1 |
The Impact of the Cost Schedule Control Systems Criteria on Electronics and Aerospace ContractorsRichardson, Gary Lowell 08 1900 (has links)
The primary purpose of this study was to analyze the capability and inclination of the aerospace and electronics industry contractors to abide by the general provisions of the Cost/Schedule Control Systems Criteria (C/SCSC).
|
Page generated in 0.1092 seconds