11 |
Vyhledávací studie jihozápadního obchvatu Havlíčkova Brodu / Havlíčkův Brod, SE bypass - location studyFischer, Michal Unknown Date (has links)
The diploma thesis deals with a variant solution of the Southwest Bypass of Havlíčkův Brod in the form of a search study. The work aims to find suitable variants of connecting roads I / 34 and I / 38 by the bypass of the village Šmolovy and the town Havlíčkův Brod. The design category of the bypass is S 9.5 / 90. The diploma thesis includes the elaboration of two variant solutions - the northern and southern variants of the Southwest Bypass of Havlíčkův Brod. At the same time, the work deals with the design of modifications and relocations of roads and paths affected by the northern variant of the SW of the Havlíčkův Brod bypass.
|
12 |
Mateřská škola / KindergartenMedová, Jana Unknown Date (has links)
The main aim of the thesis is to design a Kindergarten. It is situated on the west outskirt of the Havlíčkův Brod on the plot no. 653/1 in the cadastral area Havlíčkův Brod. The plot is sloped to the south. The building has two above-ground floors. The ground floor is cross shaped, and we can consist of it on four parts. Three are classrooms with locker room, sanitary facilities for children and bed storeroom. The last part is technical facilities (storerooms, halls, utility room, control room and room for serving food). On the first floor there are offices for teachers, staff room, director’s room, and locker room for employees (cooks, cleaners). Food will be imported to kindergarten. My project is designed like a masonry wall system from sand-lime blocks Silka. Non-load bearing walls are from aerated concrete blocks Ytong. Floor structures are designed as pre-stressed concrete panels. Roof above the ground floor is flat intensive green roof and roof above the first ground floor is flat extensive green roof. The building is heated by two gas boilers in the utility room and and the whole is forcibly ventilated according to two air-conditioning units. I use Archicad 22 for designing my Kindergarten.
|
13 |
Význam finanční analýzy v podniku Měšťanský pivovar Havlíčkův Brod, a.s. / The Significance of a Financial Analysis in MĚŠŤANSKÝ PIVOVAR HAVLÍČKŮV BROD Company (Town Brewery in the town of Havlíčkův Brod)Gryč, Jaroslav January 2008 (has links)
One of the main and most studied areas is the area of determining their own financial situation or the financial health of the company. The definition of financial stability is a financial analysis firm. Thesis contains a presentation of the Burgess Brewery Havlickuv Brod a. s. and estimation her financial situation behind period years 2005 -- 2007. Work is processed using the selected methods of financial analysis, which apply to the enterprise. In addition, possible solutions are proposed and possible measures to improve the financial situation of taking, which underline the importance of financial analysis. Assessment of financial situation begins with horizontal and vertical analysis of statements, working capital analysis and balancing rules. This is followed by analysis of the ratio indicators (liquidity, profitability, debt, and activity), analysis of cash flow and analysis system of indicators (financial lever, Du Pont degradation). Financial analysis is finished the economic normal and the overall indicators (index IN05 and Kralickuv Quick test).
|
14 |
Fitness a Wellness centrum / Fitness and Wellness centerPospíchal, Pavel January 2018 (has links)
The diploma thesis is about design and project documentation of fitness and wellness center. The designed object is situated in the outskirts of Havlíčkův Brod in a quiet environment and with direct connection to the city dam. The object is a three-storey partially-basement building with a flat green roof in three levels. The building is based on the base passages of plain concrete, reinforced concrete slabs and beads. The supporting, peripheral and partition walls are designed from the VELOX system. The outer casing consists of cement slab, reinforced concrete core and thermal insulation. In open-plan areas there are designed reinforced concrete columns. The ceiling structure is predominantly designed from reinforced concrete slabs to lost formwork. Part of the facade is plastered, the other part is ventilated. Individual architectural elements divide the object into units and fit into the natural landscape. The object is divided into several tracts where each has its own purpose and specification. In the 1st floor there is a gym, room for trainers and coordinating training room. In the center there is atrium, reception, cloakroom, buffet and public toilets. Vertical communication is possible using a suspended staircase or a hydraulic lift. On the 1st underground floor there is a reception desk and cloakroom for disabled people. In the western part of the tract there is an indoor pool with whirlpool, of course there are cloakrooms divided for men and women. The eastern part of the tract is used as a technical room of air-conditioning, there are also 3 saunas, including a relaxation room and dressing room. All facilities on the 1st underground floor have access to an outdoor park, including a dam and outdoor whirlpools. In the 2nd floor there is a staffing facility, an area for manegement, technical rooms and an outdoor green terrace. The designed object is designed for disabled people. Around the object there is designed a car park for 33 cars.
|
15 |
Sportovně relaxační centrum v Havlíčkově Brodě / Sports relaxation centre in Havlíčkův BrodBočková, Veronika Unknown Date (has links)
This diploma thesis deals with a project of an sports relaxation centre in Havlíčkův Brod Ledečská street on plots no. 561/1 and 664/17 that are slightly sloping. The building is non-basement with 2 above-ground floors. The exterior load-bearing walls are made of clay blocks complemented with thermal insulation system according to ETICS. The building foundations are designes as strip foundations from concrete. Horizontal load-bearing structures will be made of prestressed concrete floor slab Spiroll. The building is roofed with a warm flat roof. First ground floor consists of sport part, there are big and small gym, crossfit excercise hall, 3 excercises halls for group lessons and 2 squash courts. It is also possible to use workout playground which is approached from the gym. There is also a buffet near the entrance. Second ground floor serves for relaxation, there are salt cave, sauna world with 5 different saunas (Finnish and also steam) and Whirlpool. The sauna world has also a cooling pool. Visitors can also use the outdoor rest area with a cooling pond. There are also a massage room, pedicure/manicure, solarium and sports shop.
|
16 |
Řešení dopravy v centru Havlíčkova Brodu / Traffic situation in the city centre of Havlíčkův Brod and its solutionTobek, Miroslav January 2013 (has links)
The aim of this diploma thesis is the solution of the traffic situation in the city center of Havlíčkův Brod. Mainly the ground road number II/150 adjustment, which consist in the modification of the two-way traffic to one-way traffic organization in the streets Dolní, Žižkova and Na Ostrově by using the analogy of a roundabout layout, is solved within this thesis. All mentioned modifications simplify the traffic situation, improve the orientation and increase the security and the traffic flow mainly in relation to pedestrians and cyclists. Another part of this thesis is focused on revitalization of the public spaces in front of the community center called Ostrov and junction of existing cycle tracks situated on the both banks of the Sázava river. In relation to this topic the adjustment of rainwater sewerage system, low-voltage above ground network, public lighting, communication electric cables, fire brigade signal lights and low-pressure gas pipeline is also solved.
|
Page generated in 0.0182 seconds