Spelling suggestions: "subject:"rocks"" "subject:"locks""
11 |
Vehicle Routing Problem In Cross Dockswith Shift-based Time Constraints On ProductsKocak, Menekse 01 December 2011 (has links) (PDF)
In this study, the capacitated vehicle routing problem with shift based time
constraints is taken into consideration. The study stemmed from an application
in a cross dock. The considered cross dock is assumed to feed directly the
production lines of its customer. The customer has a just-in-time production
system that requires producing only in necessary quantities at the necessary
times. This necessitates the arrival of the parts/products collected from
different suppliers at the customer at the beginning of each shift of production.
The shift times constitute deadlines for the products to be collected from the
suppliers and used in each shift. The collection problem then can be seen as the
capacitated vehicle routing problem with shift based time constraints. The
objective of the collection problem is to minimize the routing costs. For the
accomplishment of this objective it is required to decide on products of which
shift(s) should be taken from a supplier when a vehicle arrives at that supplier.
For the solution of the problem a mathematical model is formulated. Since the
dealt problem is NP-Hard, meta-heuristic solution approaches based on
variable neighborhood search and simulated annealing are proposed.
Computational experimentation is conducted on the test problems which are
tailored from the capacitated vehicle routing instances from the literature.
|
12 |
Laivo statymo, remonto ar įrengimo arba mokesčių ir rinkliavų už naudojimąsi dokais kaip jūrinio reikalavimo užtikrinimo jūrinio laivo areštu ypatumai / The particularities of the arest of the sea- going ship as the security for the maritime claim arising of construction, repair or equipment of any ship or dock charges and dutiesDigrys, Andrius 15 March 2006 (has links)
This thesis deals particular with the particularities of the maritime claims arising of the construction, repair or equipment of any ship or dock charges and dues and the particularities of the arrest of ship for these maritime claims in the Republic of Lithuania.
|
Page generated in 0.0435 seconds