• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • No language data
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Critical Analysis of Current Practices of Highway Construction Cost Index (HCCI) Calculation and Utilization

Shrestha, Joseph, Jeong, H. David, Gransberg, Douglas D. 01 January 2016 (has links)
A proper understanding of the local construction market is essential for making appropriate project budgeting and planning decisions. State highway agencies typically use highway construction cost indexes (HCCIs) to understand the current market conditions. In the U.S. highway construction industry, the Federal Highway Administration (FHWA) pioneered the concept of a HCCI as an indicator of the national construction market. State Departments of Transportation (DOT) also started developing their state level HCCIs to better represent their state level construction markets. But, some state DOTs noted the lack of guidance to develop and update their HCCIs. This paper summarizes literature review and nationwide questionnaire survey results to identify the current practices of calculating and using HCCIs. There are two methods to generate basket of construction items for HCCI calculation: a) categorized market basket and b) item level market basket. The Fisher index is the most popular indexing formula among the state DOTs and is also recommended by the FHWA and International Monetary Fund (IMF). Despite many potential users of HCCIs, the current use of HCCIs is very limited in state DOTs.
2

Multidimensional Highway Construction Cost Indexes Using Dynamic Item Basket

Shrestha, Joseph, Jeong, H. David, Gransberg, Douglas D. 01 August 2017 (has links)
A highway construction cost index (HCCI) is an indicator of the purchasing power of a highway agency. Thus, it must reflect the actual construction market conditions. However, current methods used by most state departments of transportation are not robust enough to meet this primary goal due to (1) a significantly insufficient sample size of bid items used in HCCI calculation; and (2) inability to address the need to track highway construction market conditions in specific submarket segments such as, but not limited to, various project types, sizes, and locations. This study proposes an advanced methodology to overcome these apparent limitations using two new concepts: (1) dynamic item basket; and (2) multidimensional HCCIs. The dynamic item basket process identifies and utilizes an optimum amount of bid-item data to calculate HCCIs in order to minimize the potential error due to a small sample size, which leads to a better reflection of the current market conditions. Multidimensional HCCIs dissect the state highway construction market into distinctively smaller sectors of interest and thus, allow state Departments of Transportation to understand the market conditions with much higher granularity. A framework is developed to integrate these two concepts and a standalone prototype system, named the Dyna-Mu-HCCI System, is developed to automate the data-processing part of the framework. The historical bid data of the Montana Department of Transportation are used to evaluate the performance of the Dyna-Mu-HCCI System and measure the effects of the dynamic item basket (DIB) and multidimensional HCCIs. The results show an eightfold increase in terms of the number of bid items used in calculating HCCIs and at least a 20% increase in terms of the total cost of bid items used. In addition, the multidimensional HCCIs reveal different cost-change patterns from different highway sectors. For example, the bridge construction market historically shows a very different trend compared with the overall highway construction market. The new methodology is expected to aid state Departments of Transportation in making more-reliable decisions in preparing business plans and budgets with more accurate and detailed information about the construction market conditions. Further, the prototype Dyna-Mu-HCCI System is expected to significantly facilitate the HCCI calculation process and rapidly implement this new system.

Page generated in 0.18 seconds