Spelling suggestions: "subject:"dřevěné"" "subject:"dřevěná""
61 |
Sportovní centrum / Sports centerNováková, Kateřina January 2019 (has links)
The subject of my master´s thesis is a project of a new sports center in Havlíčkův Brod in Humpolecká street on plot no. 2709/3 and 2709/4. The land is sloping and its area is 14 849 square meters. The building has two overground floors and one underground floor. Vertical bearing constructions are designed from the monolitic ferroconcrete columns. Space between colmuns is made up of ceramic blocks. In the underground floor the space is made up of monolitic reinforced concrete. The vertical peripheral structures are provided with an insulation system with ventilated space. The horizontal bearing structures are designed as a monolitic reinforced concrete slabs. The roof is designed single – layer vegetation area. The roof over sports hall is sloping made up of wooden trusses. In south-eastern side of sports centre is designed restaurant with its technical background. In the underground floor there is relaxation part with swimming pool, saunas and massages. The rest of sports center is made up of technical and hygienic background for visitors and employees, and sports grounds, for example badminton courts, climbing wall, squash courts, fitness and 4 sports rooms.
|
62 |
Novostavba hotelu Velichovky / The Hotel VelichovkyKužela, Jan January 2019 (has links)
This diploma’s dissertation is on project of a new hotel building with three aboveground and one underground floors. This study starts at the building stage and focuses on the construction details and energy demands of the building. Also included is a fire safety solution for the new hotel building. The layout and architectural desing is according to the investor´s requirements, with respect to applicable laws, regulations, standards. Traditional materials are designed for the new building, taking into account the latest developments in the construction industry.
|
63 |
Sportovně - rekreační centrum Vsetín, Ohrada / Sports and Relaxation Centre Vsetín, OhradaNémeth, Ondřej January 2019 (has links)
The design of the sports and recreation center in Vsetín solves the complete revitalization of the unused territory on the periphery of the town in the Ohrada district. The aim of the project is to revive the poorly accessible and neglected area and its use not only for a wide range of sports activities, but also for leisure activities and recreation. The whole area should be freely accessible and open to a wide range of public. Four main buildings are designed in the complex: a multi-purpose sports hall, a hotel, a tennis club and a snack bar with a bicycle service. There is a football field, a basketball court and a small football pitch on the open spaces between these objects, as well as two climbing walls, an outdoor gym and a parkour area with many obstacles. The rest of the areas are pavements and free grass areas intended for leisure and recreation of visitors.
|
64 |
Sportovní centrum v Hodoníně / Sports Centre in HodonínChlebíková, Monika January 2013 (has links)
This is a proposal of a detached building sports center with squash courts and a café. The building's basement, with two floors. Ground plan of the building is composed of two rectangles. The second floor is only over part of the building. Above the squash courts is a roof of wooden trusses and load-bearing part of the skeletal system consists of brick walls. The structural system of the building is brick system Porotherm, ceilings Spiroll. The building is covered single layer flat roof, and has a ventilated facade.
|
65 |
Centrum integrovaného záchranného systému / Centre of Integrated Safety SystemSoukup, Ondřej January 2013 (has links)
It is a new Centre of the Integrated Rescue System to p No. 375/2 in the cadastral Sand 720755th The project documentation is conducted only for the fire station. that consists of three dilated from buildings. Building for day stay is three-storey, two-storey garage with workshops and drying storey tower. Brick construction system based on the footings. Horizontal structure prestressed panels are at SPIROLL. The roof is flat, single-layer and desk hunter cased. Concrete floors are connected by a staircase in the building for day stay and welded steel in the drying tower.
|
66 |
Klinika celostní medicíny / Clinic of Holistic MedicineHavlíček, Vilém January 2013 (has links)
A master thesis „Clinic of holistic medicine“ is processed as a project documentation. The building is projected for the plat no.170/1 in Kladruby u Vlašimy (Benešov district). Is a three-storyed wooden building from large-format wooden panels. Ceilings are ribbed constructions from spruce wood. Stairspaces are made of reinforced concrete. The house is roofed with a saddle roof made by woodentrusses. Stairspaces and machine room of air conditioning are roofed with a one-sheat flat roof. The project is planned as an extension of the Rehabilitation institute complex in Kladruby.
|
67 |
Víceúčelová sportovní hala / Multifunction sports hallNacházel, Jakub January 2014 (has links)
This master’s thesis deals with the design documentation multifunction sports hall. The building is situated in the region in the Vysočina village Humpolec, cadastral district Humpolec. The building is designed as a prefabricated skeleton, where the vertical load-bearing structures are designed from the prefabricated skeleton of PREFA BRNO and filling and partition walls of the structural system POROTHERM and BTB fittings. Horizontal structures are formed by the supporting elements prefabricated skeleton system of PREFA BRNO and ceiling panels SPIROLL. The main single-storey multifunction hall is roofed with wooden trusses of curved from glued laminated timber and purlins carrying roof deck. The other part of the building is covered with flat single-ply roofs. The building is divided into a main single-storey multifunction sports hall and an outbuilding with facilities for athletes and spectators about two floors above ground and a third technical floor. The building is solved as barrier-free.
|
68 |
Dům krátké cesty v Brně / 5-Minutes NeighbourhoodArab, Albara January 2014 (has links)
The topic of my thesis is an architectural study of a multifunctional residental building located at Svitava river bank which is surrounded by streets named Masna, Krenova and Hladikova. The objective of the study is to design a building that would utilize the space effectively and restore its function. As a result of the study, my project is divided into three compounds with the inner being a semi-public space, linked to its sruroundings by many passages and two main boulevards. The three combounds are composed of one administration block which is four storeys and the other two compounds are five storeys high, with the ground and first floors being different facilities e.g. kindergarden, restaurant, bank ,café, clinics, library, gallery, shops and a senior center. From the third to the fifth floor there are designated housing apartments comprising of small economic flats. The building has a two-floor basement, with a supermarket, technical facilities and parking. The construction of the building is from monolithic reinforced concrete frame, with the horizontal structure composed of beamless slabs. The facade is designed by using a combination of two materials i.e. white plaster and timber cladding as horizontal panels.
|
69 |
Stavebně technologický projekt administrativní budovy ve Zlíně-Lukové / Construction technological project of administration building in Zlín-LukováVyoral, Martin January 2015 (has links)
In this thesis is solved by building technological project of an office building in Zlin Januška Compressors - Lukov focusing on selected technological stage. Namely, the implementation of large wooden roof trusses and performing thermal insulation composite system. For these technological steps are processing all documents that are necessary for their implementation. It's technical report on construction technology project, time and financial plan of the building, study the implementation of major technological stages of the main building structure, design of the main building mechanisms, the project site equipment with appropriate drawings and calculations of the costs of site, technical regulations implementing the activities related to monitoring and test plans.
|
70 |
Sidlo stavební firmy / Head Office building companyMalý, Jiří January 2015 (has links)
This thesis processes project documentation for headquarters of construction company. Main purpose of building is to facilitate administrative nd manufacturing needs of the company. Building contains of reception, offices, meeting room, restrooms and lock rooms for employees, elevator and workshops. There is underground garage in the basement. Building is going to be situated in Stritez u Policky. Building takes up 1088m2 of land. Vertical structures are mainlymade of concrete and brick blocks. Horizontal structures are made of reinforced concrete panels, roof structure is made of wooden trusses.
|
Page generated in 0.038 seconds