• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Val av byggproduktionsmetod/ Praktikfall Klammerdamm : Golvgips eller avjämningsmassa

Stojnic Dragan, Lindblad Henrik January 2007 (has links)
<p>This report is about how to decide which method is the most suitable as floor covering at project</p><p>Klammerdamm in the centre of Halmstad. The covering has to be fire resistant and soundproof in</p><p>order to protect the wood structure and stop noise from traveling between apartments. There are</p><p>two possibilities either traditional gypsum board or gypsum-based self leveling underlayment.</p><p>The roads around the construction site are narrow. A regular twenty-five meter long truck has no</p><p>possibility to reach the site. The construction site is small and the storage area is limited. Good</p><p>planning is one condition, among many others, that has to be fulfilled to make this project doable.</p><p>All relevant parameters has been taken into account and analyzed with a decision model.</p>
2

Val av byggproduktionsmetod/ Praktikfall Klammerdamm : Golvgips eller avjämningsmassa

Stojnic Dragan, Lindblad Henrik January 2007 (has links)
This report is about how to decide which method is the most suitable as floor covering at project Klammerdamm in the centre of Halmstad. The covering has to be fire resistant and soundproof in order to protect the wood structure and stop noise from traveling between apartments. There are two possibilities either traditional gypsum board or gypsum-based self leveling underlayment. The roads around the construction site are narrow. A regular twenty-five meter long truck has no possibility to reach the site. The construction site is small and the storage area is limited. Good planning is one condition, among many others, that has to be fulfilled to make this project doable. All relevant parameters has been taken into account and analyzed with a decision model.

Page generated in 0.1223 seconds