• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Event-Based Sensor Data Scheduling : Trade-Off Between Communication Rate and Estimation Quality

Wu, Junfeng, Jia, Qing-Shan, Johansson, Karl Henrik, Shi, Ling January 2013 (has links)
We consider sensor data scheduling for remote state estimation. Due to constrained communication energy and bandwidth, a sensor needs to decide whether it should send the measurement to a remote estimator for further processing. We propose an event-based sensor data scheduler for linear systems and derive the corresponding minimum squared error estimator. By selecting an appropriate eventtriggering threshold, we illustrate how to achieve a desired balance between the sensor-to-estimator communication rate and the estimation quality. Simulation examples are provided to demonstrate the theory. / <p>QC 20130318</p>
2

A scheduling model for a coal handling facility

Swart, Marinda 10 June 2005 (has links)
The objective of this project is to develop an operational scheduling model for Sasol Mining’s coal handling facility, Sasol Coal Supply (referred to as SCS), to optimise daily operations. In this document, the specific scheduling problem at SCS is presented and solved using Mixed Integer Non-Linear Programming (MINLP) continuous time representation techniques. The most recent MINLP scheduling techniques are presented and applied to an example problem. The assumption is made that the results from the example problem will display trends which will apply to the SCS scheduling problem as well. Based on this assumption, the unit-specific event based continuous time formulation is chosen to apply to the SCS scheduling problem. The detail mathematical formulation of the SCS scheduling problem, based on the chosen technique, is discussed and the necessary changes presented to customise the formulation for the SCS situation. The results presented show that the first phase model does not solve within 72 hours. A solution time of more than three days is not acceptable for an operational scheduling model in a dynamic system like SCS. Various improvement approaches are applied during the second phase of the model development. Special Ordered Sets of Type 1 (SOS1) variables are successfully applied in the model to reduce the amount of binary variables. The time and duration constraints are restructured to simplify the structure of the model. A specific linearization and solution technique is applied to the non-linear equations to ensure reduced model solution times and reliable results. The improved model for one period solves to optimality within two minutes. This dramatic improvement ensures that the model will be used operationally at SCS to optimise daily operations. The scheduling model is currently being implemented at SCS. Examples of the input variables and output results are presented. It is concluded that the unit-specific event based MINLP continuous time formulation method, as presented in the literature, is not robust enough to be applied to an operational industrial-sized scheduling problem such as the SCS problem. Customised modifications to the formulation are necessary to ensure that the model solves in a time acceptable for operational use. However, it is proved that Mixed Integer Non-linear Programming (MINLP) can successfully be applied to optimise the scheduling of an industrial-sized plant such as SCS. Although more research is required to derive robust formulation techniques, the principle of using mathematical methods to optimise operational scheduling in industry can dramatically impact the way plants are operated. The optimisation of daily schedules at SCS by applying the MINLP continuous time scheduling technique, has made a significant contribution to the coal handling industry. Finally, it can be concluded that the SCS scheduling problem was successfully modelled and the operational scheduling model will add significant value to the Sasol Group. / Dissertation (MEng (Industrial Engineering))--University of Pretoria, 2006. / Industrial and Systems Engineering / unrestricted

Page generated in 0.0944 seconds