Spelling suggestions: "subject:"drilled files"" "subject:"drilled miles""
11 |
Skladovací hala ve Znojmě - stavebně technologický projekt / CONSTRUCTION-TECHNOLOGICAL PROJECT OF STORAGE HALL IN ZNOJMOHolubová, Jolana January 2014 (has links)
The diploma‘s thesis solves the realization of the storage hall and the other building operations. There are detailed follow up the technological rules for demolition work, special foundation – drilled piles and assembling of steel construction. The project includes the project of the construction site facilities, machine set, budget, quality of the implementation, time plan and safety.
|
12 |
Vybrané části stavebně technologického projektu - Bytový dům Novostrašnická / The selected parts of construction technology project - Apartment building NovostrašnickáVěrný, Roman January 2016 (has links)
This thesis is focused on selected parts of building technological project of apartment house Novostrašnická in Prague. The project contained technical report, coordinating situation with distinguished traffic routes, object-oriented time and financial plan, study of essential technological phases, report of building equipment and drawing of building equipment for different phases, the design of mechanical arrangement, the work schedule for fabric, plan for securing material resources, technological prescript and control trial plan for drilled piles, budget and design of lifting mechanisms.
|
13 |
Rezidence Ponavia Brno, stavebně technologická příprava stavby / Residence Ponavia Brno, Civil technical projectVeselá, Šárka January 2017 (has links)
The diploma thesis deals with construction technological project of a flat house Residence Ponavia. The thesis contains time and financial plan, itemized budget of main object, technical report, site equipment, safety and healt care policy and machine assembly. The thesis focuses on building foundation and bottom floor. Thesis includes technological prescription and control and test plan for mentioned constructional phases.
|
14 |
STK pro nákladní vozidla Olomouc - Holice - příprava a organizace výstavby objektu / Technical Inspection Station for trucks Olomouc - Holice - preparation and organization of construction buildingProcházka, Jan January 2012 (has links)
The master’s thesis goal is construction-technological project of the "Technical inspection station for trucks" in the city of Olomouc. The goal is rationaly propose preparation and organization of the main building construction. The thesis includes design of site equipment, budget, schedule, main construction machines, construction stages, cash-flow assessment and technological prescription for bored piles.
|
15 |
Stavebně technologický projekt bytového domu v Ohrazenicích / CONSTRUCTION TECHNOLOGICAL PROJECT OF APARTMENT BUILDING IN OHRAZENICEZdražil, Luboš Unknown Date (has links)
The master´s thesis describes the realization of new apartment building in Ohrazenice. The thesis contains a technical report of the construction-technical project, studies of relatization of the main technological stages and report of the building equipment. I designed the main construction machines and mechanisms. An optimized budget with a bill of quantitiesand detailed construction schedule and a graph of staff needs is prepared for the SO01 building. The thesis also deals with technology of drilled piles and prepared a technological regulativ, schedule of occupational health and safety and a control and test plan.
|
16 |
Stavebně technologický projekt přístavby objektu Nejvyššího soudu ČR v Brně / Construction technology project of extension of the Supreme Court building in BrnoConík, Šimon Unknown Date (has links)
Theme of the diploma thesis is a construction technology project extension of the building of the Supreme Court of the Czech Republic in Brno. The content of the diploma thesis is the study of the main technological stages of the main building, solution of wider transport relations with a focus on building supply, objects schedule, time schedule of the main building. The work also includes the project of construction site equipment, design of the main construction machines and mechanisms, technological regulations for special foundations and rough construction, which are supplemented by control and test plans and a plan for securing material resources. As part of other assignments, As part of other assignments, I process occupational health and safety, ecology and environmental protection for selected construction processes, itemized budget for special foundation and rough construction
|
17 |
Stavebně technologický projekt haly ADS s.r.o. Větřkovice / Building Construction Project - Implementation of Production Hall ADS s.r.o. VětřkoviceRáb, Jakub January 2019 (has links)
The subject of my master's thesis is construction technological project of the hall ADS s.r.o. Větřkovice. The work includes technical report of construction technological project, facilities of construction zone, solving traffic routes from the production to the place of construction, study of the implementation of the main technological stages of the building SO02, the most appropriate machine assembly, technological specification for drilled piles and for montage of prefabricated reinforced concrete skeleton, control and test plan, schedule of work, itemized budget, plan of the safety and health protection during work, proposals of design of movement mechanisms and time and financial discretion of realization of the reinforced areas of the production hall area.
|
18 |
Příprava realizace polyfunkčního domu v Pardubicích / Realization of a polyfunctional building PardubiceVýborný, Václav January 2016 (has links)
The main contens of the thesis is solving a construction-technological project substructure and the upper shell construction of a polyfunctional building in Pardubice. Excavation and foundation work are done in section A and B1 and B2. Drilled piles are foundation of a polyfunctional building. Drilled piles are support of reinforced concrete grillage, which are from strips foundation and foundation pads. Cast-in-place concrete frame is a form of load-bearing structure, which contens plate ceilings, pillars and walls. Peripheral masonry is from hellow clay blocks, which are between cast-in-place concrete frame. Diploma thesis includes technical report, plan of building side, schedule and the budget of the building, technological instructions, radon prevent, control and testing plan, safety, balance resources, selected constructional details, machinery composition, bill of quantities.
|
Page generated in 0.0459 seconds