of two separable subevents, and that the verbal subevent is temporally prior to the constructional subevent.
|
3 |
Řízení podniku speciálních stavebních prací v současné hospodářské situaci / Management of Company focused on special Construction works in curent economic situationŠumichrastová, Ivana January 2016 (has links)
The aim of the work is an analysis of recent and present economic situation and also situation in construction in Slovak Republic. It deals with the economy of a particular company, which specialises in the field of construction works, in the context of outside and inside influences. A more detailed examination relies on the results of a financial analysis. The aim of the thesis is to find out what impact these events have on a specific company and to suggest solutions that would contribute to its resilience to its competition or to help overcome the next potential crisis.
|
4 |
Polyfunkční objekt VEKTOR v Pardubicích, příprava realizace stavby / Polyfunctional Building VEKTOR in Pardubice, Preparation for Building RealizationVančura, Jaroslav January 2018 (has links)
The subject of the diploma thesis is construction technology project of polyfunctional building VEKTOR in Pardubice. Building object has seven overground floors and has not basement. The construction system of the building is a monolithic skeleton consisting of columns and a ceiling slab. Part of the thesis includes technical reports, construction technology study, situation with wider transport route relationships, the project of the construcion zone equipment, suggestion of machines and mechanisms, plan for securing material resources, technological regulation for monolithic constructions, control and test plan for monolithic constructions, item budget, time schedule, chronological and financial plan of the building – object.
|
Page generated in 0.08 seconds