• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 245
  • Tagged with
  • 245
  • 193
  • 178
  • 177
  • 172
  • 171
  • 169
  • 164
  • 161
  • 161
  • 149
  • 147
  • 144
  • 143
  • 141
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
131

Bytový komplex Netroufalky, objekt F - stavebně technologický projekt / Apartment complex Netroufalky, building F - building technology project

Čermák, Jan January 2020 (has links)
The subject of the diploma thesis is to elaborate a selected part of the construction technology project for an apartment building in the Campus residential complex II, situated in Brno – Bohunice. Specifically, an apartment building (object F, designated SO 204) was selected, on which monolithic structures of the substructure will be solved. The content of the work is a technical report to the construction technology project, evaluation of transport routes, elaboration of technological regulations for selected technological stages, time schedule for the selected stage and partial detailed section of a typical floor. Furthermore, the construction site equipment with drawing and text part, control and test plan, itemized budget with bill of quantities, design of machine assemblies and work safety solutions are elaborated.
132

Volnočasové centrum v Praze, stavebně technologická příprava stavby. / Leisure Center in Prag, civil technical project.

Medvedeva, Svetlana January 2020 (has links)
The diploma thesis solves the construction technology project of the Leisure Center Na Fialce in Říčany near Prague. This construction technology project includes a technical report to the construction technology project, coordination situation with broader links of transport routes, construction time and financial plan, study of im-plementation of the main technological stages, construction site design, design of main construction machines and mechanisms, plan of securing material resources for rough construction of solved objects, technological regulation for implementati-on of insulation of substructure and execution of monolithic reinforced concrete ceiling, inspection and test plan for implementation of insulation of substructure and execution of monolithic reinforced concrete ceiling, safety measures on site and proposal of alternative solution.
133

Administrativní budova v Brně, stavebně technologická příprava stavby. / Administrative bulding in Brno, civil technical projekt.

Romashkyn, Mykola January 2020 (has links)
The subject of this diploma thesis is civil technical project of an administrative building in Brno. The work includes a technical report, a construction technology study, technological prescriptions, proposal of suitable machines and mechanisms required for construction and wider relationships of transport routes to construction site. It also includes control and test plans, a detailed timetable for the main building object, deployment plans for workers, major work machinery and mechanisms, an item budget and a construction site equipment project. Finally, there are drawings of boarding foundations and ceiling structures and a comparison of the two variants of the ceiling structures.
134

Bytový dům AB - Javorová čtvrť II Praha - stavebně technologický projekt / Apartment Building - Javorová čtvrť II Praha - Building Technology Project

Schreiber, Jiří January 2020 (has links)
Theme of the diploma thesis is technical report of the technological project for apartment building AB – Maple district II Prague, which will be realized on Mantovska street, on the plot 539/39 in the district of Horní Měcholupy. For object AB is proccesed technical report of the technological project, studies of realization main technological phases, solution of wider transport relations with a focus on building supply , objects time and financial plan, time schedule, project for site facilities with drawing of five main technological phases, design of main construction machines and mechanisms, technological specification for realization of monolithic reinforced concrete of roughly lower and upper construction, including „white tank“, which forms a peripheral structure of lower construction, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for rough construction, selected points of LEED certification, instructions for using a housing unit and plan of Safety and Helth protection during work.
135

Stavebně technologický projekt vývojového centra v Jaroměři / Constriction-Technological Project of Development Center in Jaroměř

Kytlík, David January 2020 (has links)
The content of this this diploma thesis is structurally technical project of development center in Jaroměř. The building is situated in a V shape and it consists of two production halls and the projection building. Halls and projection building are conected with a special hall. The building of projection have two floors and halls have one floor. The thesis contains a technical report of the construction-technological project, studies of realization of the main technological stages and report of the building equipment. The thesis also deals with design of the main building machines, report of the drilled piles and theirs inspection and test plan. There is also time and financial plan for individual objects and for the main building object, information about safety and healt protection during work and itemized budget. At least is the study of a green roof.
136

Stavebně technologický projekt přípravy a realizace požární stanice v Jaroměři / Construction Project for Station of Fire and Rescue Services in Jaroměř

Nývlt, Josef Unknown Date (has links)
The objective of this diploma thesis is the processing of the construction technology design as a part of the preparation and implementation of the fire station in Jaroměř. It is a new construction of the main building, which is supplemented by other objects and engineering buildings. The thesis deals with complex design of the implementation of the construction and then focuses in more detail on the installation of the supporting frame structure, which consists of reinforced concrete prefabricated elements. The whole project also includes a technical report on the construction technology project, a study of the implementation of the main technological stages of the main building, solutions for transport routes for construction supply, construction site design, machine set design, technological regulations with assembly diagrams, control and test plan, time plans and balance of resource needs, itemized budget and occupational safety and health plan. The diploma thesis is supplemented by a specialized part dealing with the reconstruction of the area road with a bituminous cover and the implementation of other paved areas within the area of the fire station.
137

Posouzení výhodnosti výstavby přečerpávací vodní elektrárny velkého výkonu v lokalitě Cukrová bouda, okres Šumperk / The assessment of advantages of construction of large hydroelectric power plants in the area of Cukrova bouda, district Sumperk

Knápek, Michal January 2012 (has links)
The subject matter of the master´s thesis is, in particular, an evaluation of the advantageousness of the construction of a pumped-storage hydroelectric power station in the vicinity of Cukrová Bouda. In the master´s thesis introduction the utilisation of pumped-storage hydroelectric power stations in providing reserve power generation to the operator of a power transmission system is discussed. The thesis then focuses on a technical design solution where two alternatives are drawn up for which the nominal parameters of individual designs for a pumped-storage hydroelectric power station are specified. The following part deals with the impact of the structure and the plant’s subsequent operation on the environment. A further key part is the determination of investment and subsequent operating costs and an evaluation of the plant according to economic pointers. The final part of the master´s thesis contains a SWOT analysis and an assumed programme of works for the plant’s preparation and actual construction. The conclusion contains an overall evaluation.
138

Implementace systému WPKS v Precheze, a.s. / WPKS System Implementation in Precheza, a.s.

Dýčková, Petra January 2008 (has links)
Intention of this thesis is the Workcenter PKS system implementation project in Precheza a.s., Přerov, implementation outputs and assessment of implementation advantages for the company and its employees. Currently the WPKS system has been purchased and comes over from the analytic phase to the implementation phase. In the designing section I will concentrate on implementation detailed planning, i.e. on detailed elaboration of production process maps, on process sequence designing, project team members and on drawing the total WPKS system implementation schedule. Also, financial contribution of the project will be assessed from the cost and effectiveness point of view.
139

Podnikatelský záměr / Business Plan

Marková, Adéla January 2013 (has links)
The master’s thesis is focused on development of the business plan, particularly the proposal for extending production in the small engineering company Unicode M&D Ltd. The first part deals with the theoretical resources needed for drafting. The second part contains analysis of neighbourhood. The last part presents the specific proposal for extanding production in this company.
140

Využití nástrojů projektového managementu v praxi / The Use of Metohods of the Project Management in Company

Krčmář, Vít January 2015 (has links)
Dissertation deals with a draft of the system for monitoring and planning of attendance of promoters on the stores of the Slovakian store chain NAY, where the project management is used for securing of versatilely effective project. PEST, SWOT, RIPRAN of analysis and analysis of risks are used in this draft. It contains the plan of solution from the schematic imaging to the graphic previews and time schedule of realization. This is the real project from practice which should be realized based on this dissertation and commercially spread and innovated.

Page generated in 0.0423 seconds