• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 8
  • 1
  • 1
  • 1
  • Tagged with
  • 12
  • 12
  • 8
  • 7
  • 6
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Příprava a řízení stavební zakázky z pohledu investora / Construction Order Preparation and Management from Aspect of Investor

Fialová, Jana January 2019 (has links)
The aim of this diploma thesis is a construction order preparation and management from aspect of investor. The diploma thesis is divided on the theoretical and practical part. The theoretical part contains information about life cycle of the project, the legislative environment, financing and about contractual relations between projects. In the practical part, these theoretical knowledge are subsequently are applied to a particular public contract where the investor is the town of Mohelnice. A target of this diploma thesis is to describe and analyze the entire course of the implementation of the public construction contract from preparation to completion and putting into operation.
12

Polyfunkční dům Brno - Štýřice - stavebně technologický projekt / The multi-functional centre Brno - Štýřice - construction technological project

Kocian, Ondřej January 2014 (has links)
The final thesis deals with structural and technological background for the construction of multi-functional building in Brno-Štýřice. The aim is the optimal design of contruction progress and necessary resources. This thesis contains construction-technological report, technological instruction, construction site layout, machinery and lifting configuration, design of transport and supply routes, safety work organization, measures to protect environment, building costs, time schedule and inspectional-test plan.

Page generated in 0.1235 seconds