1 |
Applying an Analytical Approach to Shop-Floor Scheduling: A Case StudySwinehart, Kerry, Yasin, Mahmoud, Guimaraes, Eduardo 01 January 1996 (has links)
In the light of the complex and dynamic factors that exist in a typical production facility, manual development of an optimal shop-floor schedule is computationally impractical. This paper discusses the effective use of an heuristic algorithm approach to shop-floor scheduling at the TRW Rack and Pinion Division (RPD) Plant in Rogersville, Tennessee. The study documents the introduction of FAST, a computerised scheduling system that employs the Genetic Optimisation Algorithm. Results demonstrate a real potential advantage using this system for shop-floor scheduling, thus facilitating TRWs journey of continuous improvement.
|
Page generated in 0.1278 seconds